High power operation of all the RF systems of J-PARC linac was started for the cavity conditioning in October 2006. Twenty 324-MHz klystrons have supplied the power to the accelerating cavities successfully, and the beam commissioning was started in November 2006. The RF drive and control systems are working well, and required stability is satisfied.
14 November 2022 in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment