Oleg Zagornyak

Oleg Zagornyak

Auto-generated profile, based on publicly available information

Oleg Zagornyak

Academy of Sciences of the Ukraine

Research Focus & Metrics

Academic Career Length

35Years (1992-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 1999 in Engineering Fracture Mechanics
Verified
Journal Article
Closed access
ABA.V. Boiko
A.V. Boiko
LKL.N. Karpenko
L.N. Karpenko
ALA.A. Lebedev
A.A. Lebedev
NMN.R. Muzika
N.R. Muzika
OZO.V. Zagornyak
O.V. Zagornyak

1 October 2021 in Dorogi i Mosti
Verified
Journal Article
Closed access
OZOleg Zagornyak
Oleg Zagornyak
VIVitaliy Ivanchenko
Vitaliy Ivanchenko
Introduction. The development of transport infrastructure plays a key role in the implementation of the state strategy to stimulate the economic development of the eastern regions of Ukraine. Among other things, the most important component is the network of state roads. Some of the roads damaged by the armed conflict in eastern Ukraine remain in poor condition. Problems. The armed conflict in eastern Ukraine in Donetsk and Luhansk oblasts has damaged and destroyed road infrastructure. This in turn has complicated and made road transport more expensive. As a result of the movement of large and heavy military equipment, most often moving in columns, on highways of state and local importance there are potholes, subsidence, destruction of the edges of the pavement, ruts. To improve the situation and bring performance to the relevant standards, a number of State target programs and projects were introduced. But some roads still remain destroyed and need funding for repairs and reconstruction. Purpose. The purpose of the article is to highlight the state and prospects of road infrastructure development in the regions that have been negatively affected by the armed conflict in eastern Ukraine. Materials and methods. During the writing of the article, dialectical methods of scientific knowledge were used to form a list of highways of state importance in the eastern regions of Ukraine, primarily analysis and synthesis. Empirical methods of cognition, such as description, measurement and comparison, are also used. Results. The paper highlights and characterizes the state of road infrastructure in the regions affected by the armed conflict in eastern Ukraine and reveals the prospects for its development. Conclusions. The need to finance the repair and restoration of roads that have not been included in the list of already approved and funded programs, and the formation of clear strategic directions may be provided by the Program of measures for restoration and development of public roads in Donetsk and Luhansk regions. Armed conflict in eastern Ukraine, taking into account the priorities of restoring and building peace, realizing the industrial potential of the eastern regions of Ukraine and the principles of development of the entire network of public roads of state importance of Ukraine. Critical for the implementation of this plan is the adoption by the government of a program for the restoration and development of public roads of state importance in the regions that have been negatively affected by the armed conflict in eastern Ukraine.

3 October 2022 in Dorogi i Mosti
Verified
Journal Article
Closed access
KLKyiv Iits Llc
Kyiv Iits Llc
AVAndrii Vozniuk
Andrii Vozniuk
OZOleg Zagornyak
Oleg Zagornyak
VRVitalii Raikovskyi
Vitalii Raikovskyi
VKVolodymyr Kaskiv
Volodymyr Kaskiv
Introduction. The implementation of the Weighing in Motion System (WIM) in Ukraine has been started in compliance with the State Targeted Economic Program for the Development of Public Highways of State Importance in 2018-2022 and was aimed at preserving the road surface from damaging and reducing expenses for road maintenance. In order to ensure transparency in the field of state planning for the road construction, reconstruction and repair, Ukravtodor ensures the publication of up-to-date WIM information via interactive map http://bit.ly/wiminbrief and annual statistical reports. The paper describes an analysis of traffic volume coefficients based on WIM data. Problems. The need for improving the method of calculating of road pavement structures (non-rigid and rigid) reliability under existing traffic loads, taking into account the WIM data on traffic volume and traffic condition. Purpose. Clarification of traffic conditions and traffic loads on road pavement. Materials and method. Mathematical modelling using survey data. Results. Up-to-date traffic volume coefficients. Conclusions. The implementation of WIM System and WIM sites network expansion is a progressive way for traffic volume and traffic load monitoring and reducing destructive impact of overloaded vehicles on road pavement. WIM data is suitable for traffic load modelling loads and road pavement designing.

1 January 2022 in The National Transport University Bulletin
Verified
Journal Article
Closed access
NVNevinhlovskyi V
Nevinhlovskyi V
ZOZagornyak O
Zagornyak O
SNSokolova N
Sokolova N

30 June 2022 in Automobile Roads and Road Construction
Verified
Journal Article
Closed access
NUNational Transport University
National Transport University
ABAndriy Bubela
Andriy Bubela
OZOleg Zagornyak
Oleg Zagornyak
NSNatalia Sokolova
Natalia Sokolova
It is known that all production resources are limited and rare. This economic problem is especially acute for such major components of natural resources as land, forest resources, mineral deposits, water resources, wildlife, which people use in the production of various goods and without which economic activity is impossible. The planning, construction and operation of roads should be carried out in accordance with environmental standards, and the standards themselves should minimize the impact of road networks on the environment. The high level of concentration of heavy industry, unreasonable scale of land reclamation, environmental voluntarism in the development and location of productive forces and the financing of environmental measures on a residual basis lead to an ecological crisis. The effects of economic activity have led to the pollution of vital resources and the degradation of the environment. This article identifies the nature and extent of the main types of environmental impacts during the overhaul of the facility and its subsequent operation. Measures to prevent negative impact on the environment, such as: rational use of land and natural resources, protection of atmospheric air. Ways and means of normalization of the state of the environment, the main source of which on the highway are directly vehicles and road vehicles are considered. The amount of harmful emissions and the distance of their spread varies depending on the intensity and composition of traffic, road, natural and climatic conditions. In the process of existing potential types of environmental impacts is the impact on ambient air. On the geological environment, microclimate, aquatic environment, soil, flora and fauna. The impact on the environment of the road section after major repairs is permanent and is not harmful provided they are harmoniously combined with nature.

1 December 1992 in Strength of Materials
Verified
Journal Article
Closed access
PDF file
OZO. V. Zagornyak
O. V. Zagornyak
ABA. V. Boiko
A. V. Boiko
ALA. A. Lebedev
A. A. Lebedev