Asril Pramutadi Andi Mustari

Asril Pramutadi Andi Mustari

Auto-generated profile, based on publicly available information

Asril Pramutadi Andi Mustari

Department of Nuclear Engineering, Bandung Institute of Technology (Institut Teknologi Bandung [ITB]), Bandung, Indonesia

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2014 in Nuclear Engineering and Design
Verified
Journal Article
Closed access
AMAsril Pramutadi Andi Mustari
Asril Pramutadi Andi Mustari
YOYoshiaki Oka
Yoshiaki Oka

1 July 2015 in Annals of Nuclear Energy
Verified
Journal Article
Closed access
AMAsril Pramutadi Andi Mustari
Asril Pramutadi Andi Mustari
YOYoshiaki Oka
Yoshiaki Oka
Masahiro FuruyaMasahiro Furuya
Masahiro Furuya
WTWatanabe Takeo
Watanabe Takeo
RCRonghua Chen
Ronghua Chen

1 September 2011 in Progress in Nuclear Energy
Verified
Journal Article
Closed access
AMAsril Pramutadi Andi Mustari
Asril Pramutadi Andi Mustari
MTMinoru Takahashi
Minoru Takahashi

1 May 2013 in Fusion Engineering and Design
Verified
Journal Article
Closed access
AMAsril Pramutadi Andi Mustari
Asril Pramutadi Andi Mustari
MTMinoru Takahashi
Minoru Takahashi

1 January 2011 in Journal of Power and Energy Systems
Verified
Journal Article
Closed access
AMAsril Pramutadi Andi Mustari
Asril Pramutadi Andi Mustari
MTMinoru Takahashi
Minoru Takahashi

1 January 2012 in AIP Conference Proceedings
Verified
Conference Paper
Closed access
MTMinoru Takahashi
Minoru Takahashi
RSRongyuan Sa
Rongyuan Sa
APAsril Pramutadi
Asril Pramutadi
EYEriko Yamaki-Irisawa
Eriko Yamaki-Irisawa
The recent progress of the studies related to lead alloy-cooled reactors (LFR) and the accelerator driven system (ADS) is summarized. The compatibility of materials with lead alloys has been clarified under steady and transient temperature conditions. Higher Cr content, Si and Al addition and Al-Fe alloy-coating improved the corrosion resistance of steels. The Al-Fe alloy-coated steel was not corroded even under high temperature transient conditions. The ceramics of SiC and Si3N4 are expected to be used as cladding material for high temperature LFR. For the analytical consideration of mass transport in lead alloy circuit, the diffusion coefficient of Ni was measured using the capillary methods. A new bubble visualization method in LBE using gamma-ray radiography was developed. The thermal interaction of lead-bismuth eutectic (LBE) and lead droplets with sub-cooled water, and the behaviors of droplet fragmentation were investigated, and the visualization of volatile liquids in high temperature liquids was achieved.