30 December 2018 in Mining of Mineral Deposits
KUKryvyi Rih National University
Kryvyi Rih National University
+1
18 September 2018 in Eastern-European Journal of Enterprise Technologies
In order to keep their positions in the world markets, mining enterprises of the Kryvyi Rih iron ore field using the deep-mine method need to develop a resource-saving technology for the development of the fields represented by complex-structure ore deposits. Development of the resource-saving technology must be carried out at the initial stage which is directly related to ore extraction and affects content of iron in the extracted ore mass. Growth of iron content in the extracted ore mass can be achieved through the use of selective development of the extraction blocks by means of the chamber development systems. The existing procedure of determining structural components of the chamber system of development applied at the Kryvbas mines does not take into account thickness of the overlying strata on the side of the hanging wall of the cleaning chamber when calculating the exposure strike. Therefore, it is necessary to improve the procedure for determining the structural components of the chamber system of development when working out complex ore fields, in order to obtain high extraction rates. For the development of the extraction block, it was suggested to carry out the cleaning works sequentially from the hanging to the lying wall of the complex-structure ore field with the use of the chamber system of development with leaving the non-ore or ore-containing inclusion in the pillar. This sequence of cleaning will reduce concentration of tensile and compressive stresses in the middle part of the non-ore or ore-containing inclusion which will contribute to a 1.5‒2.0-time increase in its stability. It has been established that stability of the cleaning chamber, in addition to its dimensions and physico-mechanical properties of the ore, is influenced by horizontal thickness of the inclusion, safety factor, its life span and the sequence of cleaning in the extraction block. Thus, at the safety factor of rocks of the non-ore inclusion less than 10–12, it is expedient to use the sublevel-chamber version of the development system, otherwise, the horizonal-chamber version.
1 January 2020 in Mining of Mineral Deposits
22 April 2020 in E3S Web of Conferences
The article aims to develop the resource-saving technology when mining steep ore bodies applying 250 mm-diameter boreholes to break ore into the compressed environment. This will reduce dilution of the mined ore mass in conditions of rock pressure around blocks. When mining iron ore deposits of Kryvyi Rih basin, applied mining systems allow for creation of the compensatory space as the first stage. However, these stopes fail under rock pressure, this influencing negatively ore breaking and extraction. The degree of extraction can be increased through breaking ore mass into the compressed environment. The width of the ore layer to be broken onto the compressed environment is determined through industrial investigations. To enhance breaking conditions, it is suggested to apply boreholes of a larger diameter. However, there is no technique developed for determining thickness of the ore layer to be broken depending on the borehole diameter and the fragmentation factor. When applying 250 mm boreholes, increase of thickness of the layer to be broken from 2 to 10 m is found to cause compaction of the previously broken layer up to 3 m with the optimal ore fragmentation factor of 1.3–1.5 and 3-fold decrease of lumps yield. This results from the fact that drilling a 250 mm borehole to secure even provision of the massif with explosives reduces the line of the least resistance.
1 August 2018 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Determining the qualitative composition of the equivalent material for simulation of Kryvyi Rih iron ore basin rocks