Yasuhiro Kodama

Yasuhiro Kodama

Auto-generated profile, based on publicly available information

Yasuhiro Kodama

Advanced Collaborative Research Organization for Smart Society, Waseda University, Tokyo, Japan

Research Focus & Metrics

Academic Career Length

29Years (1998-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 1998 in Physical Review B
Verified
Journal Article
Closed access
PDF file
NHNigel Hussey
Nigel Hussey
JCJ. R. Cooper
J. R. Cooper
YKY. Kodama
Y. Kodama
YNY. Nishihara
Y. Nishihara
The out-of-plane magnetoresistance (MR) of single crystals of La2−xSrxCuO4 has been measured over a wide doping range (0.09<~x<~0.25) with the field applied parallel and perpendicular to the CuO2 planes. Surprisingly, the longitudinal c-axis MR (I∥c,B∥c) is always larger (i.e., more positive) than the transverse MR (I∥c,B∥ab) for all doping concentrations. In addition, for optimally doped and overdoped samples, the longitudinal c-axis MR follows the same temperature dependence as the in-plane transverse MR (I∥ab,B∥c). These observations suggest that c-axis transport in La2−xSrxCuO4 is an incoherent process whereby the carriers undergo significant scattering within the plane before hopping to an adjacent layer.

23 May 2022 in IEEE Access
Verified
Journal Article
Open access
YTYuki Tomizawa
Yuki Tomizawa
YIYuto Ihara
Yuto Ihara
YKYasuhiro Kodama
Yasuhiro Kodama
YIYutaka Iino
Yutaka Iino
YHYasuhiro Hayashi
Yasuhiro Hayashi
JYJun Yoshinaga
Jun Yoshinaga
The use of electric vehicles (EVs) and photovoltaics (PV) is increasing worldwide. Transportation networks require the effective use of renewable energy (RE) for EVs, whereas power networks require local consumption of PV energy, mainly at the initiative of local governments. Although many previous studies have addressed these requirements using private EVs as mobile storages, their uncertainty and uncontrollability remain highly problematic. Therefore, our previous studies focused on electric buses because of their high controllability and certainty. These studies involved the development and evaluation of two independent minimization problems—kilowatts (KW) and kilowatt-hours (KWH) of surplus RE—as a charging schedule optimization method using mixed integer linear programming. However, the feasibility of simultaneously minimizing KW and KWH still presented technical problems. This study aims to extend and generalize the method to the simultaneous minimization of KW and KWH of the PV-derived reverse power flow (RPF). With this multiobjective optimization, the KW peak-cut of the RPF improves the hosting capacity and increases the availability of connectable RE resources, whereas the minimization of KWH promotes the local consumption of RE and decarbonization of public transportation. Two simulations using detailed data of actual bus operations and actual power flow data for a real city confirmed the feasibility of simultaneously optimizing KW and KWH and the relationship between these indicators and number of EV chargers. The optimized charging of the 17 electric buses achieved a maximum of 211.4 kW peak-cut and 1318.4 kWh RE-RPF absorption, reducing CO 2 emissions by 495.7 kg/day.

23 February 2023 in IEEE Transactions on Power Delivery
Verified
Journal Article
Open access
YKYasuhiro Kodama
Yasuhiro Kodama
YHYasuhiro Hayashi
Yasuhiro Hayashi
Natural phenomena such as gale, rain, and lightning cause disconnections, which can disrupt power distribution. Therefore, a method that can estimate the disconnection point (DP) in power distribution lines is needed to ensure public safety and a stable power supply. A simple DP detection method using a common earthing conductor is applied to both residential and industrial areas with only two distribution lines with interconnection points at the ends. However, this method cannot be used in rural areas that have distribution lines without interconnection points. Therefore, we propose a novel DP estimation method for use in distribution lines in rural areas. To this end, an abnormal detection line was installed along a long distribution line with branch lines and ammeters placed at its starting and end points. DP estimation was realized by calculating the time difference between the zero-crossing points of the current flowing in the two ammeters. The DP estimation effectiveness of the proposed method was validated by simulating long distribution lines. Thus, the proposed method can be used to improve the performance of the distribution lines in rural areas.