Philippe Grosclaude

Philippe Grosclaude

Auto-generated profile, based on publicly available information

Philippe Grosclaude

EN, CERN, Geneva Switzerland

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 December 2017 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Open access
SSStoyan Stoynev
Stoyan Stoynev
GAGiorgio Ambrosio
Giorgio Ambrosio
MAMichael Anerella
Michael Anerella
RBRodger Bossert
Rodger Bossert
ECEugenio Cavanna
Eugenio Cavanna
MYMiao Yu
Miao Yu
The development of Nb3Sn quadrupole magnets for the High-Luminosity LHC upgrade is a joint venture between the US LHC Accelerator Research Program (LARP)* and CERN with the goal of fabricating large aperture quadrupoles for the LHC interaction regions (IR). The inner triplet (low-$\beta$) NbTi quadrupoles in the IR will be replaced by the stronger Nb3Sn magnets boosting the LHC program of having 10-fold increase in integrated luminosity after the foreseen upgrades. Previously LARP conducted successful tests of short and long models with up to 120 mm aperture. The first short 150 mm aperture quadrupole model MQXFS1 was assembled with coils fabricated by both CERN and LARP. The magnet demonstrated strong performance at the Fermilab's vertical magnet test facility reaching the LHC operating limits. This paper reports the latest results from MQXFS1 tests with changed pre-stress levels. The overall magnet performance, including quench training and memory, ramp rate and temperature dependence, is also summarized. * The US contributions to the HL-LHC upgrade will be under the US HL-LHC Accelerator Upgrade Project (US HL-LHC AUP)

1 April 2019 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
GWGerard Willering
Gerard Willering
HAHavard Arnestad
Havard Arnestad
MBMarta Bajkó
Marta Bajkó
HBHugues Bajas
Hugues Bajas
LBLorenzo Bortot
Lorenzo Bortot
JRJean-Michel Rifflet
Jean-Michel Rifflet
The $\rm Nb_{3}Sn$ block coil dipole magnet FRESCA2 was developed within the framework of a collaboration between CEA Saclay and CERN, in the continuity of the European project EuCARD and EuCARD2. With an aperture of 100 mm and a target bore field of 13 T at 10.6 kA, the magnet is required for a new FRESCA2 cable test facility at CERN. In 2017 the magnet was pre-loaded to retain the forces while the magnet was powered to achieve 13.3 T in the magnet bore. Results of that tests were published. In 2018 the loading of the magnet has been increased for powering to higher current. In this paper the updated results of the cold powering tests are discussed in terms of training, memory and stable operation. The loading of the magnet and the mechanical measurements during cool down are shown and compared to the earlier loading steps. The protection of the magnet is further reviewed and measured results are compared to the model simulations.

25 January 2018 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
GWGerard Willering
Gerard Willering
CPCarlo Petrone
Carlo Petrone
MBMarta Bajkó
Marta Bajkó
HBHugues Bajas
Hugues Bajas
BBB. Bordini
B. Bordini
JRJean-Michel Rifflet
Jean-Michel Rifflet
The Nb3Sn block-coil dipole magnet FRESCA2 was developed within the framework of a collaboration between CEA Saclay and CERN, follow up of the European project EuCARD. The magnet is aimed at upgrading the cable test facility at CERN to an a bore field of 13 T at 10.6 kA in an aperture of 100 mm as deliverable. The design features four 1.6-m-long double-layer coils wound with a 40 strand, 21-mm-wide Rutherford cable. The first assembly was limited at 12.2 T with a known production defect of the cable close to a splice in one of the coils. Following replacement of this coil, the second assembly reached the target for this run of 13.3 T. In this paper the performance of the assemblies in terms of training behavior, quench detection, protection, magnetic measurements and other cold powering tests will be discussed.

4 December 2017 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Open access
GVGiorgio Vallone
Giorgio Vallone
GAGiorgio Ambrosio
Giorgio Ambrosio
NBNicolas Bourcey
Nicolas Bourcey
EAE. Anderssen
E. Anderssen
DCDaniel W. Cheng
Daniel W. Cheng
SPSoren Prestemon
Soren Prestemon
As part of the High-Luminosity LHC project, a set of Nb$_3$Sn quadrupoles are being developed aiming to enhance the performance of the inner triplets. The new magnets, identified as MQXFA and MQXFB, will share the same cross section with two different lengths, respectively 4.2 m and 7.2 m. During the magnet development, three short models were tested, along with a number of mechanical models, demonstrating the capability of the magnet cross-section to achieve the specified performances. The same performances are now required for the full-length magnets. To ensure this, the authors studied the impact of the magnet length on the capability of the structure to provide an adequate support to the coils. Finite Element and simplified analytical models were used to evaluate the impact of the magnet length on the stresses in the magnet ends and coil elongation during powering. The models were calibrated using the results from the short model tests, and used to provide an indication on the required prestress and its foreseen impact on the magnet performance.

8 February 2019 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
GVGiorgio Vallone
Giorgio Vallone
GAGiorgio Ambrosio
Giorgio Ambrosio
EAEric C. Anderssen
Eric C. Anderssen
HBHugues Bajas
Hugues Bajas
NBNicolas Bourcey
Nicolas Bourcey
TSThomas Strauss
Thomas Strauss
The $\rm Nb_3Sn$ MQXF is being developed as a part of the LHC High Luminosity upgrade. The magnet design was tested on 1.5 m long short models, sharing the same cross-section with the full-length magnets. Various azimuthal and longitudinal preloads were applied, studying the impact on the magnet training and on its mechanical performances. The experiments demonstrated the possibility to control the magnet prestress. However, various factors, coil size among the others, may affect the stress variation between and within each winding. This variation could prevent the magnet to reach the desired performances, for example as result of critical current degradation of the $\rm Nb_3Sn$ strands. This paper analyzes the mechanical performances of the short models, studying in particular the stress variation on different coils. The measured coil size was used as input in the numerical simulations, and results were then compared with the strain gauge measurements. Finally, the short models experience was used to evaluate the feasibility of a loading operation that does not rely on the strain measurements.

27 February 2018 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
ACAntonella Chiuchiolo
Antonella Chiuchiolo
HBHugues Bajas
Hugues Bajas
MBMarta Bajkó
Marta Bajkó
NBNicolas Bourcey
Nicolas Bourcey
MCMorgane Cabon
Morgane Cabon
GVGiorgio Vallone
Giorgio Vallone
The replacement of the LHC Nb-Ti inner triplet magnets with more powerful quadrupole magnets based on Nb3Sn superconductor, as foreseen by the HiLumi LHC Project, has pushed the technology advancement not only in the manufacturing process and tooling but also in the instrumentation. For the short model quadrupole magnet MQXFS-5, fabricated and tested at CERN, fiber optic sensors, based on Fiber Bragg Grating (FBG) technology, have been proposed for monitoring the magnet mechanical behavior from its assembly to its operation in cryogenic conditions. After the experience gained with the FBG integration in short model racetrack coils, the paper deals with the first integration of 16 FBG sensors arranged into 8 fibers and glued on the coils and on the support structure of the Nb3Sn quadrupole. The advantages offered by the FBGs' multiplexing capability has allowed the integration improvement of the FBG-based measuring system in the magnet structure as well as in the test facility. Examples of strain measurements during magnet assembly, cool-down and powering are presented in the paper and compared with strain gauges data.