24 October 2011 in Journal of Building Physics
Air leakage through the building envelope into the building interiors has a considerable impact on the energy loads and consequently energy demand and energy costs of buildings. This phenomenon known as infiltration happens through various openings and venues in the building envelope varying from large openings such as doors and windows to minute cracks and crevices. In addition to impacting building energy loads, infiltration impacts indoor air quality and can result in moisture accumulation problems in the building envelope. A generalized review of infiltration that includes evaluation techniques and models, quantification, and interaction with other heat transfer phenomena is presented in this article.
19 December 2014 in Structural Concrete
7 November 2019 in Engineering, Construction and Architectural Management
Purpose: The public nature of water and wastewater construction capital projects has rendered design-bid-build (DBB) as the delivery method of choice for such projects over the past years. Shortcomings inherent to DBB have had a negative effect on the key performance indicators (KPIs) of these projects. Numerous studies have been published about the benefits offered by integrated project delivery (IPD) in improving the delivery of DBB projects. Links correlating IPD principles to improvements in KPIs of DBB construction projects have not been established scientifically, thus leaving owners with no guidance on which IPD principle(s) to implement in order to improve a particular project KPI. The paper aims to discuss this issue. Design/methodology/approach: Actual data were collected from 43 water and wastewater construction projects – including two control projects with full implementation of selective IPD principles – and used to compute major projects KPIs. Regression analysis and a focus group are then utilized to determine the effect of each implemented IPD principle on various project KPIs. Findings: Implementation of open communication was found to have a significant effect on reducing project cost overrun, and the co-location of teams significantly reduced the time to respond to RFIs. Collaborative decision making significantly reduced the cost of field rework. Other IPD principles showed less-significant effects on project KPIs and were concluded to be ineffective at improving the projects’ performance. Practical implications: An implementation framework is developed that can guide utility owners on which IPD principle(s) to implement in order to improve specific project KPIs. Originality/value: This study demonstrates that not all IPD principles will result in performance improvement of a project. A selective and cost-effective implementation of certain IPD principle will have to be based on the nature of the project and the particular KPIs targeted for improvement.
1 October 2013 in Energy and Buildings
1 January 2017 in Journal of Computing in Civil Engineering
A strong construction safety climate is sought after by governments, owners, and insurance providers. When making safety policy changes, legislative bodies and construction stakeholders alike try to successfully predict the impact such reformative actions will have on emergent safety patterns. Identifying optimal strategies for improving the market’s safety climate is a difficult task to achieve given the complex interactions between the various parties involved. An agent-based model is developed and presented in this case study that mimics the interactions among project stakeholders at the market level within the context of construction safety during both bidding and construction phases. In addition to incorporating various behavioral patterns and financial attributes of contractors and owners, the model makes use of insurance premium models and government fines to simulate safety climate patterns at the project and market levels. The model is shown to be capable of realistically depicting emergi...
1 March 2019 in Journal of Management in Engineering
Water and wastewater construction capital projects are distinctive, highly complex and do not currently have well-established overall performance rating models to assess their projects’ successes. Project performance used for gauging the overall success of project delivery is a complex concept that cannot be measured by one factor. It involves several criteria with many factors that need to be accounted for. Data from 43 water and wastewater projects delivered using the traditional design-bid-build (DBB) delivery method is collected to form a dataset that is utilized to build a project performance rating (PPR) model. The developed PPR model combines the key performance factors of a project into one performance index (PI). The PPR model is tested on a controlled case study project delivered by infusing certain integrated project delivery (IPD) principles into the DBB delivery method. The PPR model showed the implementation of the IPD principles to improve the performance of the case study project by a factor of 1.3. The developed model is a tool that helps utility owners compare the performance of various projects while getting a detailed insight into critical problem areas that are likely to impact performance rating.