Ziyulong Wang

Ziyulong Wang

Auto-generated profile, based on publicly available information

Ziyulong Wang

Delft University of Technology

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 July 2022 in Transportation Research Part C: Emerging Technologies
Verified
Journal Article
Open access
ZWZiyulong Wang
Ziyulong Wang
APAdam J. Pel
Adam J. Pel
TVTrivik Verma
Trivik Verma
PKPanchamy Krishnakumari
Panchamy Krishnakumari
PBPeter van Brakel
Peter van Brakel
NONiels Oort
Niels Oort

23 September 2022 in Journal of Rail Transport Planning & Management
Verified
Journal Article
Open access
ZWZiyulong Wang
Ziyulong Wang
EQEgidio Quaglietta
Egidio Quaglietta
MBMaarten G.P. Bartholomeus
Maarten G.P. Bartholomeus
RGRob M.P. Goverde
Rob M.P. Goverde

4 September 2023 in Journal of Rail Transport Planning & Management
Verified
Journal Article
Open access
ZWZiyulong Wang
Ziyulong Wang
JAJoelle Aoun
Joelle Aoun
CSChristopher Szymula
Christopher Szymula
NBNikola Bešinović
Nikola Bešinović

24 January 2020 in Periodica Polytechnica Transportation Engineering
Verified
Journal Article
Open access
PDF file
YTYuyan Tan
Yuyan Tan
WXWEN XU
WEN XU
ZJZhibin Jiang
Zhibin Jiang
ZWZiyulong Wang
Ziyulong Wang
BSBo Sun
Bo Sun
With the aim of supporting future traffic needs, an account of how to reconstruct an existing cyclic timetable by inserting additional train services will be given in this paper. The Timetable-based Extra Train Services Inserting (TETSI) problem is regarded as an integration of railway scheduling and rescheduling problem. The TETSI problem therefore is considered involving many constraints, such as flexible running times, dwell times, headway and time windows. Characterized based on an event-activity graph, a general Mixed Integer Program model for this problem is formulated. In addition, several extensions to the general model are further proposed. The real-world constraints that concerning the acceleration and deceleration times, priority for overtaking, allowed adjustments, periodic structure and frequency of services are incorporated into the general model. From numerical investigations using data from Shanghai-Hangzhou High-Speed Railway in China, the proposed framework and associated techniques are tested and shown to be effective.

8 August 2025 in Transportation Research Part A: Policy and Practice
Verified
Journal Article
Open access
CYChao Yu
Chao Yu
HLHaiying Li
Haiying Li
ZWZiyulong Wang
Ziyulong Wang
WMWei Ma
Wei Ma
RGRob M.P. Goverde
Rob M.P. Goverde
OCOded Cats
Oded Cats

28 May 2025 in Computers & Industrial Engineering
Verified
Journal Article
Open access
ZWZiyulong Wang
Ziyulong Wang
EQEgidio Quaglietta
Egidio Quaglietta
MBMaarten G.P. Bartholomeus
Maarten G.P. Bartholomeus
ACAlex Cunillera
Alex Cunillera
RGRob M.P. Goverde
Rob M.P. Goverde