Baby Sivanandan Girish

Baby Sivanandan Girish

Auto-generated profile, based on publicly available information

Baby Sivanandan Girish

Indian Institute of Space Science and Technology, Valiyamala, Thiruvananthapuram, India

Research Focus & Metrics

Academic Career Length

23Years (2004-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications

16 March 2004 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
GPG. Prabhaharan
G. Prabhaharan
PAP. Asokan
P. Asokan
BGB.S. Girish
B.S. Girish
AMA. Muruganandam
A. Muruganandam

13 May 2009 in International Journal of Production Research
Verified
Journal Article
Closed access
BGB.S. Girish
B.S. Girish
NJN. Jawahar
N. Jawahar
The general job shop problem is one of the well known machine scheduling problems, in which the operation sequence of jobs are fixed that correspond to their optimal process plans and/or resource availability. Scheduling and sequencing problems, in general, are very difficult to solve to optimality and are well known as combinatorial optimisation problems. The existence of multiple job routings makes such problems more cumbersome and complicated. This paper addresses a job shop scheduling problem associated with multiple job routings, which belongs to the class of NP hard problems. To solve such NP-hard problems, metaheuristics have emerged as a promising alternative to the traditional mathematical approaches. Two metaheuristic approaches, a genetic algorithm and an ant colony algorithm are proposed for the optimal allocation of operations to the machines for minimum makespan time criterion. ILOG Solver, a scheduler package, is used to evaluate the performance of the proposed algorithms. The comparison reveals that both the algorithms are capable of providing solutions better than the solution obtained with ILOG Solver.

1 August 2009
Verified
Conference Paper
Closed access
BGB. S. Girish
B. S. Girish
NJN. Jawahar
N. Jawahar
The classical job shop scheduling problem (JSP) is the most popular machine scheduling model in practice and is well known as NP-hard. The formulation of the JSP is based on the assumption that for each part type or job there is only one process plan that prescribes the sequence of operations and the machine on which each operation has to be performed. Flexible job shop scheduling problem (FJSP) is an extension of the JSP, which allows an operation to be processed by any machine from a given set. Since FJSP requires an additional decision of machine allocation during scheduling, therefore it is much more complex problem than JSP. To solve such NP-hard problems, heuristic approaches are commonly preferred over the traditional mathematical techniques. This paper proposes a particle swarm optimization (PSO) based heuristic for solving the FJSP for minimum makespan time criterion. The performance of the proposed PSO is evaluated by comparing its results with the results obtained using ILOG Solver, a constraint-programming tool. The comparison of the results proves the effectiveness of the proposed PSO for solving FJSP instances.

5 April 2019 in Smart Materials and Structures
Verified
Journal Article
Closed access
PDF file
ADArun DI
Arun DI
PCP Chakravarthy
P Chakravarthy
BGB S Girish
B S Girish
KKK S Santhosh Kumar
K S Santhosh Kumar
BSB Santhosh
B Santhosh

17 February 2024 in Operations Research Perspectives
Verified
Journal Article
Open access
SBSona Babu
Sona Babu
BGB.S. Girish
B.S. Girish