Jia Lin

Jia Lin

Auto-generated profile, based on publicly available information

Jia Lin

Power Grid Research Institute North China Electric Power University Beijing China

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2015
Verified
Conference Paper
Open access
ZYZhao Yu
Zhao Yu
JLJia Lin
Jia Lin
DYDayong Yu
Dayong Yu
DLDongxue Li
Dongxue Li
TJTong Jiang
Tong Jiang
With the country promoting the power from new energy sources, wind power was attached with great importance gradually. However, there is an existing major problem in the field of wind power, that it is the lack of peak-shaving capacity, which leads the capacity of wind power integration to be limited. For solving the problem of the lack of peak-shaving capacity, the models of "equivalent load" and "equivalent power injection" and the wind power integration model based on thermal power peak-shaving capacity is built in this paper, which takes controlling the capacity of wind power integration reasonably as target. The model can forecast the maximum power of wind power integrated in the power grid in real time. The reasonability of the model is verified by an actual example. Furthermore, for obtaining more social benefits and economic benefits, this paper analyzes wind power control strategies in both cases of conventional peak-shaving and deep peak-shaving. Finally, the paper gets the following conclusion. In the case of conventional peak-shaving, wind power should be controlled reasonably according to the peak-shaving capacity of thermal power. In the case of deep peak-shaving, peakshaving cost should be increased for eliminating the crowding-out effect.

1 January 2015
Verified
Conference Paper
Open access
PDF file
JLJia Lin
Jia Lin
ZYZhao Yu
Zhao Yu
DYDayong Yu
Dayong Yu
DLDongxue Li
Dongxue Li
TJTong Jiang
Tong Jiang
Significant development is being encouraged in "wind curtailment" problem for wind energy. To find a reasonable and economical solution to this problem, a quantitative analysis method has been conducted using cost benefit analysis model to obtain the optimal operation point and the critical operation point of specific power grid that is integrated with wind power. It is proposed that wind farm should handle part of the peaking cost when the grid is running beyond critical operation point.