Hani Shahmoradi-Moghadam

Hani Shahmoradi-Moghadam

Auto-generated profile, based on publicly available information

Hani Shahmoradi-Moghadam

Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2016 in Transportation Research Part B: Methodological
Verified
Journal Article
Closed access
AJArmin Jabbarzadeh
Armin Jabbarzadeh
BFBehnam Fahimnia
Behnam Fahimnia
JSJiuh-Biing Sheu
Jiuh-Biing Sheu
HMHani Shahmoradi Moghadam
Hani Shahmoradi Moghadam

1 April 2020 in Engineering Applications of Artificial Intelligence
Verified
Journal Article
Closed access
NHNazanin Haghjoo
Nazanin Haghjoo
RTReza Tavakkoli-Moghaddam
Reza Tavakkoli-Moghaddam
HSHani Shahmoradi-Moghadam
Hani Shahmoradi-Moghadam
YRYaser Rahimi
Yaser Rahimi

22 January 2021 in IEEE Access
Verified
Journal Article
Open access
HSHani Shahmoradi-Moghadam
Hani Shahmoradi-Moghadam
NSNima Safaei
Nima Safaei
SSSeyed Jafar Sadjadi
Seyed Jafar Sadjadi
We study the maintenance task scheduling problem for an aircraft fleet in an uncertain environment from the viewpoint of robust optimization. Given a daily horizon, the maintenance tasks delegated to a shop should be scheduled in such a way that sufficient aircrafts are available on time to meet the demand of planned missions. The tasks are either scheduled maintenance activities or unexpected repair jobs when a major fault is detected during pre- or after-flight check of each mission. The availability of skilled labour in the shop is the main constraint. We propose a robust formulation so that the maintenance tasks duration is subject to unstructured uncertainty due to the environmental and human factors. As a result of the specific structure of the primary model and non-convexity of the feasible space, the classical robust optimization methods cannot be applied. Thus, we propose an $\epsilon $ -Conservative model in tandem with Monte-Carlo sampling to extract the set of all feasible solutions corresponding to various disturbance vectors. Since the one-way sampling-then-optimization approach does not guarantee the probabilistic feasibility, we employ a hybrid simulation-optimization approach to ensure that the solutions provided by the $\epsilon $ -Conservative model are robust to all uncertainty scenarios. The experimental results confirm the scalability of the proposed methodology by generating the robust optimal solutions, satisfying all conservatism levels and uncertainty scenarios irrespective of the problem size.

2 December 2020 in IEEE Access
Verified
Journal Article
Open access
SHSajjad Haider
Sajjad Haider
HSHani Shahmoradi-Moghadam
Hani Shahmoradi-Moghadam
Jörn SchönbergerJörn Schönberger
Jörn Schönberger
PSPeter Schegner
Peter Schegner
With increasing adoption of supply-dependent energy sources like renewables, Energy Storage Systems (ESS) are needed to remove the gap between energy demand and supply at different time periods. During daylight there is an excess of energy supply and during the night, it drops considerably. This paper focuses on the possibility of energy storage in vertically stacked blocks as suggested by recent startups. An algorithm is proposed based on conceptual constraints, to allow for removal and storage of excess electrical energy in the form of gravitational potential energy. To improve these results further, the concepts of wasted energy and unmet demand are used to develop a new mathematical model which aims to minimize the maximum unmet demand in all time periods using lowering and stacking of blocks at specific locations. Simulation results show that for time periods up to a week long, this storage system is able to shift blocks stored in a tower of vertically stacked blocks to reduce unmet demand significantly. This is augmented by storing extra energy from a photovoltaic system, taking account of stochasticity and temporal variability. The authors therefore conclude based on a sensitivity analysis that this system and its associated mathematical optimization can be feasible when scaled up to meet ancillary-level grid storage applications.

1 January 2021 in Operations Research Perspectives
Verified
Journal Article
Open access
HSHani Shahmoradi-Moghadam
Hani Shahmoradi-Moghadam
Jörn SchönbergerJörn Schönberger
Jörn Schönberger

6 August 2016 in Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
Verified
Journal Article
Closed access
HSHani Shahmoradi-Moghaddam
Hani Shahmoradi-Moghaddam
KAKaveh Akbari
Kaveh Akbari
SSSeyed Jafar Sadjadi
Seyed Jafar Sadjadi
MHMahdi Heydari
Mahdi Heydari
For years, there have been tremendous endeavors to reduce makespan in an attempt to decrease the production expenses. This investigation aims to develop a scenario-based robust optimization approach for a real-world flow shop with any number of batch processing machines. The study assumes there are some uncertainties associated with processing times as well as size of jobs. Each machine can process multiple jobs simultaneously as long as the machines’ capacities are not violated. In order to verify this developed model and to evaluate the performance of the proposed robust model, a number of test problems are prepared and a commercial optimization solver is adopted to solve these test problems. For the purpose of validating the results, the robust model and mean-value model are carried out by simulation, which confirmed the proposed model.