Oversizing is widely adopted in photovoltaic systems to increase inverter utilization and improve energy yield. However, higher DC/AC ratios also intensify electrothermal stress, accelerating inverter wear-out and potentially shortening its service life. In this context, this work evaluates DC/AC ratio selection by jointly considering reliability and levelized cost of energy (LCOE). The proposed framework is applied to a 75-kVA three-level neutral-point-clamped (3L-NPC) photovoltaic inverter and integrates lifetime models, Monte Carlo analysis, annual energy estimation, and LCOE evaluation over 25 years, considering panel degradation. In addition, the annual energy estimates are cross-checked against PVsyst simulations using a user-defined inverter with comparable rated power and oversizing capability. Seven DC/AC ratios, ranging from 1.008 to 2.016, are assessed under three Brazilian cities. The results show that the inverter B10 lifetime decreases monotonically with oversizing, whereas the minimum LCOE is site-dependent. The unconstrained LCOE optimum does not meet the reliability targets in two of three scenarios, requiring lower DC/AC ratios, resulting in LCOE differences of 1.39% and 0.31%. These findings show that reliability-constrained oversizing avoids reliability-infeasible designs while incurring only a limited increase in LCOE.
Photovoltaic (PV) generation is a key pillar of the energy transition, but long-term plant performance depends on both PV-module degradation and inverter reliability. Although PV plants are typically designed for 25-year operation, module aging reduces power, while inverters often have short lifetimes. This paper evaluates PV inverter reliability under time-varying PV array power resulting from module degradation and discrete capacity restoration via revamping (e.g., adding new modules). A mission-profile-based framework is used to convert irradiance and ambient temperature into component thermal loading and to estimate damage and lifespan of IGBTs and DC-link capacitors in a 75-kVA three-level neutral-point-clamped (3L-NPC) inverter. To complement the reliability analysis, a techno-economic evaluation is performed using the levelized cost of energy (LCOE). Accounting for degradation increases the prediction from 12.2 to 14.8 years (+21.3%) and LCOE from 40.78 to 42.04 USD/MWh (+3.1%), while all revamping strategies outperform the linear-degradation baseline. Overall, the proposed framework supports more realistic reliability assessment of PV plants and provides insights for revamping planning over the project lifetime.