Rizal Sinaga

Rizal Sinaga

Auto-generated profile, based on publicly available information

Rizal Sinaga

Engineering Management Study Program, Del Institute of Technology, Laguboti, Toba Samosir 22381, Indonesia

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 March 2022 in International Journal of Energy Research
Verified
Journal Article
Open access
RSRizal Sinaga
Rizal Sinaga
Jo DarkwaJo Darkwa
Jo Darkwa
SOSiddig Adam Omer
Siddig Adam Omer
MWMark Worall
Mark Worall

3 December 2023 in Applied Thermal Engineering
Verified
Journal Article
Open access
RSRizal Sinaga
Rizal Sinaga
JDJo Darkwa
Jo Darkwa
MWMark Worall
Mark Worall
WSWeiguang Su
Weiguang Su

6 December 2024 in Journal of Energy Storage
Verified
Journal Article
Open access
RSRizal Sinaga
Rizal Sinaga
JDJo Darkwa
Jo Darkwa
SOSiddig Omer
Siddig Omer
MWMark Worall
Mark Worall

1 September 2016 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
RSR H M Sinaga
R H M Sinaga
PDP S Darmanto
P S Darmanto
Darajat unit III geothermal power plant is developed by PT. Chevron Geothermal Indonesia (CGI). The plant capacity is 121 MW and load 110%. The greatest utilization power is consumed by Hot Well Pump (HWP) and Cooling Tower Fan (CTF). Reducing the utility power can be attempted by utilizing the wet bulb temperature fluctuation. In this study, a modelling process is developed by using Engineering Equation Solver (EES) software version 9.430.The possibility of energy saving is indicated by Specific Steam Consumption (SSC) net in relation to wet bulb temperature fluctuation from 9°C up to 20.5°C. Result shows that the existing daily operation reaches its optimum condition. The installation of Variable Frequency Drive (VFD) could be applied to optimize both utility power of HWP and CTF. The highest gain is obtained by VFD HWP installation as much as 0.80% when wet bulb temperature 18.5 °C.

12 December 2018
Verified
Conference Paper
Open access
YSYuli Yanthi Siagian
Yuli Yanthi Siagian
RSRizal Sinaga
Rizal Sinaga
CSChristoper Sinaga
Christoper Sinaga
YMYosef Manik
Yosef Manik
Toba Samosir Regency is one of the centers of ulos weaving in North Sumatera. Most of the weaving processes are carried out traditionally by small-size enterprises. However, it is identified that there are 8 ulos weaving industries that utilize loom machine. To date, no holistic environmental impact assessment has yet been conducted on weaving industry in Toba Samosir. This study aims to assess potential environmental impact caused by weaving industry in Toba Samosir. The scope of this study covers gate-to-gate stages in ulos production, consisting mangiran, washing, dipping, drying, dying, boiling, sun-drying, weaving, and manirat. The functional unit of this study is 182 kg of ulos, representing one batch of production. The assessments are conducted by two approaches; these are Life Cycle Assessment and Eco-efficiency Index measurement. The LCA modeling and computation of environmental impacts are aided by openLCA software. From LCA, it is revealed that the potential environmental impacts associated with ulos weaving are Eutrophication Potential (5.28E+01 kg PO4 eq - 8.41E+01 kg PO4 eq), Climate Change Potential (7.17E+02 kg CO2 eq - 5.74E+02 kg CO2 eq), and Photochemical Oxidation Potential (3.40E+00 kg CFC-11 eq - 4.68E+01 kg CFC-11 eq). The major stressors causing these impacts are using firewood. The calculation result of Eco-Efficiency Index (EEI) for weaving industry in Toba Samosir Regency falls between 0,1 and 0,4, which indicates the product is affordable but not sustainable..

5 March 2018 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
RSR H M Sinaga
R H M Sinaga
YMY Manik
Y Manik
Sibayak Geothermal Power Plant (SGPP) is one of the plants being developed by Pertamina Geothermal Energy (PGE) at the upstream phase. At the downstream phase, State - owned Electricity Company (PLN) through PT. Dizamatra Powerindo is the developer. The gross capacity of the power plant is 13.3 MW, consisting 1 unit of Monoblock (2 MW) developed by PGE and 2 units (2×5.65 MW) operated through Energy Sales Contract by PLN. During the development phase of a geothermal power plant, there is a chance to reduce the utility power in order to increase the overall plant efficiency. Reducing the utility power can be attempted by utilizing the wet bulb temperature fluctuation. In this study, a modeling process is developed by using Engineering Equation Solver (EES) software version 9.430. The possibility of energy saving is indicated by condenser pressure changes as a result of wet bulb temperature fluctuation. The result of this study indicates that the change of condenser pressure is about 50.8% on the constant liquid/gas (L/G) condition of the wet bulb temperature of 15°C to 25°C. Further result indicates that in this power plant, Cooling Tower Fan (CTF) is the facility that has the greatest utility load, followed by Hot Well Pump (HWP). The saving of the greatest utility load is applied trough Variable Frequency Drive (VFD) instrumentation. The result of this modeling has been validated by actual operations data (log sheet). The developed model has also been reviewed trough Specific Steam Consumption (SSC), resulting that constant L/G condition allows the optimum condition on of the wet bulb temperature of 15°C to 25°C.