Biljana Matejević-Nikolić

Dr. Biljana Matejević-Nikolić

Faculty of civil engineering and architecture, Niš, Serbia
orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 October 2022 in Buildings
Verified
Journal Article
Open access
PDF file
BMBiljana Matejević-Nikolić
Biljana Matejević-Nikolić
LŽLazar Živković
Lazar Živković
One of the most important tasks of managing the construction process is to achieve the highest possible productivity. The productivity that can be achieved on a construction site depends on a number of influencing factors and on the type of work that is executed. Concrete works are a crucial activity when constructing high-rise buildings built in the RC frame structural system. Therefore, it is very important to adequately manage the concreting process in order to meet the set deadlines and reduce costs. This paper presents an approach for predicting the productivity of the concreting process based on the conducted quantitative research, by recording the concreting process on construction sites of buildings in Niš, Serbia. The concreting of reinforced concrete columns and walls on seven construction sites was recorded for 20 months. The total amount of fresh concrete that is built into the elements is 848 m3 and the total duration is 114 h of work. Factors that can affect productivity have been identified and, by applying the multiple linear regression and simulation methods and techniques and using the discrete event method and the agent-based method, models have been developed to predict the productivity of the concreting of reinforced concrete columns and walls. An analysis of the developed models was performed, and a comparative presentation was provided.

1 December 2018 in Tehnicki vjesnik - Technical Gazette
Verified
Journal Article
Open access
PDF file
BMBiljana Matejević-Nikolić
Biljana Matejević-Nikolić
MZMilorad Zlatanović
Milorad Zlatanović
DCDusan Cvetkovic
Dusan Cvetkovic
This paper presents an approach to predicting the productivity of the concreting process based on a conducted quantitative research involving the recording of concreting at building construction sites in the city of Nis, Serbia. In the...

1 August 2017 in Journal of the Croatian Association of Civil Engineers
Verified
Journal Article
Open access
PDF file
BMBiljana Matejević-Nikolić
Biljana Matejević-Nikolić
MZMilorad Zlatanović
Milorad Zlatanović
PRPregledni Rad
Pregledni Rad
Regression model for predicting productivity of RC slab concreting process This paper provides a model that will ensure effective management of concreting process already at the planning stage, by predicting productivity to reduce costs and shorten the project completion time. Eighty-one RC slab concreting processes were monitored and registered on eight building construction sites. The factors that may affect productivity were identified and a multiple linear regression method was used to develop models for predicting productivity and estimating duration of the slab concreting process.

1 January 2018 in Facta universitatis - series: Architecture and Civil Engineering
Verified
Journal Article
Open access
PDF file
BMBiljana Matejević-Nikolić
Biljana Matejević-Nikolić
MZMilorad Zlatanovic
Milorad Zlatanovic
During constructing of any structure, there are a large number of factors impacting the total performance of the construction site. One of very important factors is productivity. Because of the specific nature and importance of concreting works, when constructing a building structure, it is necessary to pay a special attention to execution of these works. In this paper is analyzed the productivity in general sense, as well as productivity in civil engineering, with a focus on productivity in the course of concreting works. The importance of concreting works is emphasized, and the concreting works technology is described. A review and a description of the factors affecting the concreting process productivity are provided. A productivity analysis is performed on the concrete construction site based on the data obtained by recording the concreting process, and some of the results are provided.

15 February 2023 in Tehnicki vjesnik - Technical Gazette
Verified
Journal Article
Open access
PDF file
BMBiljana Matejević-Nikolić
Biljana Matejević-Nikolić
LŽLazar Živković
Lazar Živković
Supply of Ready Mixed Concrete (RMC) is a common process of concrete works on any structure. There is often a need to supply one or more construction sites simultaneously from multiple concrete plants. This paper presents a new simulation model of RM...

16 August 2023 in Periodica Polytechnica Civil Engineering
Verified
Journal Article
Closed access
PDF file
MMMiloš Milić
Miloš Milić
TVTodor Vacev
Todor Vacev
Predrag PetronijevićPredrag Petronijević
Predrag Petronijević
INIvan Nešović
Ivan Nešović
AZAndrija Zorić
Andrija Zorić
BMBiljana Matejević-Nikolić
Biljana Matejević-Nikolić
Steel-timber composite structures have numerous advantages compared to steel only and timber only structures. One of the most important parts of a composite structure is the composite connection. Object of this research was a steel-CLT composite connection consisting of a steel profile, a cross-laminated timber (CLT) panel and a bolt with nut and washer. Aim of the research was to develop an efficient finite element (FE) model of a bolted steel-CLT composite connection and to validate it experimentally. The research process consisted of several steps: experimental testing of the considered connection using asymmetrical push-out test, numerical modelling and analysis of the connection using Finite Element Method (FEM), validation of the numerical model using experimental results, and parametric study of the proposed numerical model. For numerical analysis, an innovative method for timber modelling has been proposed. The comparison between the experimental and numerical research results demonstrated that the proposed numerical model was convenient for practical application in structure analyses. The parametric study showed that, in some cases, atypical failure modes of the connection occurred. Based on registered behavior, a recommendation is given to calculate the load capacity of the connection integrally, taking into account both the primary (Johansen’s) and the secondary (rope effect) part of the connection strength, instead partially, as proposed by EN standards.