Shield tunnel segment uplift is a common phenomenon in construction. Excessive and unstable uplift will affect tunnel quality and safety seriously, shorten the tunnel life, and is not conducive to the sustainable management of the tunnel’s entire life cycle. However, segment uplift is affected by many factors, and it is challenging to predict the uplift amount and determine its cause accurately. Existing research mainly focuses on analyzing uplift factors and the uplift trend features for specific projects, which is difficult to apply to actual projects directly. This paper sorts out the influencing factors of segment uplift and designs a spatial-temporal data fusion mechanism for prediction. On this basis, we extract the key influencing factors of segment uplift, construct a prediction model of segment uplift amount based on Extreme Gradient Boosting (XGBoost) v2.0.3, and use SHapley Additive exPlanation (SHAP) v0.44.0 to locate factors affecting uplift, forming an Auxiliary Decision-making System for Segment Uplift Control (ADS-SUC). An ADS-SUC not only detects the sudden change of the segment uplift successfully and predicts the segment uplift in practical engineering accurately, it also provides a feasible method to control the uplift in time, which is of great significance for reducing the construction risk of the tunnel project and ensuring the quality of the completed tunnel.
Ground settlement is a crucial indicator for assessing the safety of shield tunneling and its impact on the surrounding environment. However, most existing settlement prediction methods are based on historical data, which can only be applied with effective monitoring conditions. To overcome this limitation, this paper proposes the mechanism-driven intelligent settlement prediction method (MISPM), which considers the mechanisms of settlement and attitude movements during construction to design new features that can indirectly reflect settlement. Simulation experiments were used to compare the impact of different candidate features and algorithms on prediction performance, verifying the validity and accuracy of the model. The efficacy of MISPM in predicting settlement changes in advance was substantiated by practical engineering applications. Results showed that MISPM could accurately predict settlement changes even without ground monitoring, thereby corroborating its reliability and applicability in supporting safe tunneling in complex geological environments. In the construction of urban infrastructure, this method has the potential to enhance the efficiency of tunnel construction and ensure environmental safety, which is of great significance for the development of smart cities.