The main stages of printed circuit board (PCB) manufacturing are the design, fabrication, assembly, and testing. This paper focuses on the scheduling of the pressing process, which is a part of the fabrication process of a multi-layer PCB and is a new application since it has never been investigated in the literature. A novel mixed-integer linear programming (MILP) formulation for short-term scheduling of the pressing process is presented. The objective function is to minimize the makespan of the overall process. Moreover, a three-phase-PCB-pressing heuristic (3P-PCB-PH) for short-term scheduling of the pressing process is also presented. To illustrate the proposed MILP model and 3P-PCB-PH, the test problems generated from the real data acquired from a PCB company are solved. The results show that the proposed MILP model can find an optimal schedule for all small- and medium-sized problems but can do so only for some large-sized problems using the CPLEX solver within a time limit of 2 h. However, the proposed 3P-PCB-PH could find an optimal schedule for all problems that the MILP could find using much less computational time. Furthermore, it can also quickly find a near-optimal schedule for other large-sized problems that the MILP could not solved optimally.
The increasing penetration of renewable energy sources (RESs), particularly solar photovoltaic (PV) sources, has introduced significant uncertainty into power system operations, challenging traditional scheduling models and threatening system reliability. This study proposes a Fuzzy Unit Commitment Model (FUCM) designed to address uncertainty in load demand, solar PV generation, and spinning reserve requirements by applying fuzzy linear programming techniques. The FUCM reformulates uncertain constraints using triangular membership functions and integrates them into a mixed-integer linear programming (MILP) framework. The model’s effectiveness is demonstrated through two case studies: a 30-generator test system and a national-scale power system in Thailand comprising 171 generators across five service zones. Simulation results indicate that the FUCM consistently produces stable scheduling solutions that fall within deterministic upper and lower bounds. The model improves reliability metrics, including reduced loss-of-load probability and minimized load deficiency, while maintaining acceptable computational performance. These results suggest that the proposed approach offers a practical and scalable method for unit commitment planning under uncertainty. By enhancing both operational stability and economic efficiency, the FUCM contributes to the sustainable management of RES-integrated power systems.
The increasing integration of renewable energy sources and the widespread adoption of electric vehicles have introduced considerable uncertainty into the operation of large-scale power systems. Traditional deterministic unit commitment models are insufficient for managing such variability in a reliable and cost-effective manner. This study proposes a two-stage stochastic unit commitment model that captures uncertainties in solar photovoltaic generation, electric vehicle charging demand, and load fluctuations using a mixed-integer linear programming framework with recourse. The model is applied to Thailand’s national power system, comprising 171 generators across five regions, to assess its scalability for sustainable large-scale planning. Results indicate that the stochastic model significantly enhances system reliability across most demand profiles. Under the Winter Weekday group, the number of lacking scenarios decreases by 76.92 percent and the number of missing periods decreases by 78.57 percent, while the average and maximum lack percentages are reduced by 56.32 percent and 72.61 percent, respectively. Improvements are even greater under the Rainy Weekday group, where lacking scenarios and periods decline by more than 92 percent and the maximum lack percentage falls by over 98 percent, demonstrating the model’s robustness under volatile solar output and load conditions. Although minor anomalies are observed, such as slight increases in average and maximum lack percentages in the Summer Weekday group, these are minimal and likely attributable to randomness in scenario generation or boundary effects in optimization. Overall, the stochastic model provides substantial advantages in managing uncertainty, achieving notable improvements in reliability with only modest increases in operational cost and computational time. The findings confirm that the proposed approach offers a robust and practical framework for supporting sustainable and resilient power systems in regions with high variability in both generation and demand.
The pressing process is a part of the fabrication process of multi-layer printed circuit board (PCB) manufacturing. This paper presents the application of a new mixed-integer linear programming model to the short-term scheduling of the pressing process. The objective was to minimize the makespan. The proposed model is an improvement from our previous model in the literature. The size complexity of the proposed model is better than that of the previous model, whereby the number of variables, constraints, and the dimensionality of variables in the previous model are reduced. To compare their performance, problems from literature and additional generated test problems were solved. The proposed model was shown to outperform the previous model in terms of computational complexity. It can verify a new optimal solution for some problems. For the problems that could not be solved optimally, the proposed model could find the incumbent solution using much less computational time than the previous model, and the makespan of the incumbent solution from the proposed model was better than or equal to that of the previous model. The proposed model can be a good option to provide an optimal schedule for the pressing process in any PCB industry.
Entropy multi-hyperplane credit scoring model is a decision model that classifies applicants into payers or defaulters by optimizing the classification cost using multiple hyperplanes based on entropy order. In the first stage, the model uses a pair of hyperplanes composed of half of the attributes which are ordered increasingly by the entropy. The hyperplanes divide the applicants into 3 groups, namely payers, defaulters and the unclassified. From the unclassified group, the model uses another pair of hyperplanes which are composed of additional half of the rest of attributes based on the previous entropy order. The additional hyperplanes divide the unclassified group in the first stage into another 3 group namely payers in 2nd stage, defaulters in 2nd stage and the unclassified in 2nd stage. In the final stage, the multidimensional hyperplanes created from all attributes are used to divide the loaners into two groups : payers and defaulters. In this paper, a mixed-integer programming model for entropy multi-hyperplane credit scoring model is developed to minimize the cost of misclassification errors. The experiment shows that our model has more accuracy than a two-stage least cost credit scoring model and uses less computational iterations than a multi-hyperplane credit scoring model. Moreover, the new model exhibits comparable result with classification tree, neural network, support vector machine, linear discriminant analysis and CART.