F K Bondinuba

Prof. F K Bondinuba

Construction Technology and Quntity Surveying, Kumasi Technical University, Kumasi, Ashanti, Ghana
+2
orcid
Hononary Research Professor, Faculty of Engineering and the ...

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2017 in Bioresource Technology
Verified
Journal Article
Closed access
Philip AntwiPhilip Antwi
Philip Antwi
JLJianzheng Li
Jianzheng Li
PBPortia Opoku Boadi
Portia Opoku Boadi
Jia MengJia Meng
Jia Meng
ESEn Shi
En Shi
F K BondinubaF K Bondinuba
F K Bondinuba

13 April 2018 in Buildings
Verified
Journal Article
Open access
PDF file
JDJohn Dadzie
John Dadzie
GRGoran Runeson
Goran Runeson
MNManh Nguyen
Manh Nguyen
F K BondinubaF K Bondinuba
F K Bondinuba
Globally, only 2% of existing building stock is built yearly; the remaining 98% already exist. Energy consumption and indoor thermal comfort of the existing building stock are not encouraging. This is due to many challenges associated with existing buildings; the challenges range from cracks, leakages, poor insulation, heat losses and high rate of unsustainable technologies. This paper investigates possible barriers facing the adoption and application of sustainable technologies (STs) for sustainable or energy-efficient upgrade of existing buildings. New STs are manufactured on a regular basis to meet improved energy efficiency standards, yet there are minimal actions/attempts to adopt and apply improved technologies in existing buildings for energy efficiency. Indeed, there are limited studies focused on the use of qualitative approaches to identify barriers to adoption and use of STs. Thus, a semi-structured interview approach was adopted and applied using sustainability/energy efficiency professionals, building services engineers, project managers, architects, and facility managers in Australia. The results indicate that barriers to the adoption and application of sustainable technologies are perceived benefits in demolish-and-build, age of building, cost of STs, perceived poor payback time, unreliable energy-savings projections, existing design, hidden and overall cost of renovation, and cost of STs.

9 December 2024 in Engineering, Construction and Architectural Management
Verified
Journal Article
Open access
PDF file
IMIseoluwa Joanna Mogaji
Iseoluwa Joanna Mogaji
MMModupe Cecilia Mewomo
Modupe Cecilia Mewomo
F K BondinubaF K Bondinuba
F K Bondinuba
Purpose: While innovative building materials (IBM) have emerged as a promising solution for addressing the global construction industry’s environmental, economic and social challenges, their adoption is plagued with increasing challenges in the Nigerian construction industry (NCI). To provide practical strategies to overcome the present IBM challenges in the NCI, the barriers that hinder its successful adoption need detailed investigation. Consequently, this study examines the barriers that affect the adoption of IBM for sustainable construction (SC) in the NCI. Design/methodology/approach: A quantitative research approach was used to obtain primary data from 282 construction professionals, viz. architects, builders, engineers and quantity surveyors, via a closed-ended questionnaire survey. Data were analysed using a mean item score (descriptive analysis) and exploratory factor analysis (inferential analysis). Findings: The study revealed the top five most significant barriers to IBM adoption in the NCI. These barriers include lack of awareness and knowledge, learning/training period, cost and economic viability, lack of qualified staff and lack of end-user involvement. Factor analysis revealed five components of barriers: resource and policy-related barriers, perception and cultural-related barriers, organisational-related barriers, awareness and market-related barriers and resistance and stakeholder engagement-related barriers. Practical implications: The findings of this study have several practical implications for construction professionals, policymakers and other stakeholders in Nigeria. The study highlights the need for increased awareness and technical expertise to promote the adoption of IBM in the NCI. The study also recommends several practical strategies for overcoming the barriers to IBM adoption and promoting SC practices in Nigeria, such as fostering a positive perception of sustainable concepts, fostering stakeholder support and involvement and promoting a more conducive environment for adopting sustainable practices. The implication of this study transcends the local context, offering a model for other countries to consider, thereby contributing to a global shift towards sustainable construction practices. Social implications: The findings highlight the critical role of societal attitudes and awareness in adopting IBM, suggesting the need for educational and awareness programmes to shift public and organisational perception. This shows the importance of cultural change and societal readiness to embrace sustainable construction practices. Originality/value: This study contributes significantly to knowledge of the barriers to adopting IBM for SC in NCI. Findings from the study will inform policymakers, industry professionals and other stakeholders about the key barriers that require attention and intervention, facilitating the initiatives to overcome these barriers effectively.

25 July 2013 in Current Research Journal of Social Sciences
Verified
Journal Article
Open access
PDF file
SNSimon Gyasi Nimako
Simon Gyasi Nimako
F K BondinubaF K Bondinuba
F K Bondinuba
This study, which was part of a large study, empirically examinesthe importance students attach to different dimensions of Student Accommodation Quality (SAQ) delivered by Student Accommodation Providers (SAP) in two tertiary (higher education) institutions in Ghana. The study involved a cross-sectional survey that used a structured questionnaire administered to 700 tertiary students in residential and non-residential accommodation. The survey yielded a usable 66.6% response rate for analysis. The findings indicate that utility facility quality is the most important SAQ dimension to the students, followed by the overall impression of hostel, security, physical environment, toilet, distance to lecture, bedroom, bath room, accommodation fee, among others. Moreover, it was found that kitchen facility, access to transport and entertainment facility are less important SAQ items while the least important is garage facility. Few differences were found in the priority for SAQ items between COLTEK and K-Poly respondents and between residential and non-residential respondents. Implications for theory and recommendations to management of the two higher education institutions and SAP have been discussed. The study contributes to the body of knowledge in student affairs and managing student accommodation quality in higher education.

10 September 2024 in Built Environment Project and Asset Management
Verified
Journal Article
Closed access
SASamuel Owusu Asare
Samuel Owusu Asare
GFGodfred Fobiri
Godfred Fobiri
F K BondinubaF K Bondinuba
F K Bondinuba
Purpose: Ghana’s legal framework for procurement has undergone substantial reform to increase its efficacy. However, disregard for legal obligations set forth has resulted in issues of fraud, corruption and poor oversight. This study seeks to synthesize literature on the recognition of legal obligations arising from tendering procedures and measures to promote fairness, transparency and accountability under Ghana’s procurement framework.Design/methodology/approach: Legal frameworks and publications from diverse countries have been synthesized using a systematic literature review across three databases (Scopus, JSTOR and HeinOnline) to illuminate key concepts, issues and best practices relevant to the study. Data obtained from included publications was synthesized using Sandelowski and Barroso’s two-step approach by using a qualitative meta-summary and thematic synthesis.Findings: The study reveals that issues of conflict of interest, corruption, lack of capacity, inadequate oversight and insufficient legal follow-through hinder the effectiveness of procurement regulations. The findings highlight the need for targeted improvements in resource allocation for consistent application of transparency measures, regular publication of notices and robust enforcement of accountability mechanisms. The report proposes the creation of a common data environment for networking and information dissemination, implementing feedback systems and trust rating schemes.Practical implications: The study contributes to the body of knowledge on procurement regulation by providing a thorough analysis of Ghana’s procurement framework. The findings will help policymakers close the observed implementation gaps by guiding the revision of current legislation and the introduction of new regulations. Research findings can be used to guide the creation of focused training courses.Originality/value: This study, one of the first of its kind in Ghana, examines the current procurement framework, including legal obligations and implementation challenges. It contributes to the body of knowledge on the subject by providing a current and fact-based analysis as well as relevant recommendations for strengthening the framework.

20 February 2025 in Buildings
Verified
Journal Article
Open access
PDF file
AEAlex Kojo Eyiah
Alex Kojo Eyiah
F K BondinubaF K Bondinuba
F K Bondinuba
LALucy Adu-Gyamfi
Lucy Adu-Gyamfi
MLMurendeni Liphadzi
Murendeni Liphadzi
This study investigates the management of cultural diversity and its implications for the success of infrastructure projects. It was conducted qualitatively at a multinational organisation, involving twelve semi-structured interviews with participants from Europe, Asia, America, and Africa. Content analysis identifies relevant units and categories based on theory and empirical data. A positive work environment promotes flexibility in decision-making through effective communication, problem-solving, and distinctive familial characteristics. Key success factors include effective communication, team building, strong relationships, language barriers, diverse perspectives, mutual respect, hygiene, safety, welfare facilities, and technical challenges. Successful construction firms integrate changes in cross-cultural team selection, joint decision-making, communication, teamwork, effective people selection, and project selection, enabling consistent high-performance levels across various organisational levels in project teams. Project managers can enhance team dynamics, productivity, and project success by promoting cultural diversity through training in interpersonal skills, language proficiency, and cultural intelligence, encouraging collaboration, clear goals, and inclusive decision-making processes. The paper explores Ghana’s multicultural diversity through interviews and case studies, highlighting its underexplored and understudied topic in gas-to-power projects. This paper has generalizability limitations based on one case study.