Generative Pre-Trained Transformer (GPT) language models such as ChatGPT have the potential to revolutionize the construction industry by automating repetitive and time-consuming tasks. This paper presents a study in which ChatGPT was used to generate a construction schedule for a simple construction project. The output from ChatGPT was evaluated by a pool of participants that provided feedback regarding their overall interaction experience and the quality of the output. The results show that ChatGPT can generate a coherent schedule that follows a logical approach to fulfill the requirements of the scope indicated. The participants had an overall positive interaction experience and indicated the potential of such a tool in automating many preliminary and time-consuming tasks. However, the technology still has limitations, and further development is needed before it can be widely adopted in the industry. Overall, this study highlights the advantages of using large language models and Natural Language Processing (NLP) techniques in the construction industry and the need for further research.
The counterpart of Industry 4.0 in the AEC/FM industry is known as Construction 4.0. Its essence is the digitalization and automation of the AEC/FM industry. As robots and other technologies make their way into the different phases of the lifecycle of construction projects, the concern about the future of jobs and wages will increase. While the use of robotics has the potential to improve productivity and safety, it should not necessarily reduce total employment in the construction sector in the long run. It is expected that existing roles will evolve, and new roles will be created (e.g., in addition to designers there will be a need for employees with digital skills). Focusing on the construction phase of a robotically built concrete wall, the different roles were evaluated. From this study, it was found that there will be a time in which conventional construction and robotic technologies will coexist, leading to a higher job variability and new roles, both at the managerial and operations/execution levels. Although this study is not meant to be an exact representation of how the AEC/FM roles will change as a consequence of Construction 4.0, it opens the debate and research in this area.