Chang Jun Lee

Dr. Chang Jun Lee

Pukyong National Unitversity
orcid

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 February 2018 in Industrial & Engineering Chemistry Research
Verified
Journal Article
Closed access
HYHye Jin Yang
Hye Jin Yang
KHKyu Suk Hwang
Kyu Suk Hwang
Chang Jun LeeChang Jun Lee
Chang Jun Lee

18 June 2008 in Desalination
Verified
Journal Article
Closed access
SASung Joon Ahn
Sung Joon Ahn
Chang Jun LeeChang Jun Lee
Chang Jun Lee
YJYunju Jung
Yunju Jung
CHChonghun Han
Chonghun Han
EYEn Sup Yoon
En Sup Yoon
GLGibaek Lee
Gibaek Lee

1 March 2011 in Industrial & Engineering Chemistry Research
Verified
Journal Article
Closed access
Chang Jun LeeChang Jun Lee
Chang Jun Lee
VPVinay Prasad
Vinay Prasad
JLJong Min Lee
Jong Min Lee

19 October 2019 in Process Safety and Environmental Protection
Verified
Journal Article
Closed access
BJByunggon Jung
Byunggon Jung
Chang Jun LeeChang Jun Lee
Chang Jun Lee

7 December 2017 in Korean Journal of Chemical Engineering
Verified
Journal Article
Closed access
PDF file
KLKwang Oh Lee
Kwang Oh Lee
JPJae Yeon Park
Jae Yeon Park
Chang Jun LeeChang Jun Lee
Chang Jun Lee

1 January 2015 in Industrial Health
Verified
Journal Article
Open access
Chang Jun LeeChang Jun Lee
Chang Jun Lee
In the fields of researches associated with plant layout optimization, the main goal is to minimize the costs of pipelines and pumping between connecting equipment under various constraints. However, what is the lacking of considerations in previous researches is to transform various heuristics or safety regulations into mathematical equations. For example, proper safety distances between equipments have to be complied for preventing dangerous accidents on a complex plant. Moreover, most researches have handled single-floor plant. However, many multi-floor plants have been constructed for the last decade. Therefore, the proper algorithm handling various regulations and multi-floor plant should be developed. In this study, the Mixed Integer Non-Linear Programming (MINLP) problem including safety distances, maintenance spaces, etc. is suggested based on mathematical equations. The objective function is a summation of pipeline and pumping costs. Also, various safety and maintenance issues are transformed into inequality or equality constraints. However, it is really hard to solve this problem due to complex nonlinear constraints. Thus, it is impossible to use conventional MINLP solvers using derivatives of equations. In this study, the Particle Swarm Optimization (PSO) technique is employed. The ethylene oxide plant is illustrated to verify the efficacy of this study.