Eelon Mikael Lappalainen

Dr. Eelon Mikael Lappalainen

Aalto University, Espoo, Uusimaa, Finland
orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 July 2021 in Engineering, Construction and Architectural Management
Verified
Journal Article
Open access
PDF file
ELEelon Mikael Lappalainen
Eelon Mikael Lappalainen
Olli SeppänenOlli Seppänen
Olli Seppänen
APAntti Peltokorpi
Antti Peltokorpi
VSVishal Singh
Vishal Singh
Purpose: With the ongoing digitalization of the construction industry (CI), situational awareness (SA) is becoming increasingly important in construction management. The purpose of this article is to identify the requirements of SA system development in the CI and to provide recommendations for the future development of SA systems.Design/methodology/approach: In this exploratory multi-case research study, a literature review and five Finnish cases were used to gather the evidence on how system developers have planned SA systems and what motives and objectives were behind their development efforts. An analysis of the cases, along with a review of SA models and concepts from other sectors, was used to identify requirements and deficiencies of the SA systems developed by CI actors.Findings: This study reveals deficiencies in the recent SA systems. The systems seemed to be based on traditional project models, in which the role of the individual as the creator and interpreter of an SA system is still significant. Major requirements and future development of the systems are related to better SA levels of perception and projection and data quality.Research limitations/implications: This study contributes to an understudied area of SA in the construction context and provides new insights into how construction companies develop their SA systems. The main study limitations are its geographically limited case selection and the limited generalizability of the results.Practical implications: The research (1) shows what requirements and systemic weaknesses SA developers in the CI must consider in future development work and (2) shows developers the requirements to obtain holistic SA.Originality/value: The study provides insights into the content of newly developed SA models and integrates developers' requirements into the SA theory.

1 May 2019 in Buildings
Verified
Journal Article
Open access
PDF file
PUPetteri Uusitalo
Petteri Uusitalo
Olli SeppänenOlli Seppänen
Olli Seppänen
ELEelon Mikael Lappalainen
Eelon Mikael Lappalainen
APAntti Peltokorpi
Antti Peltokorpi
HOHylton Olivieri
Hylton Olivieri
Few construction companies apply the available lean tools and processes in an integrated manner when managing design. Additionally, lean design management tools and processes each have their own strengths and optimal phases in which they should be applied. Earlier approaches in lean design management have not explicitly included the level of detail of building information model (BIM) models in connection with planning methods. For example, the Last Planner System (LPS) uses collaborative social methods to obtain task dependencies and commitments from project stakeholders, but it does not provide any guidance regarding what those tasks should be in a BIM-based process. With regard to production, this guidance is provided by combining location-based methods, such as a location-based management system or takt planning, to LPS. In a similar manner, by combining information from various sources, this paper defines a location-based design management process using the concept of level of detail that can be integrated with LPS. The level of detail definition must be based on the requirements of the end-user in each stage of the construction project. The process was cocreated and validated in focus group meetings with design and construction companies and further evaluated and assessed by applying it in a case project.

8 August 2022 in Buildings
Verified
Journal Article
Open access
PDF file
ELEelon Mikael Lappalainen
Eelon Mikael Lappalainen
PUPetteri Uusitalo
Petteri Uusitalo
EPErgo Pikas
Ergo Pikas
Olli SeppänenOlli Seppänen
Olli Seppänen
APAntti Peltokorpi
Antti Peltokorpi
NMNikolai Menzhinskii
Nikolai Menzhinskii
It is generally acknowledged that good-quality design is a prerequisite for good quality and productive construction work. One proposed measure to improve the quality of construction has been contractors’ involvement in the design phase, and this phenomenon has been studied by several researchers. However, such approaches have not adequately addressed how this involvement affects the quality of the design. In this study, the aim was to study the effects of the early involvement of contactors on design quality based on evaluating the design quality factors. A case study was used to collect data and content analysis to analyze structural drawings and design meeting minutes of a large-scale infrastructure project. Particularly, the focus was on gathering information on the quality of the design and how it was addressed in the design coordination. We combined this quantitative data with qualitative open-ended thematic interviews, including respondents who led and coordinated the design on both the client and contractor sides. Our findings suggest that despite the vast amount of design changes, contractors’ involvement and development work in the detailed design phase improved design quality and constructability. Our findings also suggest that the contractor’s involvement during the schematic design phase had a design-enhancing effect in the detailed design phase. This study contributes to our understanding of contractors’ valuable role in design quality.

17 December 2025 in Engineering, Construction and Architectural Management
Verified
Journal Article
Open access
CGChristopher Görsch
Christopher Görsch
ATAlgan Tezel
Algan Tezel
ELEelon Mikael Lappalainen
Eelon Mikael Lappalainen
Olli SeppänenOlli Seppänen
Olli Seppänen
LKLauri Koskela
Lauri Koskela
Purpose: This paper aims to address the need for a comprehensive management framework that supports decentralised and autonomous decision-making to reduce waste and improve flow in construction. Design/methodology/approach: Following a design science research approach, an integrative literature review was conducted to build the framework, which was then comparatively assessed against existing visual-management and situation-awareness systems to identify functional gaps and potential applications. Findings: The resulting framework links the physical, informational and socio-psychological dimensions of construction to deliver continuously accessible, task-relevant information that supports real-time decision-making and coordination across trades. Research limitations/implications: Implementation of the DVM framework remains limited by economic, organisational and technological barriers. This calls for future research on scalable adoption, interoperability and digital skills development. Practical implications: The framework strengthens operational decision-making and cross-trade coordination by integrating automated data capture, analysis, and visual information delivery. In practice, it supports proactive constraint management, increases safety and resource efficiency and minimises waste arising from fragmented information flow. Social implications: The framework advances human-centric construction management by strengthening workers' autonomy and situational awareness while integrating digital systems that support, rather than replace, human judgement. It highlights management as a socio-technical process built on awareness, trust and informed decision-making. Originality/value: The study introduces a digital visual management framework that unites physical, digital and cognitive perspectives, extending lean construction theory and offering a practical foundation for developing and implementing next-generation, human-centric decision-support systems in construction projects.

3 November 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
ARAna Reinbold
Ana Reinbold
ELEelon Mikael Lappalainen
Eelon Mikael Lappalainen
Olli SeppänenOlli Seppänen
Olli Seppänen
APAntti Peltokorpi
Antti Peltokorpi
VSVishal Singh
Vishal Singh
In the construction industry, digitalisation has led to increasing efforts to improve construction management using digital visual management (VM) devices. Although the amount of research on digital VM (DVM) in the design phase and in the management of construction sites has also increased, its implementation during the production phase and by construction crews remains limited. The objective of this study is to explore the adoption of DVM in construction sites, assess construction workers’ experiences regarding digital and analogue VM devices, and understand the challenges that hinder the adoption of such devices. This study used a mixed method approach, combining qualitative and quantitative research. Data included visual site explorations, surveys of construction workers and crew managers, and unstructured interviews with site managers and development directors to assess the use of DVM devices in construction sites, the need for them and their current implementation. The findings showed that VM should be conveniently located near the job site instead of the office site, which is the current situation. Construction crews who experienced more production and schedule disruptions reported that VM supported their work, compared with crews that had fewer disruptions. VM devices on construction sites are analogue, and their usage continues to be in construction site management, which perpetuates information silos during construction projects. The findings of this study provide insights into the development and deployment of DVM devices on construction sites. Construction workers’ need for visual information close at hand is of interest to both scholars and practitioners in future research and development.

3 July 2024 in Buildings
Verified
Journal Article
Open access
PDF file
ELEelon Mikael Lappalainen
Eelon Mikael Lappalainen
PUPetri Uusitalo
Petri Uusitalo
Olli SeppänenOlli Seppänen
Olli Seppänen
APAntti Peltokorpi
Antti Peltokorpi
ARAna Reinbold
Ana Reinbold
Roope NyqvistRoope Nyqvist
Roope Nyqvist
Currently, digital situational awareness systems are popular in complex infrastructure construction projects. These systems monitor and assess environmental events, progress, resource availability, risks, and other project decision-making variables to support decision-making. However, little is known about how infrastructure construction (IC) professionals who utilize situational awareness systems perceive how they support or hinder situational management. The purpose of this exploratory research is to study, in depth, the relevance, challenges, and adoption of situational management in IC projects using digital systems. The data were collected via semistructured interviews with 21 IC managers and situational awareness management experts from 11 companies involved in railway projects. The main findings indicate that problem-solving improved with situational management in general, especially with digital situational awareness systems. Seizing the possibilities for transparency that accompany digital situational awareness systems helped in discussing emerging problems and making project choices. Expectations about the realism of such expectations were easier to align with historical event data. On the other hand, the informants reported difficulty in motivating contractors to collect situational data in digital form, possibly because of a lack of understanding about the purpose of data collection, the manual nature of data collection, the perceived excessiveness of data collection, or the manual transfer of collected data into digital form. For these reasons, the informants reported limited faith in these systems. A perceived drawback of situational management, whether supported by digital situational awareness systems or not, was its lack of applicability to the realities of a construction site. Systems were designed for project management needs but not tailored to the needs of construction projects. The interviewees’ statements indicate that maintaining situational awareness requires active interaction and constant checking of the provided information, even requiring pressure on the contractors providing the information. This study highlights the need for practical human approaches to effectively use digital situational awareness technologies and situational management in IC.