Fernanda Schmitd Villaschi

Prof. Fernanda Schmitd Villaschi

Minho University

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 August 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
JCJosé Pedro Carvalho
José Pedro Carvalho
Fernanda Schmitd VillaschiFernanda Schmitd Villaschi
Fernanda Schmitd Villaschi
Luís BragançaLuís Bragança
Luís Bragança
Worldwide authorities are increasingly concerned about construction’s efficiency and sustainability, leading to the development of high-performance buildings. However, such facts have shifted a significant percentage of the building life cycle environmental impacts from the operation to the product and construction phases. Thus, the need to evaluate and select more sustainable materials and construction solutions arises, to also minimize impacts from these stages. To evaluate those impacts, LCA and LCC analysis are usually applied to assess the building impacts and costs, through the different life cycle stages. Despite the usefulness of LCA and LCC methods during the project phase, they are usually evaluated in the project later stages. It is too complex and time-consuming to gather and process all the required data during the project early stages. With the recent deployment of BIM, the opportunity to automate and shift LCA and LCC analysis to project early stages stands out. Facing the research gap, this study aims to develop a BIM-based decision-making tool for designers to evaluate the environmental, economic, and functional performance of different building construction solutions. To do so, 18 different simulation scenarios have been created in Autodesk Revit with different combinations of external walls, roofs, and floors. Then, a framework was developed in Dynamo to automatically characterize the building elements life cycle environmental impacts and costs, as well as to automate the LCA and LCC analysis during the project early stages. The outcomes can significantly reduce the required time, errors and efforts when performing LCA and LCC analysis, providing designers with real time decision support data and making an important contribution to the use of BIM for sustainability purposes.

30 June 2022 in Applied System Innovation
Verified
Journal Article
Open access
PDF file
Fernanda Schmitd VillaschiFernanda Schmitd Villaschi
Fernanda Schmitd Villaschi
JCJosé Pedro Carvalho
José Pedro Carvalho
Luís BragançaLuís Bragança
Luís Bragança
Urban planning is a valuable tool for growth control and city development, both to maintain the local urban identity and provide life quality for inhabitants. To regulate it, local governments have defined standards for a proper city’s growth through municipal and detailed urban plans. Such instruments identify a set of rules which constructions and buildings must fulfil for a careful and smooth integration within the urban areas. New projects are required to comply with such rules, and designers must adapt and guarantee that their projects fulfil all the local urban requirements. However, the verification process of construction projects is still a manual procedure and often a time-consuming process, with high possibilities for inaccurate measures. Thus, this paper aims to streamline the verification procedure of construction projects’ code compliance to enhance project design efficiency and save designers time. To do so, the Building Information Modelling (BIM) method will be used through the Dynamo programming software. By creating a Dynamo routine to check the building code and urban plan compliance from Brazilian municipalities, specific BIM models will be automatically analysed to detect and evaluate if it is according to local urban legislation. Results have provided a real-time decision support tool, where designers can assess if their buildings are complying with local urban codes at any time of the design stage, making it easy to innovate and integrate innovative design options, as well as to precisely communicate their buildings’ code compliance. Such a method can also support municipality authorities to verify project compliance, reducing assessment and calculation errors, as well as the required time and bureaucracy for project appraisal.