Felipe Navarro

Mr. Felipe Navarro

AMTC, Universidad de Chile, Santiago, Región Metropolitana, Chile
orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 August 2022 in Journal of Cleaner Production
Verified
Journal Article
Closed access
FSFabián Soto
Fabián Soto
Felipe NavarroFelipe Navarro
Felipe Navarro
GDGonzalo Díaz
Gonzalo Díaz
Xavier EmeryXavier Emery
Xavier Emery
APAnnika Parviainen
Annika Parviainen
AEAlvaro Egaña
Alvaro Egaña

18 April 2022 in Journal of Geochemical Exploration
Verified
Journal Article
Closed access
EGErika González-Díaz
Erika González-Díaz
SGSebastián García
Sebastián García
FSFabián Soto
Fabián Soto
Felipe NavarroFelipe Navarro
Felipe Navarro
BTBrian Townley
Brian Townley
MCManuel A. Caraballo
Manuel A. Caraballo

22 October 2021 in Natural Resources Research
Verified
Journal Article
Closed access
PDF file
RFRenato Ferrer
Renato Ferrer
XEXavier Emery
Xavier Emery
Mohammad MalekiMohammad Maleki
Mohammad Maleki
Felipe NavarroFelipe Navarro
Felipe Navarro

14 April 2021 in Natural Resources Research
Verified
Journal Article
Closed access
PDF file
AEAlvaro Egaña
Alvaro Egaña
Felipe NavarroFelipe Navarro
Felipe Navarro
MMMohammad Maleki
Mohammad Maleki
FGFrancisca Grandón
Francisca Grandón
FCFrancisco Carter
Francisco Carter
FSFabián Soto
Fabián Soto

23 March 2023 in Scientific Data
Verified
Journal Article
Open access
PDF file
AEAlejandro Ehrenfeld
Alejandro Ehrenfeld
ÁEÁlvaro F. Egaña
Álvaro F. Egaña
Felipe Santibáñez-LealFelipe Santibáñez-Leal
Felipe Santibáñez-Leal
FGFelipe Garrido
Felipe Garrido
MOMarcia Ojeda
Marcia Ojeda
Felipe NavarroFelipe Navarro
Felipe Navarro
Supervised analysis using spectral data requires a well-informed characterisation of the response variables and abundant spectral data points. The presented hyperspectral dataset comes from five sets of geometallurgical samples, each characterised by different methods. To provide the spectral data, all mineral samples were scanned with SPECIM VNIR and SWIR hyperspectral cameras. For each subset the following data are provided 1) hyperspectral reflectance images in the VNIR spectral range (400–1000 nm wavelength); 2) hyperspectral reflectance images in the SWIR spectral range (900–2500 nm wavelength); 3) hyperspectral reflectance images in the VNIR-SWIR range (merged to SWIR spatial resolution); 4) RGB images constructed from hyperspectral data using a Bilateral Filter based sensor fusion method; 5) response variables representing mineral sample characterisation results, provided as training and validation data. This dataset is intended for use in general regression and classification research and experiments. All subsets were validated using machine learning models with satisfactory results.

23 April 2024 in Minerals
Verified
Journal Article
Open access
PDF file
Felipe NavarroFelipe Navarro
Felipe Navarro
Nelson Victor Morales VarelaNelson Victor Morales Varela
Nelson Victor Morales Varela
Carlos Contreras-BoltonCarlos Contreras-Bolton
Carlos Contreras-Bolton
CRCarlos Rodrigo Rey
Carlos Rodrigo Rey
VPVictor Parada
Victor Parada
Determining the design of pushbacks in an open-pit mine is a key part of optimizing the economic value of the mining project and the operational feasibility of the mine. This problem requires balancing pushbacks that have good geometric properties to ensure the smooth operation of the mining equipment and so that the scheduling of extraction maximizes the economic value by providing early access to the rich parts of the deposit. However, because of the challenging nature of the problem, practical approaches for finding the best pushbacks strongly depend on the expert criteria to ensure good operational properties. This paper introduces the Advanced Geometrically Constrained Production Scheduling Problem to account for operational space constraints, modeled as truncated cones of extraction. To find the best solution for this problem, we present a parallel genetic algorithm based on a genotype–phenotype model such that the genotype symbolizes the base block of a truncated cone, and the phenotype represents the cone itself. A central computer node evaluates these solutions, collaborating with various secondary nodes that evolve a population of feasible solutions. The PGA’s efficacy was validated using comprehensive test instances from established research. The PGA solution exhibited a consistent average copper grade across periods, with its incremental phases reflecting real-world mine geometry. Moreover, the benefits of the MeanShift clustering technique were evident, suggesting effective phase-based scheduling. The PGA’s approach ensures optimal resource utilization and offers insights into potential avenues for further model enhancements and fine-tuning.