Andi Abdul Halik Lateko

Mr. Andi Abdul Halik Lateko

National Cheng Kung University (NCKU)
+1
orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 June 2022 in Energies
Verified
Journal Article
Open access
PDF file
ALAndi Abdul Halik Lateko
Andi Abdul Halik Lateko
Hong-Tzer YangHong-Tzer Yang
Hong-Tzer Yang
CHChao-Ming Huang
Chao-Ming Huang
One of the most critical aspects of integrating renewable energy sources into the smart grid is photovoltaic (PV) power generation forecasting. This ensemble forecasting technique combines several forecasting models to increase the forecasting accuracy of the individual models. This study proposes a regression-based ensemble method for day-ahead PV power forecasting. The general framework consists of three steps: model training, creating the optimal set of weights, and testing the model. In step 1, a Random forest (RF) with different parameters is used for a single forecasting method. Five RF models (RF1, RF2, RF3, RF4, and RF5) and a support vector machine (SVM) for classification are established. The hyperparameters for the regression-based method involve learners (linear regression (LR) or support vector regression (SVR)), regularization (least absolute shrinkage and selection operator (LASSO) or Ridge), and a penalty coefficient for regularization (λ). Bayesian optimization is performed to find the optimal value of these three hyperparameters based on the minimum function. The optimal set of weights is obtained in step 2 and each set of weights contains five weight coefficients and a bias. In the final step, the weather forecasting data for the target day is used as input for the five RF models and the average daily weather forecasting data is also used as input for the SVM classification model. The SVM output selects the weather conditions, and the corresponding set of weight coefficients from step 2 is combined with the output from each RF model to obtain the final forecasting results. The stacking recurrent neural network (RNN) is used as a benchmark ensemble method for comparison. Historical PV power data for a PV site in Zhangbin Industrial Area, Taiwan, with a 2000 kWp capacity is used to test the methodology. The results for the single best RF model, the stacking RNN, and the proposed method are compared in terms of the mean relative error (MRE), the mean absolute error (MAE), and the coefficient of determination (R2) to verify the proposed method. The results for the MRE show that the proposed method outperforms the best RF method by 20% and the benchmark method by 2%.

4 August 2021 in Energies
Verified
Journal Article
Open access
PDF file
ALAndi Abdul Halik Lateko
Andi Abdul Halik Lateko
Hong-Tzer YangHong-Tzer Yang
Hong-Tzer Yang
CHChao-Ming Huang
Chao-Ming Huang
HAHappy Aprillia
Happy Aprillia
CHChe-Yuan Hsu
Che-Yuan Hsu
NPNguyen Hoang Phuong
Nguyen Hoang Phuong
Photovoltaic (PV) power forecasting urges in economic and secure operations of power systems. To avoid an inaccurate individual forecasting model, we propose an approach for a one-day to three-day ahead PV power hourly forecasting based on the stacking ensemble model with a recurrent neural network (RNN) as a meta-learner. The proposed approach is built by using real weather data and forecasted weather data in the training and testing stages, respectively. To accommodate uncertain weather, a daily clustering method based on statistical features, e.g., daily average, maximum, and standard deviation of PV power is applied in the data sets. Historical PV power output and weather data are used to train and test the model. The single learner considered in this research are artificial neural network, deep neural network, support vector regressions, long short-term memory, and convolutional neural network. Then, RNN is used to combine the forecasting results of each single learner. It is also important to observe the best combination of the single learners in this paper. Furthermore, to compare the performance of the proposed method, a random forest ensemble instead of RNN is used as a benchmark for comparison. Mean relative error (MRE) and mean absolute error (MAE) are used as criteria to validate the accuracy of different forecasting models. The MRE of the proposed RNN ensemble learner model is 4.29%, which has significant improvements by about 7–40%, 7–30%, and 8% compared to the single models, the combinations of fewer single learners, and the benchmark method, respectively. The results show that the proposed method is promising for use in real PV power forecasting systems.

1 November 2014
Verified
Conference Paper
Closed access
YAYusri Syam Akil
Yusri Syam Akil
SYSyafaruddin
Syafaruddin
TWTajuddin Waris
Tajuddin Waris
ALAndi Abdul Halik Lateko
Andi Abdul Halik Lateko
As meteorological conditions can be unique in different countries and may have influence on electricity demand, providing demand model to analyze characteristic of demand is useful as obtained information can be used to manage related power systems better. This paper proposes regression based demand model to identify typical characteristic of demand in Indonesia more detail. Three different demand areas (Racing-Area, Poltek-Area, and Paropo Area) in Makassar, Indonesia including their total demand (Total-Area) are analyzed by creating demand model. The demands are correlated with meteorological parameters (temperature functions, relative humidity, and wind speed) and holidays. Individual characteristics are firstly observed to obtain main drivers and their typical effect on each demand area. Furthermore, general characteristics are analyzed to find common characteristic of demand such as what variables influence electricity demand generally. Several options for model are calculated and assessed by statistical tests to get best model. Results indicate more information concerning characteristic of demands can be revealed by models which are well validated. Each demand area has individual characteristic as demand drivers and their effect are relatively different between areas. Other results concerning general characteristic confirm temperature functions, relative humidiy, and holidays are important driver for demand. The variables are quite good to explain electricity demand generally as adjusted coefficient of determination of model (R2') is 76.42%.

19 February 2024 in PRZEGLĄD ELEKTROTECHNICZNY
Verified
Journal Article
Closed access
ALAndi Abdul Halik Lateko
Andi Abdul Halik Lateko
YAYusri Syam Akil
Yusri Syam Akil
This paper employs a Vector Error Correction Model (VECM) analysis to investigate the influence of economic growth (GDP) and investment (FDI) on electricity consumption (EPC) in Indonesia. By examining annual data from 1971-2019, the study explores the short-term dynamics and long-run equilibrium relationships among the variables. A negative relationship is observed between EPC and GDP in the long run, while a negative relationship exists between EPC, GDP, and FDI in the short term. The short-run analysis reveals that GDP significantly influences EPC at the three-year horizon, and FDI has a significant negative effect on EPC at the one- and two-year horizons. Another result concerning the causality test indicate a unidirectional relationship between EPC and GDP, while EPC and FDI exhibit bi-directional causality. The findings underscore the influential role of GDP and FDI in driving changes in EPC. Understanding these relationships is crucial for policymakers and energy planners in effectively managing electricity demand, infrastructure investments, and sustainable economic growth. This research contributes to the existing literature by providing insights specific to Indonesia, guiding decision-making processes regarding energy infrastructure development, energy efficiency measures, and sustainable economic development.

31 January 2019 in CYCLOTRON
Verified
Journal Article
Open access
PDF file
ALAndi Abdul Halik Lateko
Andi Abdul Halik Lateko
DADan Adriani
Dan Adriani
Abstrak— Dalam penelitian ini kita mengamati sistem dalam kondisi transien dan membuat perkiraan batas kestabilan. Hal ini diperlukan untuk mendesain sistem sedemikian hingga mampu menahan gangguan besar. Studi ini dilakukan dengan menggunakan simulasi gangguan hubung singkat 3 phasa pada saluran transmisi bus Tello 150 kV. Studi ini menghasilkan perkiraan batas kestabilan berupa waktu pemutusan gangguan dalam saluran yang nilainya didapat dari batas waktu kehilangan sinkronisasi (loss of synchronism). Batas waktu tersebut menjadi acuan dalam setting peralatan proteksi di saluran transmisi untuk menghindari dampak negatif yang lebih besar akibat adanya gangguan. Simulasi dilakukan dengan menggunakan software Matlab, hasil simulasi memperihatkan bahwa lama gangguan dan letak gangguan hubung singkat 3 phasa, mempengaruhi kestabilan transien. Pada simulasi menunjukkan waktu pemutusan kritis tercepat diperoleh di saluran Tello – Tello Lama sebesar 0.125 detik.Kata kunci: Kestabilan Transien, Hubung Singkat , Waktu Pemutusan Kritis

22 April 2025 in Arus Jurnal Sains dan Teknologi
Verified
Journal Article
Open access
PDF file
AMAswar Mukhtar Mukhtar
Aswar Mukhtar Mukhtar
ALAndi Abdul Halik Lateko
Andi Abdul Halik Lateko
ZZZahir Zainuddin
Zahir Zainuddin
Penelitian ini menganalisis kapasitas baterai yang digunakan dalam sistem starting mesin General Electric di unit PLTG PT. PLN Indonesia Power Unit Bisnis Pembangkitan Tello. Kapasitas baterai memiliki peran penting dalam menjamin keandalan sistem starting, yang mempengaruhi efisiensi dan stabilitas operasional. Penelitian ini menggunakan pendekatan kuantitatif dengan melakukan pengukuran kinerja baterai, evaluasi stabilitas tegangan, serta analisis konsumsi energi. Hasil penelitian menunjukkan bahwa baterai VRLA YUASA dengan kapasitas 550Ah memiliki tegangan stabil pada rentang 128,6V - 128,8V, yang menunjukkan kinerja optimal. Selain itu, konsumsi energi untuk proses starting sistem sangat rendah, menegaskan efisiensi tinggi dalam penggunaan baterai. Temuan ini berkontribusi dalam meningkatkan strategi pemeliharaan dan menjamin keandalan sistem pembangkitan listrik.