Florin Stinga

Mr. Florin Stinga

University POLITEHNICA of Bucharest
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 August 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
Florin StingaFlorin Stinga
Florin Stinga
Irina SeverinIrina Severin
Irina Severin
AMAlina Ioana Mitrache
Alina Ioana Mitrache
ELElena Lascu
Elena Lascu
In this study, the production efficiency of a company’s manufacturing flow decreased, and therefore specific improvement actions on the tire manufacturing process were implemented. Additionally, the process improvement plan started with a deeper understanding of the activities, by using the SIPOC method (suppliers, inputs, process, outputs, customers). In order to identify the root-causes and the opportunities for improvement, quality instruments, such as the Ishikawa and Pareto quality tools, were used. The tire manufacturing process was reorganized using the 5S method, then the process was standardized and maintained through specific working procedures drafted on the standard operating procedure format. A particular device was designed for unlocking spring vents. Finally, the implementation of the redesign project shows added value as the entire manufacturing process improved by identifying weaknesses and correcting them. In addition to this, a different objective of the same company used in this case study is linked to adapting to market regulation requirements (the Economic Commission of Europe), with the aim to remain competitive. Therefore, well-defined processes and a strategy based on continuous improvement are needed. The methodology may be transferred to other industries.