Purpose: With its impact already felt, the construction industry worldwide is gradually reviving following the lifting up of lockdowns amid the COVID-19 pandemic. Though some articles have been written regarding its impact on the construction industry in other countries, much is yet to be known concerning the current impact in Ghana. This study aims to examine the impact of COVID-19 on Ghana’s construction industry and assess how construction companies are contributing to the fight against COVID-19. Design/methodology/approach: Semi-structured interviews with nine key professionals working with D1K1 firms currently working on projects of almost similar sizes within the confines of a reputable tertiary institution in Ghana were conducted over a span of three weeks. Thematic analysis was conducted with Nvivo 12 Pro Application software. Findings: From the findings, the major impact includes: a decrease in work rate, delays in payments and an increase in the cost of materials arising from border closure. On the measures by construction companies in contributing to the fight against the pandemic, findings indicated: educating the workforce on the virus, the provision of PPEs, regular and effective checks on entry and exit from the site. Practical implications: The study is significant, as knowledge of the impact posed by the pandemic will provide some idea of the measures to put in place to ensure the gradual to full recovery of the industry. Originality/value: The originality of this study lies in the fact that it is a pioneering study on the impact of COVID-19 on the Ghanaian construction industry.
12 September 2022 in Built Environment Project and Asset Management
Purpose: This study examines the level of awareness and practice of the principles of circular economy (CE) among built environment (BE) professionals in Ghana.Design/methodology/approach: A structured questionnaire survey was used to solicit the views of 162 BE professionals working in construction, consulting and developer firms on the issue under investigation. Data were analysed through descriptive and inferential analysis.Findings: The findings revealed that the BE professionals possessed moderate awareness of the six CE principles (i.e. repair, recycle, reuse, renewable energy usage, reduce and redesign) examined. The findings further revealed that only two out of the six principles (i.e. repair and reuse) received some moderate level of practice among the professionals.Practical implications: Practically, the findings would be relevant to government, policymakers, researchers and other construction professionals. For the government and policymakers, these findings would inform them on the laws and policies to enact to increase awareness and practice of CE principles. For researchers, these findings will assist in exploring gaps for further studies. For the construction professionals, the findings would inform them of the need to step up measures to practice the various principles of CE in their firms adequately.Originality/value: This study provides insights into an under-investigated topic in the construction industry worldwide. It offers new and additional insights into the current state-of-the-art practice of CE principles among BE professionals.
Technology has undoubtedly played a vital role in improving construction procedures and processes for many years. However, its application for health and safety monitoring and management has not been fully exploited in the Ghanaian construction industry. This study aims at exploring the current technologies essential for health and safety in the Ghanaian construction industry. Three specific objectives are set: (1) to identify the current health and safety technologies important in the Ghanaian construction industry; (2) to examine the level of utilization of the current health and safety technologies in the Ghanaian construction industry; (3) to identify the barriers to the adoption of the current health and safety technologies in the construction industry. A structured questionnaire is used to solicit the views of 123 construction professionals who double as health and safety officers in large construction firms in Ghana. The questions are developed through a critical comparative review of the related literature. The data are analyzed via descriptive and inferential statistics. The findings reveal that key among the current technologies important for health and safety in the Ghanaian construction industry are wearable safety devices, geographic information systems, sensing technologies, virtual reality, and BIM. The findings further reveal a moderate level of usage of the key technologies among construction professionals in Ghana. Key among the barriers to the adoption of these technologies for health and safety in the Ghanaian construction industry are the factors ‘excess costs related to acquiring new technologies’, ‘weak innovation culture’, ‘lack of continuous training of the workforce in adapting to the technologies’, ‘resistance to change with aging workforce’, and ‘little or no governmental support and regulations for the use of the technologies’. The findings from this study provide insight into the ever-increasing state-of-the-art technologies used in the construction industry.
27 July 2020 in Journal of Engineering, Design and Technology
Purpose: This study aims to examine the role of project managers (PMs) in construction health and safety in Ghana. Design/methodology/approach: Purposive sampling technique was used to select licenced PMs in Ghana where data was collected with the use of structured questionnaires. Mean score analysis, Kendall’s Coefficient of Concordance, Relative Importance Index and Cronbach’s alpha were used to analyze the data. Findings: The study discovered that most PMs on construction firms in Ghana allocate between 1% and 5% of the total project cost to health and safety. According to the study, client satisfaction is the most important parameter to consider in construction project management. Structural frame, method of fixing and edge of materials were the key design activities that caused PMs to make frequent reference to health and safety. It was revealed that PMs refer to health and safety when confronted by all the procurement-related situations. Research limitations/implications: The research is limited to the built environment professionals in Ghana. The findings cannot be generalized and extended to other developing countries; however, it could serve as a lesson to them. Practical implications: The findings of the study are anticipated to provide information about the critical role of PMs in promoting health and safety throughout the project life cycle. Originality/value: The novelty of the study sought to delve into the complex nature of construction to identify the role of PMs in relation to the health and safety practices in the construction industry.
31 October 2023 in Built Environment Project and Asset Management
Purpose: Circular economy (CE) is guided by principles, the key being the R-framework. All R-frameworks have a hierarchy. Although several studies have prioritized these principles, there is still an urgent call for country-specific prioritization. This study prioritized circular economy (CE) principles among Ghana's built environment (BE) professionals.Design/methodology/approach: An explanatory sequential mixed methods approach was adopted. Six principles of CE were identified through a review of related literature and incorporated into a questionnaire. In total, 162 questionnaire responses were received. The quantitative data were analyzed through descriptive and inferential analyses. The data were further validated via semi-structured interviews with eight interviewees of different professional backgrounds in the BE.Findings: The findings revealed that BE professionals in Ghana highly perceived CE principles as important. The findings further revealed the order of prioritization of the CE principles as follows: (1) recycle, (2) reuse, (3) repair/remanufacture, (4) renewable energy usage, (5) redesign and (6) reduce. To further elaborate on these prioritized principles via the qualitative phase, the interviewees agreed to and confirmed the importance of the identified principles through their verbatim comments.Originality/value: Although there is a growing interest in research regarding CE in the Ghanaian construction industry, its principles have yet to be prioritized and ranked by professionals in the Ghanaian construction industry. This study unearths why, in terms of prioritization of the CE principles, the construction industry in Ghana does not follow the well-known hierarchy (i.e. reduce, reuse and recycle) in the order of high to low level of circularity.
15 February 2021 in Journal of Engineering, Design and Technology
Purpose: The purpose of this paper is to examine the views of construction practitioners on the prevalence of ethical misconduct within the invitation to tender and tender evaluation and award stages of construction contracts in Ghana. Design/methodology/approach: Following a critical comparative review of literature resulting in the identification of 18 potential misconducts within the invitation to tender and 11 potential misconducts within the tender evaluation and award stages of construction contracts, a questionnaire survey was conducted among 65 construction professionals. Data obtained from the survey were analysed using both descriptive (i.e. frequencies, mean scores and standard deviations) and inferential statistics (paired t-test), followed by gap analysis. Findings: The findings revealed that corrupt, fraudulent, collusive or coercive practices, client divulging more information to the preferred bidder and inflating tender prices by tenderers in return for kickbacks are key unethical practices prevalent at the invitation to tender stage. Following these key unethical practices, the findings further suggested through gap analysis that submission of bids on non-working days and inadequate time for preparation and submission of tenders were the top two unethical practices that needed serious interventions at this stage. At the tender evaluation and award stage, the findings revealed that interference by influential people in political positions, fake tendering and bid shopping are prevalent. Again, from the gap analysis, interference by influential people in political positions and poor definition of selection criteria were identified to be the two key unethical practices that need urgent intervention at this stage of construction contracts. Practical implications: This study holds a significant practical implication in the sense that key unethical practices at the invitation to tender and tender evaluation and award stages of construction contracts have been identified, and this provides a suitable basis for stakeholders that spearhead such activities to offer suitable interventions to control such practices. Originality/value: This study contributes to the body of knowledge as it uncovers ethical misconducts within two important phases of construction contracts in a developing country setting. As there is a continuous effort by the international community towards finding lasting solutions to such misconducts, the findings from this study can be used as a starting point for appropriate policies to be put in place in Ghana to control such misconducts.