Among the levers carried in the era of Industry 4.0, there is that of using Artificial Intelligence models to serve the energy interests of industrial companies. The aim of this paper is to estimate the active electrical power generated by industrial units that self-produce electricity. To do this, we conduct a case study of the historical data of the variables influencing this parameter to support the construction of three analytical models three analytical models based on Deep Learning algorithms, which are Long Short-Term Memory (LSTM), Convolutional Neural Network (CNN), as well as the hybrid CNN algorithm coupled with LSTM (CNN-LSTM). Subsequently, and thanks to the evaluation of the created models through three mathematical metrics which are Root Mean Square Error (RMSE), Mean Square Error (MSE), and the variance score (R-squared), we were able to make a comparative study between these models. According to the results of this comparison, we attested that the hybrid model is the one that gives the best prediction results, with the following findings: the variance score was about 98.29%, the value of RMSE was exactly 0.1199 MW, and for MSE the error was equal to 0.0143 MW. The obtained results confirm the reliability of the hybrid model, which can help industrial managers save energy by acting upstream of the process parameters influencing the target variable and avoiding substantial energy bills.
This paper highlights the eco-efficiency of a sustainable digital solution to support decision-making in resolving the problem of sudden production drops and associated energy waste in industrial power plants, especially those operating with a steam turbomachine. The solution involves a multi-interface digital dashboard that generates insightful visual reports and gives proactive alerting to the decision-makers about potential underperformances to ensure resource optimization. For the studied use case, it involves the development of three interfaces of the dashboard, so as to perform the sustainable monitoring of a thermoelectric power plant based on the Rankine–Hirn cycle as follows: the first interface is about real-time monitoring of thirty-two key physical parameters equipped with a notification system. The second interface displays the historical trends of all the plant variables, in order to help in detecting incipient abnormal deviations before they impact environmental efficiency. Lastly, the third platform covers a predictive model using the XGBoost algorithmic method to forecast the future behavior of the electrical power as the target variable of the power plant. The XGBoost method was selected after a comparative assessment which also included the algorithms of Random Forest Regressor (RFR) and Gated Recurrent Unit (GRU). As a final step, this solution was later tested in a simulation environment built under the “Node-Red” platform, through an industrial decision scenario. The concrete findings validate the framework’s sustainability metrics, demonstrating the ability of the solution to help in preserving, for each production cycle of two years, up to 7.6 GWh of electrical energy that would otherwise be wasted, which translates into a potential cost-saving exceeding 633,247.9 USD, as well as an ecological impact by preventing the emission of 4628 tons of CO2.