Mahesh Babu Purushothaman

Dr. Mahesh Babu Purushothaman

Built Environment Engineering, Auckland University of Technology, Auckland, New Zealand
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 July 2024 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
Mahesh Babu PurushothamanMahesh Babu Purushothaman
Mahesh Babu Purushothaman
LPLeo Neil Resurreccion San Pedro
Leo Neil Resurreccion San Pedro
AHAli Ghaffarian Hoseini
Ali Ghaffarian Hoseini
Purpose: This review paper aims to highlight the causes of delays (COD) and their interactions in construction projects, potentially aiding in timely completion and waste reduction through early anticipation. Design/methodology/approach: Forty-seven global literature were examined in detail to identify CODS and its interactions using the systematic literature review (SLR) method that utilised the PRISMA guidelines to ensure the studies reviewed were adequate to safeguard the robustness and comprehensiveness. Three-way analysis, such as Pareto, degree of centrality and loops, was undertaken to identify the critical Level 1,2 and 3 CODS that affect the Construction projects. Findings: The research findings demonstrate that 65 CODs in eight categories affect construction projects. The CODs act in coherence rather than silos; the CLD displays complex interconnections of 44 factors obtained through the pairwise comparison of the 47 identified literature of the SLR. Through its systematic analysis of interaction loops, this research identified Ten level 1 critical CODs, two second-level critical CODs and 4 Third-level critical CODs. “Contractors' excessive workload/beyond potential/inadequate experience” emerged as the top COD that affects scheduling and project delay. Research limitations/implications: The study limitations include using only English articles and a restricted number of databases. However, the chosen databases were reputable and underwent thorough peer review processes. This study may have limitations due to the SLR, which means that factors affecting COD and interactions may vary by country, and future research is suggested for validation. Practical implications: This study identified interactions of construction delays that potentially support scheduling risk management during the early stage of the project and reduce waste to improve sustainability. The theoretical implications of SLR-based research include helping develop a framework that would potentially have all COD in the current scenario and aid future academic and industrial research factor-wise and country-wise in aiding sustainability. This will support and provide construction professionals and academia with knowledge of the COD related to factors and their interactions to be considered in the early assessment and management of future projects and improve sustainability. Originality/value: Most literature studies the factors or causes of construction delays that affect construction projects. The CODs primarily do not operate in silos but combine with other causes to enhance their influence on delays. Hence, it is of utmost importance to study the interactions of COD to enhance the knowledge in the construction field that would aid in schedule repair and, in turn, on-time project delivery. The study is the first related to COD and their interactions in construction projects in the digital era.

25 February 2025 in Smart and Sustainable Built Environment
Verified
Journal Article
Open access
PDF file
Mahesh Babu PurushothamanMahesh Babu Purushothaman
Mahesh Babu Purushothaman
FRFunmilayo Ebun Rotimi
Funmilayo Ebun Rotimi
Samadhi Nayanathara SamarasekaraSamadhi Nayanathara Samarasekara
Samadhi Nayanathara Samarasekara
AHAli Ghaffarian Hoseini
Ali Ghaffarian Hoseini
Purpose: This paper aims to highlight the factors affecting health and safety (H&S) and the SMART Technologies (ST) used to mitigate them in the construction industry through a range of selected papers to encourage readers and potential audiences to consider the need for intelligent technologies to minimize the risks of injuries, illnesses and severe harm in the construction industry.Design/methodology/approach: This paper adopts a double systematic literature review (SLR) to analyse studies investigating the factors affecting H&S and the ST in the construction industry using databases such as Google Scholar, Scopus, Science Direct and Emerald Insight publication.Findings: The SLR identified “fatal or focus five factors” that include objects Fall from heights (FFH) and trapped between objects; Falls, Trips and slips (FTS); Machinery/Equipment Malfunction and Moving Equipment; Pollutants: Chemicals, Airborne Dust, Asbestos; and Electrocution. The ST includes Safety Boots/SMART Glasses/SMART Helmet/SMART Vests/SMART PPE/SMART Watch, Mobile Apps, Building Information Modelling (BIM), Virtual Reality/Augmented Reality (VR/AR), Drones/Unmanned Aerial Vehicles and Wearable Technology/Mobile Sensors help mitigate the risk posed by “Fatal five”. However, other factors within the scope of ST, such as Weather Conditions, Vibrations, Violence, Disease and illness, Fire and Explosion and Over Exertion, are yet to be adopted in the field.Research limitations/implications: SLR methodology limitations of not obtaining the most updated field knowledge are critical and are offset by choosing 72% of H&S and 92% of SM review literature post-2017. Limitations to capturing articles because of the restriction of database access: only English language search and journals that are not a part of the databases selected are acknowledged. However, key database search that recognizes rigorous peer-reviewed articles offset these limitations. The researcher’s Bias is acknowledged.Practical implications: This paper unravels the construction H&S factors and their interlinks with ST, which would aid industry understanding and focus on mitigating associated risks. The paper highlights the Fatal five and trivial 15, which would help better understand the causes of the H&S risks. Further, the paper discusses ST’s connectivity, which would aid the organization’s overall H&S management. The practical and theoretical implications include a better understanding of all factors that affect H&S and ST available to help mitigate concerns. The operating managers could use the ST to reduce H&S risks at every construction process stage. This paper on H&S and ST and relationships can theorize that the construction industry is more likely to identify clear root causes of H&S and ST usage than previously. The theoretical implications include enhanced understanding for academics on H&S factors, ST and gaps in ST concerning H&S, which can be expanded to provide new insights into existing knowledge.Originality/value: This paper highlights all factors affecting H&S and ST that help mitigate associated risks and identifies the “Fatal five” factors. The paper is the first to highlight the factors affecting H&S combined with ST in use and their interactions. The paper also identified factors within the ST scope that are yet to be explored.

9 March 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Samadhi Nayanathara SamarasekaraSamadhi Nayanathara Samarasekara
Samadhi Nayanathara Samarasekara
Mahesh Babu PurushothamanMahesh Babu Purushothaman
Mahesh Babu Purushothaman
Funmilayo Ebun RotimiFunmilayo Ebun Rotimi
Funmilayo Ebun Rotimi
The global GDP has witnessed a significant upswing, majorly due to the growth of the construction industry. Embracing the whole-life costing (WLC) approach, the construction sector strategically manages expenses across a construction project’s life cycle. However, despite its widespread adoption, accurate cost forecasting remains a major challenge. The intricate interplay of various influencing factors has not been fully explored, leading to inaccurate cost estimations. A comprehensive understanding of specific factors and their interrelationships is crucial to address this issue. Therefore, it is imperative to conduct further research to identify and explore the subtle nuances of these factors that impact whole-life cost estimation. Our study fills this gap, analysing 51 factors from 84 papers across prominent repositories. We assess interrelationships using a systematic literature review and pairwise comparison as in the analytical hierarchy process. The International Construction Measurement Standards (ICMS) framework structures these relationships and is represented in the causal loop diagrams (CLDs). The pioneering CLDs are a notable contribution, illustrating interrelationships and polarities among the 51 WLC factors. Six reinforcing loops and one balancing loop provide valuable insights into their dynamic nature. Importantly, lower-level factors do not always directly connect with upper-level factors. Instead, they interact within the same level before linking to top-level factors. These findings are significant for professionals, such as cost estimators, quantity surveyors and scholars, offering a comprehensive understanding of the WLC system.

5 April 2022 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
Mahesh Babu PurushothamanMahesh Babu Purushothaman
Mahesh Babu Purushothaman
SKSumit Kumar
Sumit Kumar
Purpose: The purpose of this paper is to provide insights into the environment, resources and surroundings factors to develop a system dynamic model of dynamic project scheduling that aids on-time project delivery by reducing the project delay for the road construction industry in New Zealand (NZ).Design/methodology/approach: This study adopted narrative inquiry methodology that involved semi-structured interviews (SSI)/expert opinion and systematic literature review (SLR) data to determine the environment, resources and surroundings factors to develop a system dynamic model of dynamic project scheduling that aids on-time project delivery by reducing the project delay for the road construction industry in NZ. The data were analysed by using descriptive analysis, Likert scale and thematic analysis techniques to understand the relationship of these factors to propose a system dynamic model.Findings: This study concludes that weather, pandemic, material, geotechnical and disaster factors highly influence while other factors such as equipment shortage, breakdown, design error, labour and event had mixed impact on the dynamic scheduling (DS) that aids on-time project delivery. The proposed system dynamic model can enhance the understanding of factors affecting DS.Research limitations/implications: SLR is limited to English literature. The limitations of an SSI and a small sample size are acknowledged.Practical implications: The proposed model can reduce the uncertainty and scheduling errors during the planning phase and aid in the lesser scheduling modification during the execution phase. In practice, this study will be helpful for road contractors to understand environment, surroundings and resource in-control and out-of-control factors, overcome road construction delays, reduce cost, aid in stakeholder management and sustainable development.Social implications: The inclusion of environment, resource and surroundings factors in force majeure clauses will bring an understanding between contracting parties and in turn reduce disputes and delays and help social causes such as on-time infrastructure delivery.Originality/value: For the first time in a road construction, dynamic project scheduling model that collectively included and linked environment, resource, and surroundings factors to determine the in-control and out-of-control factors for an organisation is proposed. The novelty in the paper is provided by the inclusion of the events, disasters, and pandemics influence on DS in the NZ road construction industry for the first time.

22 August 2023 in Smart and Sustainable Built Environment
Verified
Journal Article
Open access
PDF file
Mahesh Babu PurushothamanMahesh Babu Purushothaman
Mahesh Babu Purushothaman
KGKasun Moolika Gedara
Kasun Moolika Gedara
Purpose: This pragmatic research paper aims to unravel the smart vision-based method (SVBM), an AI program to correlate the computer vision (recorded and live videos using mobile and embedded cameras) that aids in manual lifting human pose deduction, analysis and training in the construction sector. Design/methodology/approach: Using a pragmatic approach combined with the literature review, this study discusses the SVBM. The research method includes a literature review followed by a pragmatic approach and lab validation of the acquired data. Adopting the practical approach, the authors of this article developed an SVBM, an AI program to correlate computer vision (recorded and live videos using mobile and embedded cameras). Findings: Results show that SVBM observes the relevant events without additional attachments to the human body and compares them with the standard axis to identify abnormal postures using mobile and other cameras. Angles of critical nodal points are projected through human pose detection and calculating body part movement angles using a novel software program and mobile application. The SVBM demonstrates its ability to data capture and analysis in real-time and offline using videos recorded earlier and is validated for program coding and results repeatability. Research limitations/implications: Literature review methodology limitations include not keeping in phase with the most updated field knowledge. This limitation is offset by choosing the range for literature review within the last two decades. This literature review may not have captured all published articles because the restriction of database access and search was based only on English. Also, the authors may have omitted fruitful articles hiding in a less popular journal. These limitations are acknowledged. The critical limitation is that the trust, privacy and psychological issues are not addressed in SVBM, which is recognised. However, the benefits of SVBM naturally offset this limitation to being adopted practically. Practical implications: The theoretical and practical implications include customised and individualistic prediction and preventing most posture-related hazardous behaviours before a critical injury happens. The theoretical implications include mimicking the human pose and lab-based analysis without attaching sensors that naturally alter the working poses. SVBM would help researchers develop more accurate data and theoretical models close to actuals. Social implications: By using SVBM, the possibility of early deduction and prevention of musculoskeletal disorders is high; the social implications include the benefits of being a healthier society and health concerned construction sector. Originality/value: Human pose detection, especially joint angle calculation in a work environment, is crucial to early deduction of muscoloskeletal disorders. Conventional digital technology-based methods to detect pose flaws focus on location information from wearables and laboratory-controlled motion sensors. For the first time, this paper presents novel computer vision (recorded and live videos using mobile and embedded cameras) and digital image-related deep learning methods without attachment to the human body for manual handling pose deduction and analysis of angles, neckline and torso line in an actual construction work environment.

18 July 2023 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
Mahesh Babu PurushothamanMahesh Babu Purushothaman
Mahesh Babu Purushothaman
JSJeff Seadon
Jeff Seadon
Purpose: This review paper, using a systematic literature review (SLR) approach, aims to unravel the various system-wide waste in the construction industry and highlight the connectivity to construction phases, namely men, materials, machines, methods and measurement (5M) and impacting factors.Design/methodology/approach: This study used an SLR approach and examined articles published since the 2000s to explore the connectivity of system-wide waste to construction phases, 5M and impacting factors. The results are given in table forms and a causal loop diagram.Findings: Results show that the construction and demolition (CD) waste research carried out from various perspectives is standalone. The review identified ten types of system-wide waste with strong interlinks in the construction industry. The finding highlights connectivity between wastes other than material, labour and time and the wastes' impacting factors. Further, the review results highlighted the solid connectivity for construction phases, 5M, and impacting factors such as productivity (P), delay (D), accidents (A), resource utilisation (R) and cost(C).Research limitations/implications: SLR methodology limitations include not keeping in phase with the most updated field knowledge. This limitation is offset by choosing the range for literature review within the last two decades. This literature review may not have captured all published articles because the restriction of database access and search was based only on English. Also, fruitful articles hiding in less popular journals may not be included in the well-known database that was searched. Researcher bias of the authors and other researchers that authored the articles referred to is a limitation. These limitations are acknowledged.Practical implications: This article unravels the construction system-wide waste and the waste's interlinks, which would aid industry understanding and focus on eliminating the waste. The article highlights the connectivity of system-wide wastes to 5M, which would help better understand the causes of the waste. Further, the paper discusses the connectivity of system-wide waste, 5M and P, D, A, R and C that would aid the organisation's overall performance. The practical and theoretical implications include a better understanding of waste types to help capture better data for waste reduction and productivity improvement. The operating managers could use the tracking of wastes to compare estimated and actual resources at every process stage. This article on system-wide waste, 5M and P, D, A, R and C, relationships and their effects can theorize that the construction industry is more likely to identify clear root causes of waste now than previously. The theoretical implications include enhanced understanding for academics on connectivity between waste, 5M and P, D, A, R and C that the academics can use and expand to provide new insights to existing knowledge.Originality/value: For the first time, this article categorised and highlighted the ten types of waste in construction industries and the industries' connectivity to construction phases, 5M and impacting factors.