Marcin Jaskólski

Dr. Marcin Jaskólski

Gdańsk University of Technology, Gdańsk, Pomorskie, Poland
orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications


17 December 2021 in Sensors
Verified
Journal Article
Open access
PDF file
KJKrzysztof Jaskólski
Krzysztof Jaskólski
ŁMŁukasz Marchel
Łukasz Marchel
AFAndrzej Felski
Andrzej Felski
Marcin JaskólskiMarcin Jaskólski
Marcin Jaskólski
Mariusz SpechtMariusz Specht
Mariusz Specht
To enhance the safety of marine navigation, one needs to consider the involvement of the automatic identification system (AIS), an existing system designed for ship-to-ship and ship-to-shore communication. Previous research on the quality of AIS parameters revealed problems that the system experiences with sensor data exchange. In coastal areas, littoral AIS does not meet the expectations of operational continuity and system availability, and there are areas not covered by the system. Therefore, in this study, process models were designed to simulate the tracking of vessel trajectories, enabling system failure detection based on integrity monitoring. Three methods for system integrity monitoring, through hypotheses testing with regard to differences between model output and actual simulated vessel positions, were implemented, i.e., a Global Positioning System (GPS) ship position model, Dead Reckoning and RADAR Extended Kalman Filter (EKF)—Simultaneous localization and mapping (SLAM) based on distance and bearing to navigational aid. The designed process models were validated on simulated AIS dynamic data, i.e., in a simulated experiment in the area of Gdańsk Bay. The integrity of AIS information was determined using stochastic methods based on Markov chains. The research outcomes confirmed the usefulness of the proposed methods. The results of the research prove the high level (~99%) of integrity of the dynamic information of the AIS system for Dead Reckoning and the GPS process model, while the level of accuracy and integrity of the position varied depending on the distance to the navigation aid for the RADAR EKF-SLAM process model.

17 March 2020 in Energies
Verified
Journal Article
Open access
PDF file
Robert MalkowskiRobert Malkowski
Robert Malkowski
Marcin JaskólskiMarcin Jaskólski
Marcin Jaskólski
WPWojciech Pawlicki
Wojciech Pawlicki
This paper presents research on a hybrid photovoltaic-battery energy storage system, declaring its hourly production levels as a member of a balancing group submitting common scheduling unit to the day-ahead market. It also discusses the variability of photovoltaic system generation and energy storage response. The major research questions were whether the operation of a hybrid photovoltaic-battery energy storage system is viable from the technical and economic viewpoint and how to size battery energy storage for that purpose. The DIgSILENT PowerFactory environment was used to develop the simulation model of postulated hybrid system. Then, tests were conducted on real devices installed in the LINTE^2 laboratory at Gdańsk University of Technology, Poland. Firstly, power generation in the photovoltaic system was modeled using hardware in the loop technique and tested in cooperation with emulated photovoltaic and real battery energy storage system (lithium-ion battery, 25 kWh). Secondly, a real photovoltaic power plant (33 kW) and real battery energy storage were applied. The results obtained from laboratory experiments showed that market operation of hybrid photovoltaic-battery energy storage system is feasible. However, developing a control strategy constitutes a great challenge, as the operator is forced to intervene more frequently than the simulation models indicate in order to keep the parameters of battery storage within accepted ranges, especially in view of a sudden weather breakdown. Levelized cost of electricity from photovoltaic-battery energy storage system varied from 314 to 455 $/MWh, which has proven to be from two to three times higher than the current annual average day-ahead market price in Poland.

19 December 2022 in Energies
Verified
Journal Article
Open access
PDF file
Alicja LenarczykAlicja Lenarczyk
Alicja Lenarczyk
Marcin JaskólskiMarcin Jaskólski
Marcin Jaskólski
PBPaweł Józefat Bućko
Paweł Józefat Bućko
This paper presents the application of multi-criteria decision-making (MCDM) for evaluating what technologies using renewable energy sources (RES) for electricity production have the chance to develop in Poland under the current socio-economic conditions. First, the Analytical Hierarchy Process (AHP) method was used to determine the weights of the optimization criteria. Five main criteria and 30 sub-criteria were identified. Next, the authors modified numerical taxonomy (NT) to rank eight RES technologies (such as onshore and offshore wind farms, photovoltaics, or biogas plants). The results show that offshore wind farms are the RES technology with the greatest development opportunities in Poland. The following three technologies: distributed photovoltaic energy, biogas plants, and biomass power plants, respectively, received a similar rating in the ranking. Hydropower and geothermal were the lowest-ranked technologies. The ranking, which is the result of multi-criteria analysis, in several respects, is significantly different from the directions of activities indicated in the state energy policy.

1 June 2018
Verified
Conference Paper
Closed access
Robert MalkowskiRobert Malkowski
Robert Malkowski
PBPawel Bucko
Pawel Bucko
Marcin JaskólskiMarcin Jaskólski
Marcin Jaskólski
WPWojciech Pawlicki
Wojciech Pawlicki
ASAlicja Stoltmann
Alicja Stoltmann
The intermittency of renewable energy sources (RES) constitutes a challenge for effective power system control. Fossil-fuel-based units offering ancillary power services to meet the short-term power imbalance are a financial and environmental burden for the society. Energy storage systems (ESS) can be the solution in view of the electricity market development and growing environmental concern. The major questions are, in what circumstances participation in the day-ahead market (DAM) by means of the RES-ESS co-operation is technically feasible and how to size ESS for PV participation in DAM. This paper is an attempt of addressing these questions. To provide the answer, the simulation model of solar power generation system with battery ESS (BESS) was developed using DIgSILENT Power Factory environment.