Marcelo Andrés León Martínez

Dr. Marcelo Andrés León Martínez

Pontificia Universidad Católica de Valparaíso
orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 August 2020 in Processes
Verified
Journal Article
Open access
PDF file
Marcelo Andrés León MartínezMarcelo Andrés León Martínez
Marcelo Andrés León Martínez
Javier SilvaJavier Silva
Javier Silva
SCSamuel Carrasco
Samuel Carrasco
NBNelson Barrientos
Nelson Barrientos
A conceptual design of an industrial production plant for activated carbon was developed to process 31.25 tons/day of industrial waste nutshells as the raw material and produce 6.6 ton/day of activated carbon using steam as an activation agent. The design considered the cost of the main equipment, the purchase price of the nutshells, basic services, and operation. A sensitivity analysis was developed, considering the price of the finished product and the volume of raw material processing varied up to ±25%. Furthermore, the total annual cost of the product was determined based on the production of 2100 tons/year of activated carbon. Two cash flows were developed and projected to periods of 10 years and 15 years of production, using a tax rate of 27%, a low discount rate (LDR) of 10% per year, and without external financing. For a 10-year production project, the net present value (NPV) was USD 2,785,624, the internal return rate (IRR) 21%, the return on investment (ROI) 25%, and the discounted payback period (DPP) after the fifth year. Considering a project with 15 years of production, the NPV was USD 4,519,482, the IRR at 23%, the ROI 24%, and the DPP after the fifth year of production.

12 July 2023 in Energies
Verified
Journal Article
Open access
PDF file
Marcelo Andrés León MartínezMarcelo Andrés León Martínez
Marcelo Andrés León Martínez
Javier SilvaJavier Silva
Javier Silva
Rodrigo Andrés Ortiz-SotoRodrigo Andrés Ortiz-Soto
Rodrigo Andrés Ortiz-Soto
SCSamuel Carrasco
Samuel Carrasco
In this study, we present a pre-feasibility analysis that examines the viability of implementing autonomous green hydrogen production plants in two strategic regions of Chile. With abundant renewable energy resources and growing interest in decarbonization in Chile, this study aims to provide a comprehensive financial analysis from the perspective of project initiators. The assessment includes determining the optimal sizing of an alkaline electrolyzer stack, seawater desalination system, and solar and wind renewable energy farms and the focus is on conducting a comprehensive financial analysis from the perspective of project initiators to assess project profitability using key economic indicators such as net present value (NPV). The analyses involve determining appropriate sizing of an alkaline electrolyzer stack, a seawater desalination system, and solar and wind renewable energy farms. Assuming a base case production of 1 kiloton per year of hydrogen, the capital expenditures (CAPEX) and operating expenses (OPEX) are determined. Then, the manufacturing and production costs per kilogram of green hydrogen are calculated, resulting in values of USD 3.53 kg−1 (utilizing wind energy) and USD 5.29 kg−1 (utilizing photovoltaic solar energy). Cash flows are established by adjusting the sale price of hydrogen to achieve a minimum expected return on investment of 4% per year, yielding minimum prices of USD 7.84 kg−1 (with wind energy) and USD 11.10 kg−1 (with photovoltaic solar energy). Additionally, a sensitivity analysis is conducted to assess the impact of variations in investment and operational costs. This research provides valuable insights into the financial feasibility of green hydrogen production in Chile, contributing to understanding renewable energy-based hydrogen projects and their potential economic benefits. These results can provide a reference for future investment decisions and the global development of green hydrogen production plants.

30 June 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
SCSamuel Carrasco
Samuel Carrasco
Ernesto Pino CortésErnesto Pino Cortés
Ernesto Pino Cortés
ABAndrés Barra-Marín
Andrés Barra-Marín
AFAlejandro Fierro-Gallegos
Alejandro Fierro-Gallegos
Marcelo Andrés León MartínezMarcelo Andrés León Martínez
Marcelo Andrés León Martínez
Hydrothermal carbonization makes it possible to transform lignocellulosic biomass into hydrochar, a carbon-rich material that can be used as fuel. Hydrochar has less calorific value than standard coal but generates less ashes during combustion. This study is a pre-feasibility analysis carried out to evaluate technically-economically and environmentally the use of hydrochar as fuel or co-fuel in thermal power plants in Chile. Until now there are no reports about it. The proposal of this work was to study the replacement of coal with a fuel that uses the same equipment and processes in power generation but with less air emission and with an economically profitable change. The results suggest that a plant with a supply of 104 t/h of bituminous coal could be replaced between 18 and 37 t/h of hydrochar, with a reduction of 8 and 27% in NOx and SO2 emissions, a reduction in 7 to 24% in ashes and a marginal increase in CO2 emission. The proposed use of hydrochar was economically profitable, with internal rates of return of up to 40% and with cash flows that reached USD 22 million.

1 June 2017 in Electrochimica Acta
Verified
Journal Article
Closed access
LHL.A. Hernández
L.A. Hernández
GRG. Riveros
G. Riveros
FMF. Martín
F. Martín
DGD.M. González
D.M. González
MLM.C. Lopez
M.C. Lopez
Marcelo Andrés León MartínezMarcelo Andrés León Martínez
Marcelo Andrés León Martínez

30 December 2022 in Processes
Verified
Journal Article
Open access
PDF file
Rodrigo Andrés Ortiz-SotoRodrigo Andrés Ortiz-Soto
Rodrigo Andrés Ortiz-Soto
DLDaniela Leal
Daniela Leal
CGClaudia Gutiérrez
Claudia Gutiérrez
Alvaro Aracena CaipaAlvaro Aracena Caipa
Alvaro Aracena Caipa
Marcelo Andrés León MartínezMarcelo Andrés León Martínez
Marcelo Andrés León Martínez
HHHenrik K Hansen
Henrik K Hansen
In the present study, the assessment of heavy metal contaminant migration from fresh mine tailings was conducted using the electrokinetic remediation technique (EKR). In this sense, a pilot EKR cell was designed to evaluate the recovery potential of copper, nickel, and cobalt species. In particular, the focus was on the impacts of electric field intensity and pH in initial mixture and testing their interaction in copper, nickel, and cobalt migration. Experiments were made using a 22 factorial experimental design with a central point, using DC electric fields from 1.0 to 2.0 V cm−1 and H2SO4 pretreatment solutions from 1.0 to 2.0 mol L−1, along with an ANOVA test with error reduction. The metal removal rates were approximately 7% for cobalt, neglectable for copper, and 6% for nickel. In the best cases, the highest concentrations by migration at the cathodic zone were 11%, 31%, and 30%, respectively. According to ANOVA tests, factor interaction was proven for each metal in the half cell near the cathode and the closest zone from the cathode specifically. Both factors affected metal concentrations, which indicates that when the goal aims for species accumulation in a narrower section, each factor has a significant effect, and their interaction makes a proven enhancement. Thus, using 2.0 V cm−1 and 2.0 mol L−1 showed a high improvement in metal concentration in the cathodic zone.

6 July 2022 in Processes
Verified
Journal Article
Open access
PDF file
Javier SilvaJavier Silva
Javier Silva
Rodrigo Andrés Ortiz-SotoRodrigo Andrés Ortiz-Soto
Rodrigo Andrés Ortiz-Soto
Marcelo Andrés León MartínezMarcelo Andrés León Martínez
Marcelo Andrés León Martínez
MMMarjorie Morales
Marjorie Morales
GAGerman Aroca
German Aroca
The effect of the partition coefficient on the simulation of the operation of a biotrickling filter treating a mixture of sulfur compounds was analyzed to evaluate the pertinence of using Henry’s law in determining its removal capacity. The analysis consisted of the simulation of a biotrickling filter that bio-oxides hydrogen sulfide (H2S), dimethyl sulfide (DMS), methyl mercaptan (MM) and dimethyl disulfide (DMDS) using different types of models for determining the partition coefficient: Henry’s law for pure water, Henry’s law adjusted from experimental data, a mixed model (Extended UNIQUAC) and a semi-empirical model of two-parameters. The simulations were compared with experimental data. It was observed that Henry’s law for pure water could produce significant deviations from empirical data due to the liquid phase not being pure water. The two-parameter model better fits with similar results compared to the extended UNIQUAC model, with a lower calculation cost and necessary parameter amount. It shows that semi-empirical models can considerably improve simulation accuracy where complex phase interactions are present.