Due to a lack of suitable methods, extraction of reporting requirements from lengthy construction contracts is often completed manually. Because of this, the time and costs associated with completing reporting requirements are often informally approximated, resulting in underestimations. Without a clear understanding of requirements, contractors are prevented from implementing improvements to reporting workflows prior to project execution. This study developed an automated reporting requirement identification and time–cost prediction framework to overcome this challenge. Reporting requirements are extracted using Natural Language Processing (NLP) and Machine Learning (ML), and stochastic simulations are used to predict overhead costs and durations associated with report preparation. Functionality and validity of the framework were demonstrated using real contracts, and an accuracy of over 95% was observed. This framework provides a tool to rapidly and efficiently retrieve requirements and quantify the time and costs associated with reporting, in turn providing necessary insights to streamline reporting workflows.
Purpose: The bid/no-bid decision is critical to the success of construction contractors. The factors affecting the bid/no-bid decision are either qualitative or quantitative. Previous studies on modeling the bidding decision have not extensively focused on distinguishing qualitative and quantitative factors. Thus, the purpose of this paper is to improve the bidding decision in construction projects by developing tools that consider both qualitative and quantitative factors affecting the bidding decision.Design/methodology/approach: This study proposes a mixed qualitative-quantitative approach to deal with both qualitative and quantitative factors. The mixed qualitative-quantitative approach is developed by combining a rule-based expert system and fuzzy-based expert system. The rule-based expert system is used to evaluate the project based on qualitative factors and the fuzzy expert system is used to evaluate the project based on the quantitative factors in order to reach the comprehensive bid/no-bid decision.Findings: Three real bidding projects are used to investigate the applicability and functionality of the proposed mixed approach and are tested with experts of a construction company in Alberta, Canada. The results demonstrate that the mixed approach provides a more reliable, accurate and practical tool that can assist decision-makers involved in the bid/no-bid decision.Originality/value: This study contributes theoretically to the body of knowledge by (1) proposing a novel approach capable of modeling all types of factors (either qualitative or quantitative) affecting the bidding decision, and (2) providing means to acquire, store and reuse expert knowledge. Practical contribution of this paper is to provide decision-makers with a comprehensive model that mimics the decision-making process and stores experts' knowledge in the form of rules. Therefore, the model reduces the administrative burden on the decision-makers, saves time and effort and reduces bias and human errors during the bidding process.
Executed outdoors in high-wind areas, adverse weather conditions represent a significant risk to onshore wind farm construction activities. While methods for considering historical weather data during pre-construction scheduling are available, approaches capable of quantitatively assessing how short-term weather fluctuations may impact upcoming construction activities have yet to be developed. This study is proposing a hybrid simulation-based approach that uses short-term precipitation, wind speed, and temperature forecasts together with planned and as-built activity durations to develop lookahead (e.g., upcoming 14-day) schedules for improved project planning and control. Functionality and applicability of the method was demonstrated on a case study of a 40 MW onshore wind project, and the method was validated using event validity, face validation, and sensitivity analysis. As expected, favorable weather conditions experienced during the tested lookahead periods resulted in a negligible impact (less than 10% reduction) on the productivity of weather-sensitive activities, which translated into a project delay of one day. The responsiveness of the framework was confirmed through sensitivity analysis, which demonstrated a 50% reduction in productivity resulting from poor weather conditions. The ability of the method to provide decision-support not currently offered by commercially-available scheduling systems was confirmed by subject experts, who endorsed the ability of the method to enhance lookahead scheduling and to facilitate the monitoring and control of weather impact uncertainty on project durations.
24 May 2019 in Proceedings of the 37th International Symposium on Automation and Robotics in Construction (isarc)
Currently, input modeling for Monte Carlo simulation (MSC) is performed either by fitting a probability distribution to historical data or using expert elicitation methods when historical data are limited. These approaches, however, are not suitable for wind farm construction, where—although lacking in historical data—large amounts of subjective knowledge describing the impacts of risk factors are available. Existing approaches are also limited by their inability to consider a risk factor’s impact on cost and schedule as dependent. This paper is proposing a methodology to enhance input modeling in Monte Carlo risk assessment of wind farm projects based on fuzzy set theory and multivariate modeling. In the proposed method, subjective expert knowledge is quantified using fuzzy logic and is used to determine the parameters of a marginal generalized Beta distribution. Then, the correlation between the cost and schedule impact is determined and fit jointly into a bivariate distribution using copulas. To evaluate the feasibility of the proposed methodology and to demonstrate its main features, the method was applied to an illustrative case study, and sensitivity analysis and face validation were used to evaluate the method. The results demonstrated that the proposed approach provides a reliable method for enhancing input modeling in Monte Carlo simulation (MCS).