Pieter Willem Maarten Vasbinder

Dr. Pieter Willem Maarten Vasbinder

Rijksuniversiteit Groningen
+1

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 September 2021 in Energies
Verified
Journal Article
Open access
PDF file
Pieter Willem Maarten VasbinderPieter Willem Maarten Vasbinder
Pieter Willem Maarten Vasbinder
AVAntoine W. G. de Vries
Antoine W. G. de Vries
WWWim Westerman
Wim Westerman
This study aims to assess the potential risks of setting up a hydrogen infrastructure in the Netherlands. An integrated risk assessment framework, capable of analyzing projects, identifying risks and comparing projects, is used to identify and analyze the main risks in the upcoming Dutch hydrogen infrastructure project. A time multiplier is added to the framework to develop parameters. The impact of the different risk categories provided by the integrated framework is calculated using the discounted cash flow (DCF) model. Despite resource risks having the highest impact, scope risks are shown to be the most prominent in the hydrogen infrastructure project. To present the DCF model results, a risk assessment matrix is constructed. Compared to the conventional Risk Assessment Matrix (RAM) used to present project risks, this matrix presents additional information in terms of the internal rate of return and risk specifics.