Seonghyeon Kim

Mr. Seonghyeon Kim

orcid

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 May 2025 in Energies
Verified
Journal Article
Open access
PDF file
SKSeonghyeon Kim
Seonghyeon Kim
YKYoungjin Kim
Youngjin Kim
SCSungyun Choi
Sungyun Choi
To validate microgrid systems, precise simulations are necessary beforehand. Traditional Hardware-in-the-Loop Simulation (HILS) is used to validate systems by creating a digital twin environment that integrates software and hardware to mimic reality. However, HILS requires high investment costs for hardware, posing a significant hurdle for companies. To address this issue, this study proposes a Software-in-the-Loop Simulation (SILS) framework using SCADA/EMS and MATLAB/Simulink(R2024a). The proposed SILS framework is highly compatible with Energy Management Systems (EMSs) and Supervisory Control and Data Acquisition (SCADA), allowing near real-time data exchange and scenario-based analysis without relying on physical hardware. According to the simulation results, SILS effectively replicates the dynamic behavior of microgrid components such as solar power generation systems, energy storage systems (ESSs), and diesel generators. Solution providers can quickly conduct feasibility tests through systems that simulate actual power systems. They can test the operation of SCADA/EMS at a lower cost and reduce on-site time, thereby reducing business costs and preemptively addressing potential issues in the field. This paper demonstrates how SILS can contribute to establishing optimal operation strategies and power supply stability through case studies, including daily operation optimization and autonomous operation scenarios for microgrids. This research provides a foundation for the feasibility of microgrid solution construction by enabling software performance evaluations and the verification of economic expected returns in the early stages of a project.

15 May 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
SKSeonghyeon Kim
Seonghyeon Kim
YSYongju Son
Yongju Son
HWHyeon Woo
Hyeon Woo
XZXuehan Zhang
Xuehan Zhang
SCSungyun Choi
Sungyun Choi
When power system equipment fails due to disasters, resulting in the isolation of parts of the network, the loads within the isolated system cannot be guaranteed a continuous power supply. However, for critical loads—such as hospitals or data centers—continuous power supply is of utmost importance. While distributed energy resources (DERs) within the network can supply power to some loads, outages may lead to compensation and fairness issues regarding the unsupplied loads. In response, this study proposes a methodology to determine the appropriate power contract price for key customers by estimating the unsupplied power demand for critical loads in isolated networks and incorporating both outage compensation costs and voltage stability penalties. The microgrid under consideration comprises DERs—including electric vehicles (EVs), fuel cell electric vehicles (FCEVs), photovoltaic (PV) plants, and wind turbine (WT) plants—as well as controllable resources such as battery energy storage systems (BESS) and hydrogen energy storage systems (HESS). It serves both residential load clusters and critical loads associated with social infrastructure. The proposed methodology is structured in two stages. In normal operating conditions, optimal scheduling is simulated using second-order conic programming (SOCP). In the event of a fault, mixed-integer SOCP (MISOCP) is employed to determine the optimal load shedding strategy. A case study is conducted using the IEEE 123 bus test node system to simulate the outage compensation cost calculation and voltage penalty assessment processes. Based on this analysis, a contract price for key customers that considers both disaster-induced outages and voltage impacts is presented.