Ruipeng Guo

Dr. Ruipeng Guo

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 May 2016 in Journal of Modern Power Systems and Clean Energy
Verified
Journal Article
Open access
PDF file
HHHaifeng Hong
Haifeng Hong
ZHZhesheng Hu
Zhesheng Hu
RGRuipeng Guo
Ruipeng Guo
JMJun Ma
Jun Ma
JTJiong Tian
Jiong Tian
We present a directed graph-based method for distribution network reconfiguration considering distributed generation. Two reconfiguration situations are considered: operation mode adjustment with the objective of minimizing active power loss (situation I) and service restoration with the objective of maximizing loads restored (situation II). These two situations are modeled as a mixed integer quadratic programming problem and a mixed integer linear programming problem, respectively. The properties of the distribution network with distributed generation considered are reflected as the structure model and the constraints described by directed graph. More specifically, the concepts of “in-degree” and “out-degree” are presented to ensure the radial structure of the distribution network, and the concepts of “virtual node” and “virtual demand” are developed to ensure the connectivity of charged nodes in every independent power supply area. The validity and effectiveness of the proposed method are verified by test results of an IEEE 33-bus system and a 5-feeder system.

26 March 2018 in Energies
Verified
Journal Article
Open access
PDF file
XJXing Jiang
Xing Jiang
CYChengjin Ye
Chengjin Ye
Yi DingYi Ding
Yi Ding
RGRuipeng Guo
Ruipeng Guo
In recent years, the ultra-high voltage direct current (UHVDC) transmission system has been developed rapidly for its significant long-distance, high-capacity and low-loss properties. Equipment failures and overall outages of the UHVDC system have increasingly vital influence on the power supply of the receiving end grid. To improve the reliability level of UHVDC systems, a quantitative selection and configuration approach of redundant structures is proposed in this paper, which is based on multi-state reliability equivalence. Specifically, considering the symmetry characteristic of an UHVDC system, a state space model is established as a monopole rather than a bipole, which effectively reduces the state space dimensions to be considered by deducing the reliability merging operator of two poles. Considering the standby effect of AC filters and the recovery effect of converter units, the number of available converter units and corresponding probability are expressed with in universal generating function (UGF) form. Then, a sensitivity analysis is performed to quantify the impact of component reliability parameters on system reliability and determine the most specific devices that should be configured in the redundant structure. Finally, a cost-benefit analysis is utilized to help determine the optimal scheme of redundant devices. Case studies are conducted to demonstrate the effectiveness and accuracy of the proposed method. Based on the numerical results, configuring a set of redundant transformers is indicated to be of the greatest significance to improve the reliability level of UHVDC transmission systems.

12 July 2023 in Energies
Verified
Journal Article
Open access
PDF file
YSYishan Shi
Yishan Shi
RGRuipeng Guo
Ruipeng Guo
YTYuchen Tang
Yuchen Tang
YLYi Lin
Yi Lin
ZYZhanxin Yang
Zhanxin Yang
The penetration of wind turbines and other power sources with strong uncertainty into the grid has increased in recent years. It has brought significant technical challenges to power systems’ operation. The volatility and intermittency of wind power increase the risk of insufficient transmission capacity of the lines. Therefore, the traditional deterministic planning methods for transmission grids are no longer fully applicable. On the other hand, the frequent disasters in recent years have posed a great threat to the power system, especially for the transmission grid. This requires the design of transmission lines with high design standards, such as skeleton networks, to withstand disasters. With the aim to address these problems, a bi-level integrated network planning model for the transmission grid is developed by considering wind power’s uncertainty and load guarantee under disasters. Chance constraints are used in the model to characterize wind power’s uncertainty, and a skeleton network is adopted to cope with disasters. Moreover, based on a convex relaxation method, the chance constraints are converted into the probabilistic inequalities to be solved. The proposed method is simulated in the IEEE 118 bus system, and the obtained network planning scheme is further analyzed in the scenario tests. And the result of the tests proves the validity and reasonableness of the proposed method.

21 May 2025 in Energies
Verified
Journal Article
Open access
PDF file
YYYun Yang
Yun Yang
ZMZichao Meng
Zichao Meng
GWGuobing Wu
Guobing Wu
ZYZhanxin Yang
Zhanxin Yang
RGRuipeng Guo
Ruipeng Guo
Probabilistic modeling of net load forecast errors is an important approach for reserve decision-making in power systems with a high penetration of renewable energy. However, existing probabilistic modeling methods face issues such as insufficient estimation accuracy in the small probability interval of the tails or increased complexity in probability decision-making problems. A probabilistic reserve decision-making method based on cumulative probability approximation is proposed. By using key points on the cumulative probability distribution curve of net load forecast error samples, this method enhances the fitting accuracy of the normal distribution model in the small probability interval of the tail, resulting in an optimal reserve outcome with the desired comprehensive expected profit. Using relevant renewable energy output and load data from actual transmission networks in Guangdong Province, China, the proposed method demonstrates good practical value.

29 October 2023 in Energies
Verified
Journal Article
Open access
PDF file
WZWentao Zhang
Wentao Zhang
RGRuipeng Guo
Ruipeng Guo
YSYishan Shi
Yishan Shi
YTYuchen Tang
Yuchen Tang
YLYi Lin
Yi Lin
In order to ensure the security of power grids and control the level of short-circuit currents, a multi-objective optimization method for power grid partitioning is proposed. This method takes into consideration both short-circuit currents and multi-scenario safety constraints. A power grid partitioning optimization model is established to achieve objectives such as minimizing disconnected lines, maximizing safety margins, and ensuring load balance in the main transformers. The model aims to satisfy constraints related to short-circuit current levels, base-case power flow, and N − 1 security. To address the significant deviation in the static security constraint model caused by large amounts of active power losses in large-scale power grids, an improved direct current model is proposed to reduce these errors and meet the accuracy requirements for grid partitioning optimization. Additionally, to adapt to the variability of renewable energy output, an optimization method is proposed, combining three scenarios of renewable energy generation while satisfying short-circuit current and static security constraints. The power grid partitioning model is mathematically formulated as a large-scale mixed-integer linear programming problem, which presents challenges in terms of hardware requirements and computational complexity when solved directly. To mitigate these challenges, equivalent WARD values are assigned to the short-circuit current constraints, base-case constraints, and anticipated fault-induced power flow constraints. Anticipated faults and bottleneck branches are accurately incorporated, and the problem is decomposed into smaller-scale mixed-integer linear programming problems, solved in a stepwise iterative manner. This approach significantly improves computational efficiency and meets the requirements of practical large-scale power grid applications. To validate the proposed model and algorithm, a simulation program is developed using C++, and a simulation analysis of a regional transmission network is conducted. The program ensures the correctness of the proposed model and demonstrates the effectiveness of the algorithm.

21 April 2025 in Preprints.org
Verified
Preprint
Open access
PDF file
YYYun Yang
Yun Yang
ZMZichao Meng
Zichao Meng
GWGuobing Wu
Guobing Wu
ZYZhanxin Yang
Zhanxin Yang
RGRuipeng Guo
Ruipeng Guo
Probabilistic modeling of net load forecast errors is an important approach for reserve decision-making in power systems with a high penetration of renewable energy. However, existing probabilistic modeling methods face issues such as insufficient estimation accuracy in the small probability interval of the tails or increased complexity in probability decision-making problems. A probabilistic reserve decision-making method based on cumulative probability approximation is proposed. By using key points on the cumulative probability distribution curve of net load forecast error samples, this method enhances the fitting accuracy of the normal distribution model in the small probability interval of the tail, resulting in an optimal reserve outcome with the desired comprehensive expected profit. Using relevant renewable energy output and load data from actual transmission networks in Belgium and Guangdong Province, China, the proposed method demonstrates good practical value.