Jaewook Jeong

Prof. Jaewook Jeong

Assistant Professor at Department of Safety Engineering, Seoul National University of Science and Technology
orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2016 in Applied Energy
Verified
Journal Article
Closed access
HPHyo Seon Park
Hyo Seon Park
MLMinhyun Lee
Minhyun Lee
HKHyuna Kang
Hyuna Kang
Taehoon HongTaehoon Hong
Taehoon Hong
Jaewook JeongJaewook Jeong
Jaewook Jeong

1 January 2017 in Journal of Cleaner Production
Verified
Journal Article
Closed access
Jaewook JeongJaewook Jeong
Jaewook Jeong
Taehoon HongTaehoon Hong
Taehoon Hong
CJChangyoon Ji
Changyoon Ji
JKJimin Kim
Jimin Kim
MLMinhyun Lee
Minhyun Lee
SLSeunghwan Lee
Seunghwan Lee

1 October 2017 in Applied Energy
Verified
Journal Article
Closed access
JKJimin Kim
Jimin Kim
Taehoon HongTaehoon Hong
Taehoon Hong
JJJeong Jaemin
Jeong Jaemin
MLMyeonghwi Lee
Myeonghwi Lee
MLMinhyun Lee
Minhyun Lee
Jaewook JeongJaewook Jeong
Jaewook Jeong

11 October 2022 in Buildings
Verified
Journal Article
Open access
PDF file
MAMohammad Amin Ashtari
Mohammad Amin Ashtari
Ramin AnsariRamin Ansari
Ramin Ansari
EHErfan hassannayebi
Erfan hassannayebi
Jaewook JeongJaewook Jeong
Jaewook Jeong
Cost overrun risks are declared to be dynamic and interdependent. Ignoring the relationship between cost overrun risks during the risk assessment process is one of the primary reasons construction projects go over budget. Conversely, recent studies have failed to account for potential interrelationships between risk factors in their machine learning (ML) models. Additionally, the presented ML models are not interpretable. Thus, this study contributes to the entire ML process using a Bayesian network (BN) classifier model by considering the possible interactions between predictors, which are cost overrun risks, to predict cost overrun and assess cost overrun risks. Furthermore, this study compared the BN classifier model’s performance accuracy to that of the Naive Bayes (NB) and decision tree (DT) models to determine the effect of considering possible correlations between cost overrun risks on prediction accuracy. Moreover, the most critical risks and their relationships are identified by interpreting the learned BN model. The results indicated that the 18 BN models demonstrated an average prediction accuracy of 78.86%, significantly higher than the NB and DT. The present study identified the most significant risks as an increase in the cost of materials, lack of knowledge and experience among human resources, and inflation.

5 January 2025 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
Louis KumiLouis Kumi
Louis Kumi
Jaewook JeongJaewook Jeong
Jaewook Jeong
JJJeong Jaemin
Jeong Jaemin
JSJaehui Son
Jaehui Son
HMHyeongjun Mun
Hyeongjun Mun

1 March 2022 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PDF file
JJJeong Jaemin
Jeong Jaemin
Jaewook JeongJaewook Jeong
Jaewook Jeong
The construction industry involves a variety of construction works, all of which differ in terms of the frequency and probability of fatal incidents and types of accidents. Accordingly, the risk level of various construction works should be defined for effective safety management at the design and construction phases. This study proposes an approach for quantifying the risk level of fatal incidents in construction works based on frequency and probability analysis using estimation and clustering methods. The main study objective is accomplished in four steps. It was found that the average normalized ranking (ANR) ranged from 2.51 to 26.88, with the most dangerous construction works being scaffolding and demolition works (2.51). Based on the ANR, 27 construction works were categorized into five groups with risk levels ranked from 1 to 5. Risk level 5, the most dangerous group of construction works, was composed of scaffolding and demolition works and roofing and sheet metal construction works, both of which were higher than other construction works considering the frequency and probability of fatal incidents.