Sanghyeok Kang

Dr. Sanghyeok Kang

Incheon National University, Incheon, Republic of Korea
orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 June 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HYHayeon Yhee
Hayeon Yhee
SKSungpyo Kim
Sungpyo Kim
SKSanghyeok Kang
Sanghyeok Kang
Social infrastructure is provided to improve the quality of life of residents. There are two approaches to social infrastructure planning: (1) a population-based approach and (2) an access-based approach. A plan for the social infrastructure facilities in South Korea has been developed based on the population or number of households in a region. Recently, the South Korean government presented a guideline in which accessibility is included in the criteria. This study proposes a comprehensive evaluation method for the accessibility of social infrastructure and for identifying residential areas with poor access. To obtain the travel time between the residence and the social infrastructure facility, we employed a navigation application programming interface that provides a travel time that reflects the resistances in an actual situation. The accessibility index (AI) is defined as a population-weighted average travel time. We also identified residential areas with poor access to social infrastructure by creating accessibility maps. This study includes social infrastructure facilities, such as parks, libraries, elementary schools, childcare centers, kindergartens, and sports facilities. The method proposed in this study was applied to Namdong-gu, Incheon Metropolitan City, South Korea, to evaluate its applicability. The proposed method has advantages in that (1) the AI is easy to understand because it represents an intuitive index for the overall accessibility in minutes of a region, and (2) accessibility maps effectively identify residential areas with poor access.

4 March 2020 in Journal of Advanced Transportation
Verified
Journal Article
Open access
PDF file
JLJooyoung Lee
Jooyoung Lee
JYJiho Yeo
Jiho Yeo
IYIlsoo Yun
Ilsoo Yun
SKSanghyeok Kang
Sanghyeok Kang
The aim of this study was to evaluate the effects of driver-related factors on crash involvement of four different types of commercial vehicles—express buses, local buses, taxis, and trucks—and to compare outcomes across types. Previous studies on commercial vehicle crashes have generally been focused on a single type of commercial vehicle; however, the characteristics of drivers as factors affecting crashes vary widely across types of commercial vehicles as well as across study sites. This underscores the need for comparative analysis between different types of commercial vehicles that operate in similar environments. Toward these ends, we analyzed 627,594 commercial vehicle driver records in South Korea using a mixed logit model able to address unobserved heterogeneity in crash-related data. The estimated outcomes showed that driver-related factors have common effects on crash involvement: greater experience had a positive effect (diminished driver crash involvement), while traffic violations, job change, and previous crash involvement had negative effects. However, the magnitude of the effects and heterogeneity varied across different types of commercial vehicles. The findings support the contention that the safety management policy of commercial drivers needs to be set differently according to the vehicle type. Furthermore, the variables in this study can be used as promising predictors to quantify potential crash involvement of commercial vehicles. Using these variables, it is possible to proactively identify groups of accident-prone commercial vehicle drivers and to implement effective measures to reduce their involvement in crashes.

1 January 2017 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
WYWi sung Yoo
Wi sung Yoo
JYJaewoong Yang
Jaewoong Yang
SKSanghyeok Kang
Sanghyeok Kang
SangHyun LeeSangHyun Lee
SangHyun Lee
Over the past decade, Nuclear Power Plant (NPP) projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the target completion time and cost. NPP projects have frequently exceeded the planned time and cost despite reliable estimates at the start of the project. This was attributed to unpredictable causes at the beginning and to shortage of proper tools to quantitatively analyze the inevitable uncertainties. To overcome these difficulties, computerized systems have been widely proposed in the construction industry as effective aids to proactively control the potential risks and to monitor continuously their status and variation. However, there are few risk management systems focused on NPP projects. In this study, we developed a computer-based risk management system for NPP projects, called Nuclear Risk Management System (NuRMS), which is helpful for furnishing project managers with warning signals as a project is progressing and for tracking the changes in risk variation at a desired confidence level. In developing the NuRMS, the Risk Breakdown Structure (RBS), the weights for risk categorization, computation of the Total Risk Score (TRS), and integration of risk analysis tools with relation-based and cost-loaded activity schedule were core tasks. To demonstrate the efficiency of the developed NuRMS, the system was operated using risk information derived from constructing the auxiliary buildings of Shin-Kori units 3 and 4 located in Korea, as an illustrative case. The results showed the system’s capacities and suggested that it may be applied to a real NPP engineering, procurement, and construction project. The developed NuRMS is expected to assist a project manager in monitoring, tracking, and controlling potential impacts of risk events during the overall implementation of NPP projects.

31 August 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JCJaehong Cho
Jaehong Cho
SKSungpyo Kim
Sungpyo Kim
NKNamyoung Kim
Namyoung Kim
SKSanghyeok Kang
Sanghyeok Kang
Remote collaboration for construction site management is challenging. Building Information Modeling (BIM) provides the potential for remote collaboration based on its powerful data compatibility. Furthermore, the recently evolving Mixed Reality technology improves visual perception by superimposing 3D virtual BIM objects on real-world artifacts. This study proposes a remote collaboration system based on BIM in Mixed Reality. This system consists of three-unit systems: (1) Field Operator System (FOS), (2) Communication Server, and (3) Office Manager System (OMS). FOS was developed based on MR smart glasses for a field operator. The field operator can manipulate virtual BIM objects with finger-pointing cues and share the view with an office manager. FOS creates Mixed Reality Capture (MRC) video, the combined image of real-world images of existing artifacts in the construction site with virtual BIM elements superimposed on them, and sends it through the Communication Server to OMS. Thus, the office manager can see the field operator’s view through OMS based on a desktop or tablet PC. The office manager can give instructions to a field operator by voice through OMS. A user test was conducted to evaluate the applicability of the developed prototype system. As a result of the test, it was found that most of the testers had a positive evaluation of the developed system. This paper discusses the development of the BIM and MR-based remote collaboration and the test results.

28 March 2023 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
SKSanghyeok Kang
Sanghyeok Kang
YKYoungcheol Kang
Youngcheol Kang
Seok KimSeok Kim
Seok Kim
This bibliographic study presents a historical perspective on Korea’s construction engineering and management (CEM) research and reports a 27-year analysis of papers written by Korean CEM researchers between 1993 and 2019. Frequency analysis of the collected papers was performed according to three main perspectives: the knowledge area, research topics, and methods. Knowledge area analysis shows that research fields have become more diversified and subdivided. Construction technology, cost management, and planning and schedule management have consistently maintained the top three positions for the past three decades. In addition, quality management, resource management, and risk management were also ranked high in the 2000s. In the 2010s, safety management, environmental management, quality management, and construction industry and business were ranked high. These changes reveal how Korean society’s and industry’s demands have changed over the years. Furthermore, the findings from keyword frequency analysis revealed that the focus of CEM research was mostly on cost and scheduling in the 1990s and on scheduling, risk, cost, and construction automation in the 2000s. The advent of Building Information Modeling (BIM) in the 2010s was an epochal change. This study found that the research methods frequently used by CEM researchers were simulation, optimization, regression analysis, computer vision and image processing, 3D modeling, case-based reasoning, genetic algorithm, case study, economic analysis, and artificial neural network.

JLJiseon Lim
Jiseon Lim
JCJaehong Cho
Jaehong Cho
JKJeonghwan Kim
Jeonghwan Kim
SKSanghyeok Kang
Sanghyeok Kang
This study addresses occupational safety in reinforced concrete construction, an area marked by high accident rates and significant worker injury risks. By focusing on activity–body part (A–BP) combinations, this research introduces a novel framework for quantifying injury risks across construction activities. Reinforced concrete construction tasks are categorized into ten specific activities within three major work types: rebar work, formwork, and concrete placement. These are further analyzed concerning six critical body parts frequently injured on-site: head/face, arm/shoulder, wrist/hand, torso, leg/pelvis, and foot/ankle. Using data from 2283 construction accident reports and expert surveys, the probability and severity of injuries for each A–BP element were calculated. Probability scores were derived from actual incident data, while severity scores were determined via expert evaluations, considering injury impact and the required recovery time. To ensure precision and comparability, scores were standardized across scales, enabling a final risk assessment for each A–BP. Results identified that wrist and hand injuries during rebar work activities, particularly cutting and shaping, exhibited the highest risk, underscoring the need for focused protective measures. This study contributes to construction safety management by providing detailed insights into injury risk based on activity–body part interactions, offering safety managers data-driven recommendations for tailored protective equipment, enhanced training, and preventive protocols. This research framework not only helps optimize safety interventions on conventional construction sites but also establishes a basis for future studies aimed at adapting these strategies to evolving construction methods.