Sylvester Azevedo

Prof. Sylvester Azevedo

IFRN
+1
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 May 2020 in Energies
Verified
Journal Article
Open access
PDF file
Sylvester AzevedoSylvester Azevedo
Sylvester Azevedo
Amaro PereiraAmaro Pereira
Amaro Pereira
Neilton Fidelis SilvaNeilton Fidelis Silva
Neilton Fidelis Silva
RARenato Samuel Barbosa de Araújo
Renato Samuel Barbosa de Araújo
AJAntonio Aldísio Carlos Júnior
Antonio Aldísio Carlos Júnior
Brazilian offshore potential exploration is still in its early stages, with no single offshore park in operation or being implemented. Unlike the already identified onshore wind potential—with over 14 GW installed in the form of onshore wind turbines—offshore wind potential research is absent and restricted to limited areas. In this context, this study aims to identify offshore wind potential throughout the Brazilian coast for electricity generation. The research method took into account the average annual wind velocity records as 100 m/s, as well as bathymetry and the distance from the coast baseline, to classify areas displaying the greatest potential, applying an analytic hierarchy process (AHP) to the geographic information system for the identification of potential offshore wind energy exploration sites. Environmental conservation units were considered exclusion areas. The installable capacity using aerogenerators was estimated at 3 TW, while an annual average power production of 14,800 TWh was calculated for the sum of the viable areas. These results demonstrate that the wind potential identified throughout the Brazilian coast provides the conditions for significant energy sector development. To this end, it is necessary to establish an ecological economic zoning of the areas displaying the greatest potential identified herein for the beginning of offshore exploration in Brazil.