Umit Isikdag

Prof. Dr. Umit Isikdag

Informatics, Mimar Sinan Güzel Sanatlar Üniversitesi, Istanbul, İstanbul, Turkey (Türkiye)
orcid

Research Focus & Metrics

Academic Career Length

27Years (2000-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2013 in Computers, Environment and Urban Systems
Verified
Journal Article
Closed access
Umit IsikdagUmit Isikdag
Umit Isikdag
Sisi ZlatanovaSisi Zlatanova
Sisi Zlatanova
JUJason Underwood
Jason Underwood

1 October 2008 in Advanced Engineering Informatics
Verified
Journal Article
Closed access
Umit IsikdagUmit Isikdag
Umit Isikdag
JUJason Underwood
Jason Underwood
GAGhassan Aouad
Ghassan Aouad

2 October 2022 in Construction and Building Materials
Verified
Journal Article
Closed access
CCCelal Cakiroglu
Celal Cakiroglu
KIKamrul Islam
Kamrul Islam
GBGebrail Bekdaş
Gebrail Bekdaş
Umit IsikdagUmit Isikdag
Umit Isikdag
SMSujith Mangalathu
Sujith Mangalathu

28 January 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
Yaren AydınYaren Aydın
Yaren Aydın
Umit IsikdagUmit Isikdag
Umit Isikdag
Gebrail BekdaşGebrail Bekdaş
Gebrail Bekdaş
Sinan Melih NigdeliSinan Melih Nigdeli
Sinan Melih Nigdeli
Zong Woo GeemZong Woo Geem
Zong Woo Geem
In the design of reliable structures, the soil classification process is the first step, which involves costly and time-consuming work including laboratory tests. Machine learning (ML), which has wide use in many scientific fields, can be utilized for facilitating soil classification. This study aims to provide a concrete example of the use of ML for soil classification. The dataset of the study comprises 805 soil samples based on the soil drillings of the new Gayrettepe–Istanbul Airport metro line construction. The dataset has both missing data and class imbalance. In the data preprocessing stage, first, data imputation techniques were applied to deal with the missing data. Two different imputation techniques were tested, and finally, the data were imputed with the KNN imputer. Later, a balance was achieved with the synthetic minority oversampling technique (SMOTE). After the preprocessing, a series of ML algorithms were tested with 10-fold cross-validation. Unlike the studies conducted in previous research, new gradient-boosting methods such as XGBoost, LightGBM, and CatBoost were tested, high classification accuracy rates of up to +90% were observed, and a significant improvement in the accuracy of prediction (when compared with previous research) was achieved.

1 August 2010 in Automation in Construction
Verified
Journal Article
Closed access
Umit IsikdagUmit Isikdag
Umit Isikdag
JUJason Underwood
Jason Underwood