Xuetang Xiong

Dr. Xuetang Xiong

School of Civil Engineering and Transportation, Foshan University, Foshan, Guangdong, China
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 December 2023 in Construction and Building Materials
Verified
Journal Article
Closed access
Xuetang XiongXuetang Xiong
Xuetang Xiong
AMAnxin Meng
Anxin Meng
JLJie Lu
Jie Lu
Yiqiu TanYiqiu Tan
Yiqiu Tan
BCBo Chen
Bo Chen
JHJinyuan Hu
Jinyuan Hu

1 September 2021 in Construction and Building Materials
Verified
Journal Article
Closed access
Xuetang XiongXuetang Xiong
Xuetang Xiong
SXShenqing Xiao
Shenqing Xiao
YTYiqiu Tan
Yiqiu Tan
XZXiaoning Zhang
Xiaoning Zhang
DZDejin Zhang
Dejin Zhang
WWWei Wang
Wei Wang

31 December 2025 in International Journal of Pavement Engineering
Verified
Journal Article
Closed access
Xuetang XiongXuetang Xiong
Xuetang Xiong
Yiqiu TanYiqiu Tan
Yiqiu Tan
ZHZhiyong Huang
Zhiyong Huang
BCBo Chen
Bo Chen
QHQitao Huang
Qitao Huang
Accurate identification of complex semi-rigid base cracks (e.g., transverse, longitudinal, etc.) in asphalt pavement using two-dimensional ground penetrating radar (GPR) remains challenging due to unclear edges and particle-filled morphologies. To tackle this problem, an innovative method for the joint identification of multi-profile GPR echo features of base cracks has been proposed. Firstly, three-dimensional GPR (3D-GPR) as a non-destructive testing (NDT) technology, was used to scan pavement internal structure efficiently. Then, the pavement vertical and horizontal sections GPR images containing echo features of base cracks (Crack-V and Crack-H), were obtained to construct deep learning datasets (training, validation, and test sets). The datasets have 1220 pavement GPR images, including 2150 and 1111 echo features of base cracks from vertical, horizontal sections GPR images, respectively. Finally, the networks of YOLOv5 series models were trained, validated, and tested by these datasets sequentially. The results show that when the recognition results of Crack-V and Crack-H based on YOLOv5x model are combined for judgment, the overall detection accuracy of base cracks can reach 93.1%, which is a 5.6% improvement compared to that of a single-dimensional GPR profile. The proposed method can effectively detect both transverse and longitudinal cracks in the base layers.

4 January 2024 in International Journal of Pavement Research and Technology
Verified
Journal Article
Closed access
PDF file
Xuetang XiongXuetang Xiong
Xuetang Xiong
Yiqiu TanYiqiu Tan
Yiqiu Tan
JHJinyuan Hu
Jinyuan Hu
XHXiaojie Hong
Xiaojie Hong
TJTang Jiaming
Tang Jiaming

24 February 2023 in International Journal of Pavement Engineering
Verified
Journal Article
Closed access
Xuetang XiongXuetang Xiong
Xuetang Xiong
Yiqiu TanYiqiu Tan
Yiqiu Tan
The patch recognition and localisation from high-resolution pavement images play a key role in evaluating asphalt pavement condition. To achieve the purpose, two line-scan cameras were employed to acquire lots of full-scale asphalt pavement images with 1 mm2 per pixel resolution in the field. The raw images were pre-processed to construct the dataset, including 984 patches of various shapes in 827 pavement images. Subsequently, the YOLO series models innovatively applied in automatically detecting the patches from pavement images were well trained with the pavement training and validation sets. The testing results reveal that the F1-score and mAP@0.5 values of the YOLOv4 model are 0.911 and 92.92% respectively in the test set. The comprehensive recognition accuracy of the YOLOv4 model outperforms the other YOLO models. And the detection speed of the YOLOv4 model for pavement data video is 38.1 frames per second. Additionally, all the features of patches in the partial testing pavement images, no matter whether they are strip, block, intersection, blurry within the shadow, or background noise, can be correctly predictedby the rectangular box. The average localisation errors of the width and height of the predicted patches are 21 and 16 mm respectively, and the average IoU is 0.83.

9 April 2025 in Polymers
Verified
Journal Article
Open access
PDF file
CFChuanbin Fan
Chuanbin Fan
QHQitao Huang
Qitao Huang
FLFeng Lin
Feng Lin
WLWeixiong Li
Weixiong Li
Xuetang XiongXuetang Xiong
Xuetang Xiong
Huayang YuHuayang Yu
Huayang Yu
The bonding performance of epoxy resin adhesives plays a critical role in ensuring interlayer adhesion and long-term durability in steel bridge deck pavements. However, the construction environment temperature and curing time significantly influence the bonding properties of epoxy resin adhesives. To address this issue, systematic evaluations of the bonding performance and tack-free time of epoxy resin adhesives were conducted. The results demonstrate that under identical curing durations, the tensile bond strength between the epoxy resin bonding layer and steel plate increases with higher curing temperatures. Similarly, at constant curing temperatures, extended curing times lead to improved tensile strength. Both higher temperatures and longer curing durations reduce the tack-free time of the epoxy resin adhesive. Under natural outdoor curing conditions, the epoxy resin adhesive achieves design requirements for both tensile strength and tack-free time after 48 h of curing, ensuring optimal interlayer bonding and workability. Conversely, prolonged curing beyond 72 h results in significantly reduced bonding strength while maintaining acceptable tack-free time. For ambient temperature conditions, the optimal curing duration for epoxy resin adhesive is determined to be 48~72 h, balancing both bonding performance and construction requirements (preventing adhesion to construction equipment). This research offers technical guidance for the field construction of epoxy pavement on steel bridge decks by establishing optimal curing protocols for epoxy resin adhesives to ensure reliable bonding performance and construction workability.