Xubo Zhao

Dr. Xubo Zhao


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 May 2024 in Scientific Reports
Verified
Journal Article
Open access
EWEn Wang
En Wang
SYShuaifeng Yin
Shuaifeng Yin
QKQingtao Kang
Qingtao Kang
XZXubo Zhao
Xubo Zhao
QLQiankun Lan
Qiankun Lan
HLHuiyang Liang
Huiyang Liang
In order to control the deformation of surrounding rock in deep high-stress and intense-mining roadways, taking a deep coal roadway with continuous deformation as an example, the characteristics of crustal stress, coal strength, and mining influence of roadway are obtained by underground tests. The combined failure mechanism of coal roadway surrounding-rock is revealed by differential stress of deep and shallow anchor cables. We propose that the improvement of surrounding rock control for coal roadway is adopting the coupling control technology of anchoring and unloading. The stress distribution and evolution laws of lateral surrounding rock of unloading holes are obtained by numerical simulation and theoretical calculation, and reasonable unloading-hole spacing of 4.0 m is comprehensively determined. A mechanical model of roadway roof beam under fixed support at both ends is constructed and the important role of anchor cable beam-truss in controlling the stability of coal roadway is obtained. The rationality of coupling control technology of anchoring and unloading and parameters has been verified by engineering test and mine pressure observation, providing technical references for surrounding rock control in deep intense-mining and large-deformation roadways.

6 January 2025 in Processes
Verified
Journal Article
Open access
PDF file
SYShuaifeng Yin
Shuaifeng Yin
XZXubo Zhao
Xubo Zhao
EWEn Wang
En Wang
YYYitao Yan
Yitao Yan
KHKanglei Han
Kanglei Han
YWYibo Wang
Yibo Wang
Aiming to address the challenges of determining the coal pillar’s width and managing the significant deformation of the surrounding rock in the deep gob-side entry driving, the limiting equilibrium zone theory, employing the operational area of Dongpang Mine 21110 as the engineering setting, states that a coal pillar’s appropriate width in the gob-side entry driving falls between 7.9 and 9.8 m. The pattern of vertical stress distribution and the extent of the plastic zone in the roadway for coal pillar widths of 7.0 m, 8.0 m, 9.0 m, and 10.0 m are analyzed, respectively, investigated using the numerical simulation method of FLAC3D. The acceptable coal pillar width in the deep gob-side entry driving is 8.0 m. Combined with the roadway surrounding rock borehole inspection results, the fracture development condition of the roadway’s full-face surrounding rock is determined, and the asymmetric aberration characteristics, with significant surrounding rock damage depth at the coal pillar flank location, are obtained. Based on the theoretical calculations, an integrated proposal for a “non-symmetrical bolt and cable anchor” coupling support scheme for the surrounding rock in the gob-side entry driving is put forward. This was applied at the Dongpang coal mine site. Engineering practice shows that leaving an 8.0 m coal pillar width and adopting the “non-symmetrical bolt and cable anchor” support system design can control the deformation of the surrounding rock in the track entry at a reasonable range, which ensures the stability of the surrounding rock in the gob-side entry driving.