YA Wen

Dr. YA Wen

Department of Engineering, University of Cambridge, Cambridge, Cambridgeshire, UK
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2020 in Automation in Construction
Verified
Journal Article
Closed access
MYMengtian Yin
Mengtian Yin
LTLlewellyn Tang
Llewellyn Tang
TZTongyu Zhou
Tongyu Zhou
YWYA Wen
YA Wen
RXRuohan Xu
Ruohan Xu
WDWu Deng
Wu Deng

27 April 2023 in Computer-Aided Civil and Infrastructure Engineering
Verified
Journal Article
Open access
MYMengtian Yin
Mengtian Yin
LTLlewellyn Tang
Llewellyn Tang
CWChris Webster
Chris Webster
XYXiaoyue Yi
Xiaoyue Yi
HYHuaquan Ying
Huaquan Ying
YWYA Wen
YA Wen

7 June 2021 in Facilities
Verified
Journal Article
Closed access
YWYA Wen
YA Wen
LTLlewellyn C.M. Tang
Llewellyn C.M. Tang
DHDaniel C.W. Ho
Daniel C.W. Ho
Purpose: This paper aims to propose a space-oriented solution as an interface enabling the knowledge transfer between the building and the facilities management (FM) industry. Design/methodology/approach: The research gap is explored based on practical investigations in six large-scale hospitals in China. The theory of engineering systems integration inspires the proposed solution. A practical scenario is demonstrated to explain the workflow of this solution. Findings: It is founded that lagging information updates of FM systems in hospital project are one of the main reasons for inefficient and costly FM workflow. Building information modelling (BIM) model could provide accurate building information to the FM systems at the building handover stage. However, few researchers focus on the continuous information transfer solution from the BIM model to FM systems during the building in-use phase. An interface should be established for the “conversation” between the frequent changes of building and the FM systems in the post-construction period. Practical implications: The information updates in three FM systems due to space changes in a hospital project is considered as a practical scenario in this paper. It is presented with the workflow and the data logic chain. Originality/value: The originality of this paper is to propose a solution to integrate the space information provided by the BIM model with the parameters of particular FM systems. This solution deploys a BIM model for the FM industry. The solution could allow the FM personnel to ease operations and maintenance workflow by updating the space information in the BIM model.

23 November 2023 in Buildings
Verified
Journal Article
Open access
PDF file
LXLizhao Xiao
Lizhao Xiao
LTLlewellyn Tang
Llewellyn Tang
YWYA Wen
YA Wen
The building construction industry in mainland China is distinguished by one of the highest accident rates and numbers of fatalities. Therefore, risk assessment plays a significant role in preventing safety incidents and economic losses. However, traditional risk assessment methods are mainly experience-based which could introduce significant uncertainties in accident chain estimation, quantitative analysis, and handling with uncertainty. Safety accidents are difficult to estimate, which might lead to inappropriate safety-related decision making. To solve this problem, an innovative quantitative analysis strategy has been developed, generating a loss index for various accidents in the construction site, based on the Bayesian Network and Analytic Hierarchy Process solution. In this solution, the contribution rate of every risk factor to a certain accident can be calculated. Based on those, the loss index of each construction site can be calculated by inputting current risk factors in the construction site. Moreover, the real-time loss index can be estimated which can help the management team with more accurate decision making compared with the traditional approaches. With this model, the safety situation on the construction site can be clarified and the risk priority can be analyzed according to the dynamic condition.

22 November 2025 in ISPRS Journal of Photogrammetry and Remote Sensing
Verified
Journal Article
Closed access
YWYA Wen
YA Wen
YQYutong Qiao
Yutong Qiao
CLChi Chiu Lam
Chi Chiu Lam
IBIoannis Brilakis
Ioannis Brilakis
SLSanghoon Lee
Sanghoon Lee
Mun On WongMun On Wong
Mun On Wong

14 July 2024
Verified
Conference Paper
Open access
PDF file
YWYA Wen
YA Wen
MWMudan Wang
Mudan Wang
MAMahendrini Ariyachandra
Mahendrini Ariyachandra
RWRan Wei
Ran Wei
IBIoannis Brilakis
Ioannis Brilakis
LXLizhao Xiao
Lizhao Xiao
Automatic construction of the building geometric digital twins (gDTs) is implemented based on the scanned data from the existing buildings. The highly detailed gDTs necessitates the top-down construction method informed by the predefined building knowledge. This paper reviews the building rules used for the model-driven building indoor environment gDTs construction. It is found that these knowledge is fragmented and lacks systematic analysis. The research categorise these rules into three groups and proposes an Ontology-based knowledge graphs (KGs) approach for organising this knowledge. This method aims to integrate rules for gDT construction to establish a knowledge system for the further research.