Ye Li

Dr. Ye Li

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2021 in Engineering Geology
Verified
Journal Article
Open access
Ye LiYe Li
Ye Li
SUStefano Utili
Stefano Utili
DMDavid Milledge
David Milledge
LCLixia Chen
Lixia Chen
KYKunlong Yin
Kunlong Yin


19 May 2023 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
ZTZeng Taorui
Zeng Taorui
KYKunlong Yin
Kunlong Yin
LGLei Gui
Lei Gui
DPDARIO PEDUTO
DARIO PEDUTO
LWLiyang Wu
Liyang Wu
Ye LiYe Li
Ye Li

14 June 2024 in Landslides
Verified
Journal Article
Open access
PDF file
Ye LiYe Li
Ye Li
XXXiaoxu Xie
Xiaoxu Xie
BJBijing Jin
Bijing Jin
LCLixia Chen
Lixia Chen
Xin LiangXin Liang
Xin Liang
KYKunlong Yin
Kunlong Yin
Landslide-induced tsunamis in reservoirs often pose greater risks than landslides themselves. Existing studies and mitigation practices have prioritized increasing landslide stability to meet safety standards, incurring high costs and lacking sustainability. More than 5000 landslides have developed along the Three Gorges Reservoir banks in China, and some may trigger tsunamis. To effectively and sustainably manage risk of landslide-tsunami hazard chains (LTHC), we propose a new framework (based on quantitative risk analysis) involves decision-making based on risk characteristics and local economies, a strategy for selecting optimal risk control plan through cost–benefit analyses that consider long-term effectiveness and adverse effects, and dynamic management through iterative risk reassessment-recontrol cycles. The Liangshuijing landslide accelerated in 2009, posing a tsunami threat to the Yangtze River and coastal residents. Post-mitigation, the risks under four mitigation plans and combined scenarios were quantitatively evaluated. The mass removal plan reduces total risk by approximately 68%, less than the 80% reduction from the anti-slip pile plan, but with a 30-fold greater benefit–cost ratio (BCR). The surface drainage and monitoring network plans show limited long-term cost-effectiveness due to short measure lifetimes, however, their short-term BCRs exceed those of the mass removal plan due to lower direct costs. According to comprehensive long and short-term analyses, combined plans involving mass removal are the most cost-effective. Our results reveal how to select appropriate strategies for managing LTHC risk, how landslide mitigation controls tsunami risks, and how time-related parameters affect solution effectiveness. Our findings show that partially mitigating risks may provide more cost-effective and sustainable management of LTHCs than eliminating risks to negligible levels.

23 July 2025 in Engineering Geology
Verified
Journal Article
Closed access
YZYuhang Zhu
Yuhang Zhu
KYKunlong Yin
Kunlong Yin
Ye LiYe Li
Ye Li
HYHaoran Yang
Haoran Yang
HCHong Chen
Hong Chen
SSSamuele Segoni
Samuele Segoni

20 August 2024 in International Journal of Digital Earth
Verified
Journal Article
Open access
BJBijing Jin
Bijing Jin
SLShuhao Liu
Shuhao Liu
TZTaorui Zeng
Taorui Zeng
Ye LiYe Li
Ye Li
TWTengfei Wang
Tengfei Wang
KYKunlong Yin
Kunlong Yin