The fatigue performance of a roof-U rib weld on orthotropic steel bridge decks was studied by fatigue experiments on 40 specimens, considering the influences of amplitude, penetration rate, loading position, and steel strength. Influences of different factors on the fatigue life of crack initiation and specimen failure were studied by analysis of crack propagation in the weld and changes in stress amplitude. In addition, nominal stress amplitudes and hot spot stress amplitudes of the welds were compared and the suggested values of fatigue strength were proposed according to the test results. The study shows that increase of penetration rate can decrease the crack propagation rate and extend failure fatigue life. A larger steel strength can increase the fatigue strength of crack initiation. Under the same loading conditions, the fatigue life of crack initiation is about half of the failure fatigue strength. A nominal stress of 70 MPa and a hot spot stress of 75 MPa are recommended for fatigue strength of roof-U rib welds under the manufacturing process investigated here.
Statistical analysis of the measured traffic flow over the Nanjing No. 3 Yangtze River Bridge from 2006 to 2010 was conducted. The predictions of traffic flow growth model were established. Random traffic flow was simulated by Monte-Carlo method to study dynamic impact effects under vehicle load. Considering the dynamic impact effects and wheel mark transverse distribution, the nominal stress, hot spot stress, and notch stress in the steel bridge deck details was calculated. The results of three evaluation method were compared. Suggestions of analysis models and fatigue evaluation were proposed. The study showed that the maximum magnification coefficient of the dynamic impact effects was close to the suggestion of BS5400. The simplified model could be used to analysis local stress ignoring the superimposed effects of longitudinal multi-vehicles. The evaluated service life under hot spot stress was comparatively longer. In terms of bridge safety and convenience, notch stress for the roof weld and U rib-to-diaphragm weld and hot spot stress for diaphragm arc gap were more suitable for fatigue evaluation. And the roof weld was most likely to crack.
A composite beam, which consists of a Lightweight Aggregate Concrete Filled Steel Tube (LACFST), and a reinforced concrete slab deck, was investigated. Bending tests were performed to study its behaviour. Based on the test results and the assumptions therein, calculation methods proposed and design suggestions were proved by finite element analysis. The results shows that the composite beam had good ductility and high bearing capacity. The design bearing capacity can be calculated using a force balance method. The flexural stiffness, at the serviceability-level, can be found by superposition of the slab deck and LACFST beam stiffness. A three-line M-δ model was proposed for the lightweight aggregate concrete steel tube composite beam moment – deflection evolution. After validation by finite element analysis, the neutral axis was suggested as lying between the top of the steel tube and the bottom of the concrete deck when the composite beam failed.
9 October 2019 in International Journal of Steel Structures