Fernando Acebes

Prof. Fernando Acebes

orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 January 2021 in Journal of Industrial Engineering and Management
Verified
Journal Article
Open access
PDF file
JGJosé Manuel González-Varona
José Manuel González-Varona
ALAdolfo Lopez-Paredes
Adolfo Lopez-Paredes
DPDavid Poza
David Poza
FAFernando Acebes
Fernando Acebes
Purpose: The new competitive environment characterized by innovation and constant change is forcing a new organizational behavior. This requires a digital transformation of SMEs based on collective performance determinants. SMEs have particular characteristics that differentiate them from large companies and a model that allows them to identify, leverage and develop their digital capabilities can help them to advance in digital maturity.Design/methodology/approach: An in-depth review of the existing literature on digital transformation and organizational competence was carried out on Scopus and Web of Science to identify the digital challenges faced by SMEs, and what digital capabilities they have to develop to face these challenges. In order to obtain the necessary information for the refinement of organizational competence for digital transformation model, six experts were interviewed; three of them are academics and the other three are professionals with management responsibilities in SMEs. We used semi-structured interviews, to keep the interviews focused and facilitate cross-data analysis between experts. In addition, it allowed us the possibility of analyzing new relevant aspects that could arise during the interview.Findings: As a result of this study we have developed a refined model of organizational competence for digital transformation that allows SMEs to identify and develop the digital capabilities necessary to advance in the digital transformation, refined with the opinions of six experts consulted. We were able to observe the importance of organizational learning and organizational knowledge to advance the digital transformation of SMEs.Originality/value: The developed model is useful for SME managers to know what the initial starting situation is, what the digital gaps are and to be able to plan the actions to develop the necessary digital capabilities to advance towards digital maturity.

1 April 2014 in International Journal of Project Management
Verified
Journal Article
Closed access
FAFernando Acebes
Fernando Acebes
JPJavier Pajares
Javier Pajares
José Manuel GalánJosé Manuel Galán
José Manuel Galán
ALAdolfo Lopez-Paredes
Adolfo Lopez-Paredes

1 October 2015 in International Journal of Project Management
Verified
Journal Article
Closed access
FAFernando Acebes
Fernando Acebes
MPMaría Pereda
María Pereda
DPDavid Poza
David Poza
JPJavier Pajares
Javier Pajares
José Manuel GalánJosé Manuel Galán
José Manuel Galán

11 April 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
JGJosé Manuel González-Varona
José Manuel González-Varona
DPDavid Poza
David Poza
FAFernando Acebes
Fernando Acebes
FVFélix Villafáñez
Félix Villafáñez
JPJavier Pajares
Javier Pajares
ALAdolfo Lopez-Paredes
Adolfo Lopez-Paredes
Additive manufacturing of spare parts significantly impacts industrial, social, and environmental aspects. However, a literature review shows that: (i) academic papers on the adoption of additive manufacturing have focused mainly on large companies; (ii) the methods required by SMEs to adopt new technologies differ from those employed by large companies; and (iii) recent studies suggest that a suitable way to help small- and medium-sized enterprises (SMEs) to adopt new additive manufacturing technologies from the academic world is by presenting case studies in which SMEs are involved. Given the increasing number of global SMEs (i.e., SMEs that manufacture locally and sell globally), we claim that these companies need to be assisted in adopting spare-parts additive manufacturing for the sake of resource and environmental sustainability. To bridge this gap, the purpose of this article is to present a case study approach that shows how a digital supply chain for spare parts has the potential to bring about changes in business models with significant benefits for both global SMEs (more effective logistic management), customers (response time), and the environment (reduced energy, emissions, raw materials, and waste).

24 May 2024 in Humanities and Social Sciences Communications
Verified
Journal Article
Open access
PDF file
FAFernando Acebes
Fernando Acebes
JGJ. M. González-Varona
J. M. González-Varona
ALA. López-Paredes
A. López-Paredes
JPJ. Pajares
J. Pajares
The project managers who deal with risk management are often faced with the difficult task of determining the relative importance of the various sources of risk that affect the project. This prioritisation is crucial to direct management efforts to ensure higher project profitability. Risk matrices are widely recognised tools by academics and practitioners in various sectors to assess and rank risks according to their likelihood of occurrence and impact on project objectives. However, the existing literature highlights several limitations to use the risk matrix. In response to the weaknesses of its use, this paper proposes a novel approach for prioritising project risks. Monte Carlo Simulation (MCS) is used to perform a quantitative prioritisation of risks with the simulation software MCSimulRisk. Together with the definition of project activities, the simulation includes the identified risks by modelling their probability and impact on cost and duration. With this novel methodology, a quantitative assessment of the impact of each risk is provided, as measured by the effect that it would have on project duration and its total cost. This allows the differentiation of critical risks according to their impact on project duration, which may differ if cost is taken as a priority objective. This proposal is interesting for project managers because they will, on the one hand, know the absolute impact of each risk on their project duration and cost objectives and, on the other hand, be able to discriminate the impacts of each risk independently on the duration objective and the cost objective.

1 March 2013 in Procedia - Social and Behavioral Sciences
Verified
Journal Article
Open access
FAFernando Acebes
Fernando Acebes
JPJavier Pajares
Javier Pajares
José Manuel GalánJosé Manuel Galán
José Manuel Galán
ALAdolfo López-Paredes
Adolfo López-Paredes
26th IPMA World Congress. 2012, Crete, Greece,In this paper, we propose an innovative and simple graphical framework for project control and monitoring, to integrate the dimensions of project cost and schedule with risk management, therefore extending the Earned Value methodology (EVM). EVM allows Project managers to know whether the project has overruns (over-costs and/or delays), but project managers do not know when deviations from planned values are so important that corrective actions should be taken or, in case of good performance, sources of improvement can be detected. From the concept of project planned variability, we build a graphical methodology to know when a project remains “out of control” or “within expected variability” during the project lifecycle. To this aim, we define and represent new control indexes and new cumulative buffers. Five areas in the chart represent five different possible project states. To implement this framework, project managers only need the data provided by EVM traditional analysis and Monte-Carlo simulation. We also explore the sensitivity of the methodology to control variables.Project “Computational Models for Strategic Project Portfolio\ud Management”, supported by the Regional Government of Castile and Leon (Spain) with grant\ud VA056A12-2