Ki Il Song

Prof. Ki Il Song

Inha University, Department of Civil engineering
orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2017 in Journal of Environmental Management
Verified
Journal Article
Closed access
DDDeng Dai-Qiang
Deng Dai-Qiang
LLLang Liu
Lang Liu
ZYZ.L. Yao
Z.L. Yao
Ki Il SongKi Il Song
Ki Il Song
DLD.Z. Lao
D.Z. Lao

1 March 2020 in Construction and Building Materials
Verified
Journal Article
Closed access
LLLang Liu
Lang Liu
JXJie Xin
Jie Xin
Chao HuanChao Huan
Chao Huan
CQChongchong Qi
Chongchong Qi
WZWenwu Zhou
Wenwu Zhou
Ki Il SongKi Il Song
Ki Il Song


10 July 2013 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
MMMohd Mustaqim Mohd-Nordin
Mohd Mustaqim Mohd-Nordin
Ki Il SongKi Il Song
Ki Il Song
Gye-Chun ChoGye-Chun Cho
Gye-Chun Cho
ZMZainab Mohamed
Zainab Mohamed

23 April 2015 in Materials
Verified
Journal Article
Open access
PDF file
LLLang Liu
Lang Liu
Ki Il SongKi Il Song
Ki Il Song
DLDezheng Lao
Dezheng Lao
TKTae-Hyuk Kwon
Tae-Hyuk Kwon
Workability is a key performance criterion for mining cemented tailing backfill, which should be defined in terms of rheological parameters such as yield stress and plastic viscosity. Cemented tailing backfill is basically composed of mill tailings, Portland cement, or blended cement with supplementary cement material (fly ash and blast furnace slag) and water, among others, and it is important to characterize relationships between paste components and rheological properties to optimize the workability of cemented tailing backfill. This study proposes a combined model for predicting rheological parameters of cemented tailing backfill based on a principal component analysis (PCA) and a back-propagation (BP) neural network. By analyzing experimental data on mix proportions and rheological parameters of cemented tailing backfill to determine the nonlinear relationships between rheological parameters (i.e., yield stress and viscosity) and mix proportions (i.e., solid concentrations, the tailing/cement ratio, the specific weight, and the slump), the study constructs a prediction model. The advantages of the combined model were as follows: First, through the PCA, original multiple variables were represented by two principal components (PCs), thereby leading to a 50% decrease in input parameters in the BP neural network model, which covered 98.634% of the original data. Second, in comparison to conventional BP neural network models, the proposed model featured a simpler network architecture, a faster training speed, and more satisfactory prediction performance. According to the test results, any error between estimated and expected output values from the combined prediction model based on the PCA and the BP neural network was within 5%, reflecting a remarkable improvement over results for BP neural network models with no PCA.

1 May 2014 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
Ki Il SongKi Il Song
Ki Il Song
TOTae-Min Oh
Tae-Min Oh
Gye-Chun ChoGye-Chun Cho
Gye-Chun Cho
Cost-effective tunnel excavation can be achieved with the blasting method. Unfortunately, blasting technique brings with it blastinginduced vibration and noise, which can cause critical social problems such as public complaints. Thus, the development of a novel tunnel excavation method, one that can reduce the blasting-induced vibration, is strongly demanded for the effective management of urban spaces. Thus, this study introduces an innovative vibration-reduced excavation method that combines the conventional blasting technique with the precutting process and carries out a feasibility study of the proposed tunnel excavation method using three-dimensional finite element analyses. The micro-scale study focuses on the stopping holes and contour holes while the macro-scale study deals with the case of a real scale tunnel. From the micro-scale analyses, it can be deduced that the proposed method is effective for the reduction of blasting-induced vibration compared to the conventional line-drilling method. From the macro-scale simulation, it is found that the reduction of blasting-induced vibration is independent of the thickness of the precutting free surface but dependent on the depth of the precutting free surface. As the depth of the precutting free surface increases, blasting-induced vibrations as well as the depth of the excavation-damaged zone can be significantly reduced. Vibration energy induced by blasting does not transmit through the free surface and is trapped inside the target tunnel face. Guided blasting waves cause stress concentration at the target face and maximize the blasting efficiency. It is expected that the construction cost will decrease due to a decrease in the number of drilling holes, the weight of the explosive charges, the overbreak space, and the excavation-damaged zone. In particular, the reductions of the overbreak space and excavation-damaged zone enhance the safety of tunnel construction.