By integrating simulated annealing and the interactive best-compromise approach, this study proposed a method for determining economic dispatch in power systems while accounting for carbon emissions. To satisfy load demands and operational constraints, traditional economic dispatch is determined through the minimization of total power generation costs based on the power output of the generating units in a system. In the proposed method, carbon emissions are taken into consideration. A CO2 equivalent model was created that accounted for the various fuel types (e.g., coal, oil, and natural gas) used in power generation. The correlation between power generation costs and carbon emissions was determined according to CO2 emissions tradeoff and incremental cost-CO2 reduction curves. The proposed method was applied to the Taiwan Power Company system. The results indicated that the method was effective at determining the influence of CO2 emissions on power generation costs during off-peak, semi-peak, and peak hours, as well as daily load demands. The system enables the simultaneous consideration of economic and environmental benefits.
When large amounts of wind power and solar photovoltaic (PV) power are integrated into an independent power grid, the intermittent renewable energy destabilizes power output. Therefore, this study explored the unit commitment (UC) optimization problem; the ramp rate was applied to solve problems with 30 and 10 min of power shortage. The data of actual unit parameters were provided by the Taiwan Power Company. The advanced priority list method was used together with a combination of a generalized Lagrangian relaxation algorithm and a random feasible directions algorithm to solve a large-scale nonlinear mixed-integer programming UC problem to avoid local and infeasible solutions. The results showed that the proposed algorithm was superior to improved particle swarm optimization (IPSO) and simulated annealing (SA) in terms of the minimization of computation time and power generation cost. The proposed method and UC results can be effective information for unit dispatch by power companies to reduce the investment costs of power grids and the possibility of renewable energy being disconnected from the power system. Thus, the proposed method can increase the flexibility of unit dispatch and the proportion of renewable energy in power generation.
Quasi-resonant flyback (QRF) converters have been widely applied as the main circuit topology in power converters because of their low cost and high efficiency. Conventional QRF converters tend to generate higher average conducted electromagnetic interference (EMI) in the low-frequency domain due to the switching noise generated by power switches, resulting in the fact they can exceed the EMI standards of the European Standard 55022 Class-B emission requirements. The presented paper develops a novel frequency swapping control method that spreads spectral energy to reduce the amplitude of sub-harmonics, thereby lowering average conducted EMI in the low-frequency domain. The proposed method is implemented in a control chip, which requires no extra circuit components and adds zero cost. The proposed control method is verified using a 24 W QRF converter. Experimental results reveals that conducted EMI has been reduced by approximately 13.24 dBμV at 498 kHz compared with a control method without the novel frequency swapping technique. Thus, the proposed method can effectively improve the flyback system to easily meet the CISPR 22/EN55022 standards.
Taiwan possesses rich wind power. In addition, by using mature hydroelectric power generation technology, system costs and thermal power generation unit loads can be reduced. Regarding simulating wind velocity for wind power generation, this study forecast wind velocity based on the Weibull distribution. According to wind power generation data, predicted wind velocity was converted into the amount of generated electricity. Because of the unpredictability of wind power generation, dispatch cannot be instantly performed. Therefore, pumped storage hydroelectric power generation was used to supplement wind power generation during off-peak periods by storing wind energy in the form of potential energy; thus, hydroelectric power generation supplemented thermal power generation during peak periods. Regarding thermal power generation, this study used the priority list method to calculate unit commitments and used the particle swarm optimization method to calculate economic dispatch. This study performed simulations by using thermal power generation unit, wind power generation unit, and hydraulic power data. The simulation results were compared with the results obtained from existing algorithms. The results showed that the algorithms used in this study yielded accurate results in a short time and reduced the loads of thermal power generation units in a Taiwan Power Company case.
The present study analyzed light emitting diodes (LEDs) as an output load and used a Taylor series to describe the characteristic curve based on the exponential characteristic of voltage and current. A prototype circuit of a flyback LED driver system was established to verify whether the theory is consistent with actual results. This study focused on the exponential relationship of LED voltage and current. Conventional simulations usually used linear models to present LED loads. However, the linear model resulted in considerable error between simulation and actual characteristics. Therefore, this study employed a Taylor series to describe the nonlinear characteristic of an LED load. Through precise calculations with Mathcad computation software, the error was effectively reduced. Moreover, the process clarified the influence of temperature on LEDs, which benefited the characteristic analysis of the entire system. Finally, a realized circuit of 120 W flyback LED drivers was established for conducting theory verification, including theoretic analysis and evaluation of the system design process of the flyback converter. The circuit simulation software SIMPLIS was used to demonstrate the system model, which enabled quick understanding of the system framework established in this study. Regarding LEDs, a commercially available aluminum luminaire was used as the output load. The measured results of the actual circuit and the simulation results were remarkably consistent. For the same system at the same temperature, the error between the simulation and actual results was less than 3%, which proved the reliability of the Taylor series simulation.
This research aimed to explore the maximum connection capacity that distribution substations can withstand as well as the distribution status of the system's power flow when offshore wind farms are connected into the power grid in the Changbin area, and then make analyses into the transient stability of the system. It mainly used PSS/E power software to analyze the off-peak system of Taiwan Power Company in 2018, put forward the average and disperse grid connection methods and the grid connection method based on the loading rate of the line, and compared the maximum connection capacity of the area under the circumstance in which the power grid fails to establish (expand) lines, and then adopted the N-1 planning guideline when offshore wind farms are connected to different substations. In addition, this research also analyzed voltage regulation, low voltage right through analysis, and three-phase short circuit current in view of the power grid connected into the maximum capacity of wind farms, conducted fault simulation of different voltage grades and distances in view of the power grid, and observed the ability of the system to reply stably in the face of accidents. It was shown from the research results that offshore wind farms could allow the grid connection capacity of the Changbin area to reach 1.9GW after adopting the proposed grid connection methods. In addition, it was found through the analysis into transient stability, power flow, and other system impacts that the system could restore stable operations after removal of the fault, which complies with the provisions of the Planning Guideline for Power Transmission System and Technical Points for Parallel Connection of Renewable Energy Power Generation System of Taiwan Power Company.