At Institute of Modern Physics, a cw 35 keV, 20 mA intense proton source and the low energy beam transport system (LEBT) have been developed for China Initiative Accelerator Driven Sub-Critical reactor system. In order to ensure high quality transmission of the intense ion beam from the exit of ion source to Radio Frequency Quadrupole (RFQ), a low energy beam transport line is used to focus beam to the RFQ entrance and match the Twiss parameters to the RFQ requirements. The 35 keV, 20 mA ion beam extracted by a three-electrode extraction system from the ion source passes through the LEBT to the RFQ entrance and the root-mean-square emittance is measured to be less than 0.2 π mm mrad. The commissioning results of the ion source and low energy beam transport system are described in this paper. The beam quality and transmission efficiency are also studied.
Traction inverter is one of the most important part of traction drive system in the train, and the reliability of the traction inverter affects the normal operation of the entire train directly. In this paper operated the accelerated test on IGBT module of TNG15 type traction inverters in the Beijing metro firstly. Then calculated the failure rate of IGBT module through Arrhenius model, for the coupling element, used small-sample method of reliability evaluation to calculate the failure rate of it. Combined with the reliability parameters of other electronic components in the traction inverters, the qualitative analysis and did the quantitative analysis of traction inverter system through GO methodology. GO method is widely used in the defense industry and other large systems, but it is rarely involved in the small systems. This paper provides a method for the reliability assessment of traction inverter, and it provides an idea for the reliability assessment of the other converter components in the train traction transmission system.
In view of the problems of electric power wireless communication and to serve the power consumer better, the coverage problems in electric power system are analyzed, and multiple coverage problems are proposed. In order to deal with the coverage problems of an actual case in the power wireless private network, through the method of data processing and comparative analysis, multiple methods for enhanced coverage are proposed. The network coverage optimization scheme provides a technology support for electric power communication access network construction and late operation and lays the foundations for popularization and application of LTE power wireless private network.