Haekook Jung

Dr. Haekook Jung

Kangwon National University Department of Civil Engineering

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 May 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HJHaekook Jung
Haekook Jung
TOTopendra Oli
Topendra Oli
JNJeonghee Nam
Jeonghee Nam
KYKyong-Ku Yun
Kyong-Ku Yun
SKSeungwon Kim
Seungwon Kim
CPCheolwoo Park
Cheolwoo Park
Concrete pavement proportions are increasing in Korean expressways, resulting in increased maintenance cost. The length of degenerate concrete pavements that have exceeded the design life (20 years) was 1150 km in 2015 and 2605 km in 2020 and is expected to rapidly increase. To extend the service life of concrete pavements, life-cycle cost (LCC) analysis was conducted on asphalt and concrete overlays, based on the different maintenance methods. LCC analysis was performed when the shoulder was used and when it was not used between 6000 and 35,000 AADT traffic according to the two-lane and four-lane traffic. During overlay, one lane was completely blocked, and the value per vehicle was converted into the user cost using the Construction Analysis for Pavement Rehabilitation Strategies software, according to whether the shoulder was used to maintain the number of lanes. In addition, LCC analysis was conducted by examining the construction cost and life-cycle according to each overlay method. When the shoulder was used, the total construction cost decreased, owing to the reduction in user cost, indicating that the implementation of the traffic measure of using the road shoulder improves user satisfaction and cost. The asphalt overlay was observed to be more favorable than concrete overlay in terms of the initial total construction cost. However, under a 20-year cycle, the economic efficiency of concrete overlay was higher than that of asphalt overlay. After repairing the deteriorated target sections of concrete pavements, the overlay method (asphalt or concrete) ought to be selected according to the target service life for beneficial economic effect. Concrete overlay was to obtain about 20% or greater LCC effect compared to asphalt overlay, and at least 5% or more additional LCC effect obtained when the shoulder was used.

4 July 2020 in Materials
Verified
Journal Article
Open access
PDF file
HJHaekook Jung
Haekook Jung
YKYongjae Kim
Yongjae Kim
SKSeungwon Kim
Seungwon Kim
CPCheolwoo Park
Cheolwoo Park
JNJeong-Hee Nam
Jeong-Hee Nam
As jointed plain concrete pavements (JPCP) age in South Korea, the cost of pavement maintenance is increasing annually. To extend the life of jointed concrete pavements through preventive maintenance, this study used 2017 pavement management system data to analyze the effects of traffic volume, alkali–silica reaction (ASR) grade, age, smoothness, and damaged area on the remodeling index (RMI—a measure of expressway pavement condition). In addition, this study evaluates the final RMI as well as the corresponding pavement condition and change in RMI value after conducting preventive maintenance in lieu of resurfacing or overlaying. The results demonstrated that the effect of ASR grade increased as the RMI forecast year increased and that change in surface distress (△SD) increased with age (most intensively when the pavement was 15–20 years of age). Moreover, change in international roughness index (△IRI) increased with age and traffic volume (similarly within 15–20 years of pavement age). Hence, preventive maintenance is a must for sections with high traffic volume and age even if the RMI is low. Finally, performing repairs through preventive maintenance decreases the number of expressway sections requiring resurfacing and overlaying, thus extending the life of the concrete pavement.

28 February 2021 in International Journal of Highway Engineering
Verified
Journal Article
Closed access
HJHaekook Jung
Haekook Jung
SKSeungwon Kim
Seungwon Kim
JNJeong-Hee Nam
Jeong-Hee Nam
HPHee Mun Park
Hee Mun Park
JLJung Hun Lee
Jung Hun Lee
CPCheolwoo Park
Cheolwoo Park