Sepehr Abrishami

Dr. Sepehr Abrishami

orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2020 in Automation in Construction
Verified
Journal Article
Closed access
FEFaris Elghaish
Faris Elghaish
SASepehr Abrishami
Sepehr Abrishami
MHM. Reza Hosseini
M. Reza Hosseini

8 September 2020 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
FEFaris Elghaish
Faris Elghaish
SMSandra Matarneh
Sandra Matarneh
STSaeed Talebi
Saeed Talebi
MKMichail Kagioglou
Michail Kagioglou
MHM. Reza Hosseini
M. Reza Hosseini
SASepehr Abrishami
Sepehr Abrishami
Purpose: In this study, a critical literature review was utilized in order to provide a clear review of the relevant existing studies. The literature was analyzed using the meta-synthesis technique to evaluate and integrate the findings in a single context.Design/methodology/approach: Digital transformation in construction requires employing a wide range of various technologies. There is significant progress of research in adopting technologies such as unmanned aerial vehicles (UAVs), also known as drones, and immersive technologies in the construction industry over the last two decades. The purpose of this research is to assess the current status of employing UAVs and immersive technologies toward digitalizing the construction industry and highlighting the potential applications of these technologies, either individually or in combination and integration with each other.Findings: The key findings are: (1) UAVs in conjunction with 4D building information modeling (BIM) can be used to assess the project progress and compliance checking of geometric design models, (2) immersive technologies can be used to enable controlling construction projects remotely, applying/checking end users’ requirements, construction education and team collaboration.Practical implications: A detailed discussion around the application of UAVs and immersive technologies is provided. This is expected to support gaining an in-depth understanding of the practical applications of these technologies in the industry.Originality/value: The review contributes a needed common basis for capturing progress made in UAVs and immersive technologies to date and assessing their impact on construction projects. Moreover, this paper opens a new horizon for novice researchers who will conduct research toward digitalized construction.

24 August 2021 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
RBRoberto Brandín
Roberto Brandín
SASepehr Abrishami
Sepehr Abrishami
Purpose: The emergence of new digital technologies in the era of the Fourth Industrial Revolution presents a turning point that could change the fate of the traditional ways of designing, build and manage asset data. Disruptive technologies such as Blockchain and theInternet of things (IoT) are one of the main pillars that are driving this revolution. The integration of decentralised networks and automated workflows has the potential to become a pivotal factor in construction projects, especially in supply chain ecosystems within the off-site manufacturing field. Obstacles related to fragmented information, interoperability, transparency and “big data” management are the main drivers for change that the industry needs to address. Whilst organisations and users can automate workflows and processes by utilising IoT technology to transfer data without human-to-human or human-to-computer interaction, the interaction, storage and management of the data generated are not safe or reliable.Design/methodology/approach: The approach outlined in this paper addresses the challenges that IoT and centralised networks present. Blockchain, a peer-to-peer distributed database, offers the possibility to support and maintain the asset information without interruptions in all the stages of the life cycle. The synergy between these technologies, along with other techniques, methods and platforms (such as building information modeling (BIM)), based on a single environment, will support information traceability from the strategic definition to end of life.Findings: The framework of this study presents an excellent opportunity to apply new workflows and processes with the application of new technologies and protocols. It benefits from a well-established platform such as BIM to enable the coordination and management of digital assets as well as giving illustration and collaboration to the supply chain members. IoT and Blockchain are the other layers that work together with the third layer (BIM). This framework proposed the use of these platforms to ensure the information traceability of physical and digital assets, data automation and information management, in a dynamic supply chain ecosystem, bringing efficiency and transparency to stakeholders and users.Practical implications: This study provides an exploratory framework to be used by the supply chain members in offsite manufacturing, and the architecture, engineering and construction (AEC) industry in general, to track asset information throughout their entire life cycle securely and transparently.Originality/value: This paper contributes to the knowledge of IoT, Blockchain technology and BIM use in offsite manufacturing under the AEC industry. It provides a basis for future research by professionals, experts and academics regarding these technologies and their workflows.

1 October 2019 in Automation in Construction
Verified
Journal Article
Closed access
FEFaris Elghaish
Faris Elghaish
SASepehr Abrishami
Sepehr Abrishami
MHM. Reza Hosseini
M. Reza Hosseini
SASoliman Abu-Samra
Soliman Abu-Samra
MGMark Gaterell
Mark Gaterell

10 August 2020 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
FEFaris Elghaish
Faris Elghaish
SASepehr Abrishami
Sepehr Abrishami
M. Reza HosseiniM. Reza Hosseini
M. Reza Hosseini
SASoliman Abu-Samra
Soliman Abu-Samra
Purpose: The amalgamation of integrated project delivery (IPD) and building information modelling (BIM) is highly recommended for successful project delivery. However, IPD lacks an accurate cost estimation methodology at the “front-end” of projects, when little project information is available. This study aims to tackle this issue, through presenting analytical aspects, theoretical grounds and practical steps/procedures for integrating target value design (TVD), activity-based costing (ABC) and Monte Carlo simulation into the IPD cost structure, within a BIM-enabled platform.Design/methodology/approach: A critical review was conducted to study the status of cost estimation within IPD, as well as exploring methods and tools that can enhance the cost estimation process for IPD. Thereafter, a framework is developed to present the proposed methodology of cost estimation for IPD throughout its entire stages. A case project is used to validate the practicality of the developed solution through comparing the profit-at-risk percentage for each party, using both traditional cost estimation and the proposed solution.Findings: After applying the proposed IPD's cost estimation framework, on a real-life case project, the findings demonstrated significant deviations in the profit-at-risk value for various work packages of the project (approximately 100% of the finishing package and 22% of openings package). By providing a precise allocation of overhead costs, the solution can be used in real-life projects to change the entire IPD cost structure and ensure a fair sharing of risk–rewards among the involved parties in IPD projects.Practical implications: Using the proposed methodology of cost estimation for IPD can enhance the relationship among IPD's core team members; all revealed financial deficiencies will be considered (i.e. compensation structure, profit pooling), hence enhancing the IPD performance.Originality/value: This paper presents a comprehensive solution for integrating BIM and IPD in terms of cost estimation, offering three main contributions: (1) an innovate approach to utilise five-dimensional (5D) BIM capabilities with Monte Carlo simulation, hence providing reliable cost estimating during the conceptual TVD stage; (2) mathematical models that are developed through integrating ABC into the detailed 5D BIM to determine the three IPD's cost structure limbs; and (3) a novel mechanism of managing cost saving (rewards) through distinguishing between saved resources from organisation level, to daily task level, to increase trust among parties.

17 April 2019 in Construction Innovation
Verified
Journal Article
Closed access
HGHamed Golizadeh
Hamed Golizadeh
M. Reza HosseiniM. Reza Hosseini
M. Reza Hosseini
David John EdwardsDavid John Edwards
David John Edwards
SASepehr Abrishami
Sepehr Abrishami
NTNasrin Taghavi
Nasrin Taghavi
Saeed BanihashemiSaeed Banihashemi
Saeed Banihashemi
Extant literature extensively articulates the advantages of using remotely piloted aircrafts (RPAs) in a myriad of construction activities. Yet, the barriers that hinder their wider adoption on construction projects have received scant academic attention. This study aims at addressing this gap in the literature. This study reviews 59 papers published on the use of RPAs for construction activities and offers an evaluation of barriers to widespread adoption throughout the sector. Barriers are identified, collated and categorized into five thematic groups, namely, technical difficulties, restrictive regulatory environment, site-related problems, weather and organizational barriers. The paper contributes to knowledge by: signposting a need for reordering priorities when defining future research on RPAs, suggesting measures to address the barriers identified and providing pragmatic guidance for construction companies intending to use RPAs on their projects. Using the task–technology fit theory, the study uncovers that current RPA technology is an under-fit match for construction activities and represents a prominent barrier to adoption. This is a dissenting finding, given that past studies on RPAs have primarily focused upon addressing public acceptance, concerns and societal consequences. Enablers of the identified barriers are also collated from extant literature and contemporary practice and encapsulated in a conceptual model.