The problem of scheduling the commercial advertisements in the television industry is investigated. Each advertiser client demands that the multiple airings of the same brand advertisement should be as spaced as possible over a given time period. Moreover, audience rating requests have to be taken into account in the scheduling. This is the first time this hard decision problem is dealt with in the literature. We design two mixed integer linear programming (MILP) models. Two constructive heuristics, local search procedures and simulated annealing (SA) approaches are also proposed. Extensive computational experiments, using several instances of various sizes, are performed. The results show that the proposed MILP model which represents the problem as a network flow obtains a larger number of optimal solutions and the best non-exact procedure is one that uses SA.
11 December 2009 in International Journal of Production Research
The response time variability problem (RTVP) is an NP-hard combinatorial scheduling problem that has been recently formalised in the literature. The RTVP has a wide range of real-life applications such as in the automobile industry, when models to be produced on a mixed-model assembly line have to be sequenced under a just-in-time production. The RTVP occurs whenever products, clients or jobs need to be sequenced so as to minimise variability in the time between the instants at which they receive the necessary resources. In two previous studies, three metaheuristic algorithms (a multi-start, a GRASP and a PSO algorithm) were proposed to solve the RTVP. We propose solving the RTVP by means of the electromagnetism-like mechanism (EM) metaheuristic algorithm. The EM algorithm is based on an analogy with the attraction-repulsion mechanism of the electromagnetism theory, where solutions are moved according to their associated charges. In this paper we compare the proposed EM metaheuristic procedure with the three metaheuristic algorithms aforementioned and it is shown that, on average, the EM procedure improves strongly on the obtained results.
20 March 2018 in Journal of the Operational Research Society
This paper deals with a new flexible job-shop scheduling problem in which the objective function to be minimised is the sum of the earliness and tardiness costs of the jobs and the costs of the operations required to perform the jobs, the latter depending on the machine and the time interval in which they are performed (as happens in many countries with the costs of electric power or those of manpower). We formalise the problem with a mathematical model and we propose a heuristic procedure that is based primarily on constructing a multistage graph and finding in it the shortest path from the source to the sink. We also describe the generation of the data-set used in an extensive computational experiment and expose and analyse the obtained results.