In the paper, a non-invasive remote monitoring method of error of electricity energy meter is introduced and its achievable precision is investigated. The aim of the method is to determine remotely the smart energy meter active power relative measurement error using the reference energy meter connected at the input of a low voltage distribution grid segment. The meter error estimation is carried out despite other customers’ electrical load changes observable by the reference meter and power fluctuations in the distribution network. The method is based on the real time analysis of natural customer power consumption profiles without any additional load injection for error monitoring needs. A power step in the customer power consumption profile is detected by the meter under test and then the step magnitude is delivered for the comparison with the power step magnitude estimated synchronously by the reference meter. The analysis of the method error is conducted by applying simulation of the benchmark distribution grid which includes 26 energy meters and utilizing the open data power consumption profiles. It is shown that after two to three days of averaging (including approximately 170 power steps) of the meter error estimates it becomes possible to achieve an uncertainty of meter error estimation approximately 0.63 %. The feasibility of the method implementation scenarios with the state-of-the-art energy meter data collection protocols in advanced measurement infrastructure by means of occupancy index modeling is performed.
A high-voltage AC double-circuit 400 kV overhead power transmission line runs from the city of Elk (Poland) to the city of Alytus (Lithuania). This international 400 kV power transmission line is potentially one of the strongest magnetic field-generating sources in the area. This 400 kV voltage double-circuit overhead transmission line and its surroundings were analyzed using the mathematical analytical methods of superposition and reflections. This research paper includes the calculation of the numerical values of the magnetic field and its distribution. The research showed that the values of the magnetic field strength near the international 400 kV power transmission line exceed the threshold values permitted by relevant standards. This overhead power line is connected to the general (50 Hz) power system and generates a highly intense magnetic field. It is suggested that experimental trials should be undertaken in order to determine the maximum values of the magnetic field strength. For the purpose of mitigating these values, it is suggested that the height of the support bars should be increased or that any individual and commercial activities near the object under investigation should be restricted.
10 August 2018 in IEEE Transactions on Instrumentation and Measurement
A method for remote wattmeter (RW) adjustment is introduced in this paper. The estimated adjustment gain is intended for corrections of wattmeter's indications. Currently, legal metrology regulations do not allow such type of adjustment of certified instruments in the field. However, the proposed adjustment could be applicable in the areas of private or industrial subaccounting, home automation, and so on. If the achievable uncertainty could be specified, the method might be suggested for the wattmeter's calibration or verification. The implementation of remote adjustment becomes possible if both remote and reference wattmeters are connected to the same electrical grid and are equipped with a data communication channel. The main idea of the method is based on a temporary injection of the additional load at the location of remote device and acquisition of synchronized power readings by both reference and remote devices. The acquired readings are then processed to derive an adjustment gain of the RW. The proposed method aims to cancel an influence of the measurement unit propagating medium between the reference and remote devices. It is assumed that the characteristics of the medium are constant during the short period that is necessary to acquire readings. It is demonstrated that using the simulation of the proposed setup in the case of typical power losses in distribution lines, the adjustment gain can be estimated precisely. It is shown that in the case of remote measurement, the injected load power uncertainty can be reduced by averaging the acquired power samples.
The increasing number of zero-emission vehicles on the roads demands novel vehicle charging solutions that ensure convenience, safety, increased charging infrastructure availability, and aesthetics. Wireless charging technology is seen as the one that could assure these desirable properties and could be applied not just in conventional implementations but also in off-grid solutions together with roadway energy harvesting systems. Both approaches require proper transfer of energy metering methods. In this paper, a method for measuring the power transferred to the load in a wireless charging system is presented, and its systematic error is assessed in the relevant range of influencing factors. The novelty of the method is that it does not require any metrologically certified measurement instrumentation on the receiver side of the wireless charging system. The error analysis is performed using a numerical simulation. Considered error-influencing factors included secondary side electrical load, coils’ coupling coefficient and quality factor, current and voltage quantization resolution, and compensation topology type (serial-serial (SS) and serial-parallel (SP)). It was determined that the systematic error of the power assessment does not exceed 0.7% for SS and 1.1% for SP topologies when the coupling coefficient is in the range of 0.05 to 0.4 and the quality factor of the resonant system is in the range of 100 to 800.
The islanded mode of operation of an electric power system (EPS) that has generation capabilities provided by conventional thermal power plants, by a pumped-storage power station, or from an interlink with a neighboring electric power system through an HVDC BtB converter is addressed in this paper. The risk for electrical power systems to fall into an islanded mode has recently grown, as it is caused not just by technical reasons but by a geopolitical situation as well. The current strains demand the close consideration of problems related to EPS operation in an islanded mode. This paper considers several. The research covers the following issues. The response of the islanded system to a sudden and spasmodic load change is analyzed in cases when the system deals with the disturbance with internal resources alone and with the help of an HVDC BtB converter’s frequency control functionality. Analysis of the impact of the settings of the HVDC BtB converter on the system’s response to disturbances is presented and the optimal set of parameters found. The impact of the system’s extended inertia on the system’s response is evaluated by using an additional unit of the pumped-storage power station in synchronous condenser mode. Transients in the system when switching a unit operating in synchronous condenser mode on and off are analyzed. The capability of the system to withstand major disturbances, such as disconnection of the pumped-storage power station’s unit operating in a pump mode and disconnection of the HVDC BtB converter in emergency modes, if a situation demands, is researched. The research is carried out by numerical simulations using PSS Sincal Electricity Basic software. Updated operating parameters of the isolated power system and the LCC HVDC BtB converter, as well as frequency control automation provided by ABB, were used in the simulations.
Smart energy meters supporting bidirectional data communication enable novel remote error monitoring applications. This research targets characterization of the systematic worst-case error of the previously published remote watthour meter’s gain estimation method based on the comparison of synchronous measurements by the reference and meter under test. To achieve the research aim a methodology based on global maximization of the systematic error objective function assuming the typical low voltage electrical distribution network operation parameters ranges as defined by the standard recommendations for network design. To cross verify the reliability of the assessed solutions the suggested error analysis methodology was implemented utilizing two stochastic global extremum search techniques (genetic algorithms, pattern search) and the third one utilizing nonlinear programming solver. It was determined that the wattmeter adjustment gain worst-case error does not exceed 0.5% if the remote wattmeter monitored load power factor is larger than 0.1 and a network is designed according to the recommendation of the acceptable voltage drop less than 5%. For a load exhibiting power factor larger than 0.9 the worst-case error was found to be less than 0.1%. It is concluded therefore that considering the systematic worst-case error the previously suggested remote wattmeter adjustment gain estimation method is suitable for remote error monitoring of Class 2 and Class 1 wattmeters.